IP Library › Granted Patent US 10,603,684
Granted Patent B2
US 10,603,684 · App. 16/292,599 · Granted Mar 31, 2020

Multi-material dispensing and coating systems

Inventors: Michael Zenou (Hashmonaim, IL); Ziv Gilan (Kfar-harif, IL)
Assignee: IO Tech Group Ltd.
B05D1/26B05C5/0225B05C5/0279B05C11/025B05C11/026B05C11/1005B05D1/40B05D7/52B05D2252/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,603,684
App. No.
16/292,599
Granted
Mar 31, 2020
Kind
B2
Abstract

Systems and methods for dispensing liquid materials as may be used in applications for coating flexible films and the like. Such a film may be coated by dispensing a rheological material onto its surface while drawing the film through a gap between a pair of rollers. The gap defines the thickness of a layer of the material applied to the film and is maintained at a desired width by microwires positioned through the gap. Another film across the gap from that to which the rheological material is applied aids in the coating of the layer and a contact area of the second film may be adjusted relative to the gap, e.g., when changing materials or when the coating film becomes abraded or deformed.

Claims (8)

1. A method of coating a film, comprising dispensing a first rheological material onto a surface of a flexible film while drawing the flexible film through a gap between a pair of rollers, said gap defining a thickness of a layer of the first rheological material applied to the flexible film by being positioned after a coating area in which the first rheological material is applied to the flexible film in a direction of flexible film travel, and maintaining said gap at a width by positioning first microwires through the gap as the dispensing of the first rheological material takes place.

2. The method of claim 1 , wherein the flexible film to which the first rheological material is applied is opposed across the gap by a second film and further comprising, adjusting a contact area of the second film across the gap from the flexible film to which the first rheological material is applied.

3. The method of claim 2 , further comprising after adjusting the contact area of the second film dispensing a second rheological material to the surface of the flexible film.

4. The method of claim 1 , further comprising, during dispensing of the first rheological material, adjusting the width of said gap by exchanging the first microwires for second microwires of different thickness than the first microwires through the gap.

5. The method of claim 4 , wherein the flexible film to which the first rheological material is applied is opposed across the gap by a second film and further comprising, adjusting a contact area of the second film across the gap from the flexible film to which the first rheological material is applied.

6. The method of claim 1 , further comprising pausing dispensing of the first rheological material while exchanging the first microwires for second microwires of different thickness than the first microwires through the gap.

7. The method of claim 6 , wherein the flexible film to which the first rheological material is applied is opposed across the gap by a second film and further comprising, adjusting a contact area of the second film across the gap from the flexible film to which the first rheological material is applied.

8. The method of claim 1 , further comprising suspending dispensing of the first rheological material in favor of dispensing a second rheological material onto the surface of the flexible film, and adjusting the width of said gap by exchanging the first microwires for second microwires of different thickness than the first microwires through the gap.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 9, 2019
From: ZENOU, MICHAEL; GILAN, ZIV
To: IO TECH GROUP LTD.
Reel/Frame 050318/0791 →
Continuity (2)
Provisional Application 62643263 · Mar 15, 2018
Related Publication 20190283076A1 · Sep 19, 2019
Cited By (2)
US 12,194,488 US 12,746,565