IP Library Granted Patent US 11,123,664
Granted Patent B2
US 11,123,664 · App. 16/341,324 · Granted Sep 21, 2021

Screening apparatus

Inventor: Marshall Graham Bailey (Dubai, AE)
Assignee: National Oilwell Varco UK Limited
B01D33/0376B07B1/46B07B13/16B07B2201/04B07B2230/01E21B21/065
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,123,664
App. No.
16/341,324
Granted
Sep 21, 2021
Kind
B2
Abstract

A shale shaker includes a basket having a front, solids discharge end and a rear, feed end spaced apart by opposed first and second sides. The basket includes a lower, first, screen deck and an upper, second, screen deck directly above the first screen deck. The screening surfaces of the screen decks are spaced apart, by a vertical spacing of from 20 mm to 250 mm. There is a cavity above the feed receiving end of the first screen deck, in direct fluid communication with the space between the screening surfaces of the first and second screen decks ( ) that only receives feed that has passed through the upper, second, screen deck. The cavity extends to higher than the extreme end of the screening surface of the second screen deck, at its feed receiving end.

Claims (34)

1. A shale shaker comprising:

a basket having a solids discharge end and a feed end spaced apart by opposed first and second sides, and a fluid retaining wall positioned at the feed end;

said basket including a stack of screen decks, each screen deck having a screening surface, with the screening surface of the screen decks spaced apart and superposed one above the other;

wherein the stack of screen decks comprises at least a first screen deck and a second screen deck, wherein the second screen deck is directly above the first screen deck;

wherein the each of the first and second screen decks have a first end and a second end, wherein the first end is proximal to the fluid retaining wall, and the second end is distal to and higher than the first end;

wherein the screening surfaces of the first and second screen decks are spaced apart, by a vertical spacing of from 20 mm to 250 mm, at the first end of the second screen deck;

wherein the first end of the second screen deck is further from the feed end of the basket than the first end of the first-screen deck;

wherein there is a cavity above the first end of the first screen deck, in direct fluid communication with a space between the screening surfaces of the first and second screen decks, and is configured to only receive feed that has passed through the second screen deck;

wherein the cavity extends to higher than the screening surface of the second screen deck, at the first end of the second screen deck; and

wherein there is no outlet for solids and liquid from the cavity other than to the screening surfaces of the first and second screen decks and the space between them, and

wherein the cavity is directly above the screening surface of the first screen deck, at the first end of the first screen deck and extends at least across the full width of the screening surface of the first screen deck at the first end of the first screen deck.

2. The shale shaker of claim 1 wherein the vertical spacing between screening surfaces of the first and second screen decks is from 20 mm to 120 mm.

3. The shale shaker of claim 1 wherein the cavity is of a vertical height of from 115% to 1000% of the vertical spacing between the screening surfaces of the first and second screen deck, measured at the extreme end of the screening surface of the second screen deck, at the first end.

4. The shale shaker of claim 3 wherein the cavity is of a vertical height of from 115% to 500% of the vertical spacing between the screening surfaces of the first and second screen deck, measured at the extreme end of the screening surface of the second screen deck, at the first end.

5. The shale shaker of claim 1 wherein the cavity is defined by the first end of the first screen deck, the fluid retaining wall and a roof.

6. The shale shaker of claim 1 wherein the first end of the second screen deck is further from the feed end of the basket than the first end of the first screen deck by a horizontal displacement of from 25 mm to 500 mm.

7. The shale shaker of claim 1 wherein the vertical spacing between the screening surfaces of the first and second screen decks is constant, from the feed end of the basket towards the solids discharge end of the basket.

8. The shale shaker of claim 1 wherein the vertical spacing between the screening surfaces of the first and second screen decks converges, from the feed end of the basket towards the solids discharge end of the basket.

9. The shale shaker of claim 1 wherein the vertical spacing between the screening surfaces of the first and second screen decks diverges, from the feed end of the basket towards the solids discharge end of the basket.

10. The shale shaker of claim 1 wherein the length of each of the first and second screen decks, from the feed end of the basket to the solids discharge end of the basket is the same.

11. The shale shaker of claim 1 wherein the stack of screen decks comprises a third screen deck that is directly above the second screen deck;

wherein the third screen deck has a first end and a second end, wherein the first end is proximal to the fluid retaining wall and the second end of the third screen deck is distal to and higher than the first end of the third screen deck;

wherein the screening surfaces of the second and third screen decks are spaced apart, by a vertical spacing of from 20 mm to 250 mm, at the first end of the third screen deck;

wherein the first end of the third screen deck is further from the feed end of the basket than the first end of the second screen deck; and

wherein there is a second cavity, above the first end of the second screen deck in direct fluid communication with a space between the screening surfaces of the second and third screen decks, and is configured to only receive feed that has passed through the third screen deck; wherein the second cavity extends higher than the screening surface of the third screen deck at the first end of the third screen deck.

12. The shale shaker of claim 11 wherein the vertical spacing between the screening surfaces of the first and second screen decks at the first end of the second screen deck and between the screening surfaces of the second and third screen decks at the first end of the third screen deck is the same.

13. The shale shaker of claim 11 wherein the vertical spacing between the screening surfaces of the second and third screen decks is constant, from the feed end of the basket towards the solids discharge end of the basket.

14. The shale shaker of claim 11 wherein the length of each of the second and third screen decks, from the feed end of the basket to the solids discharge end of the basket is the same.

15. The shale shaker of claim 11 wherein the second end of each of the first, second and third screen decks, are vertically aligned.

16. The shale shaker of claim 11 wherein the second cavity extends above the first end of the second screen deck to the same height that the cavity extends above the first end of the first screen deck.

17. The shale shaker of claim 11 wherein the second cavity is of a height of from 115% to 1000% of the vertical spacing between the screening surfaces of the second and third screen decks measured at the first end of the third screen deck.

18. The shale shaker of claim 11 wherein the second cavity is defined by the first end of the second screen deck, the fluid retaining wall and a roof.

19. The shale shaker of claim 11 wherein the first end of the third screen deck is further from the feed end of the basket than the first end of the second screen deck by a horizontal displacement of from 25 mm to 500 mm.

20. The shale shaker of claim 11 wherein the first end of the first screen deck is connected to the fluid retaining wall and the first end of the second screen deck is connected to a downwards directed flange of the fluid retaining wall projecting towards the solids discharge end of the basket.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 9, 2023
From: NOV INTERNATIONAL HOLDINGS C.V.
To: GRANT PRIDECO, INC.
Reel/Frame 063955/0691 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2023
From: NATIONAL OILWELL VARCO UK LIMITED
To: NOV INTERNATIONAL HOLDINGS C.V.
Reel/Frame 063888/0932 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 14, 2021
From: AXIOM PROCESS LIMITED
To: NATIONAL OILWELL VARCO UK LIMITED
Reel/Frame 056529/0344 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 31, 2019
From: BAILEY, MARSHALL GRAHAM
To: AXIOM PROCESS LIMITED
Reel/Frame 049915/0595 →
Priority Claims (1)
GB 1617435 · Oct 14, 2016 · national
Continuity (1)
Related Publication 20200047091A1 · Feb 13, 2020