App. No. 16/362,170

POWER GRID SYSTEM AND METHOD OF DETERMINING POWER CONSUMPTION AT ONE OR MORE BUILDING CONNECTIONS IN A POWER GRID SYSTEM

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
16/362,170
Abstract

Power grid system and method of determining power consumption at one or more building connections in a power grid system. The power grid system comprises a power grid comprising a mains grid portion; a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion; for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.

Claims (9)

1 . A power grid system comprising:

a power grid comprising a mains grid portion;

a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion;

for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and

a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.

2 . A method of determining power consumption at one or more building connections in a power grid system, the method comprising:

metering power imported from a mains grid portion of the power grid system to a building associated with respective ones of the one or more building connections and power exported from the associated building into the mains grid portion using a first meter;

metering, for one or more of the building connections, power exported to the associated building from an auxiliary generator using a second meter disposed downstream from the first meter relative to the mains grid portion; and

determining power consumption at said one or more of the building connections based on readings from the first and from the second meters.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 22, 2024
From: KUMAR, VIKRAM
To: RAMBUTAN PTE LTD
Reel/Frame 066527/0011 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 22, 2024
From: RAMBUTAN PTE LTD
To: SUN ELECTRIC DIGITAL STREAM INC.
Reel/Frame 066645/0541 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 15, 2020
From: SUN ELECTRIC DIGITAL STREAM LTD.
To: VIKRAM KUMAR
Reel/Frame 053773/0823 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 15, 2020
From: PELOSO, MATTHEW
To: SUN ELECTRIC DIGITAL STREAM LTD.
Reel/Frame 053214/0502 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 15, 2020
From: SUN ELECTRIC PTE LTD.
To: SUN ELECTRIC DIGITAL STREAM LTD.
Reel/Frame 053215/0182 →