IP Library › Granted Patent US 11,053,664
Granted Patent B2
US 11,053,664 · App. 16/364,661 · Granted Jul 6, 2021

Hydraulic system for working machine

Inventors: Yuji Fukuda (Osaka, JP); Yoshimitsu Tanaka (Osaka, JP); Keigo Honda (Osaka, JP)
Assignee: KUBOTA CORPORATION
E02F9/2225E02F9/2267E02F9/2271E02F9/2275F15B11/16E02F9/2285E02F9/2292F15B2211/30505F15B2211/7053F15B2211/71
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,053,664
App. No.
16/364,661
Granted
Jul 6, 2021
Kind
B2
Abstract

A hydraulic system includes a hydraulic pump, a first hydraulic actuator, a second hydraulic actuator, a first control valve to control the first hydraulic actuator, and a second control valve to control the second hydraulic actuator, the second control valve being arranged on a downstream side of the first control valve. The hydraulic system includes a first fluid tube in which a return fluid flows toward the second control valve. The first fluid tube couples the first control valve to the second control valve. The hydraulic system includes a second fluid tube in which a supply fluid flows toward to the first hydraulic actuator. The second fluid tube being connected to the first hydraulic actuator. The hydraulic system further a third fluid tube in which the return fluid in the first fluid tube flows toward the second fluid tube.

Claims (17)

1. A hydraulic system of a working machine comprising:

a hydraulic pump to output an operation fluid;

a first hydraulic actuator;

a second hydraulic actuator;

a first control valve to control the first hydraulic actuator, the first control valve including a first input port, a second input port, a third input port, a first output port, a second output port, a third output port, a first inner fluid tube, a second inner fluid tube, a third inner fluid tube connecting the first inner fluid tube to the second inner fluid tube, a fourth inner fluid tube, and a discharge port connected to an operation fluid tank;

a second control valve to control the second hydraulic actuator; and

an external fluid tube to connect the first output port and the second output port to the second control valve, wherein

the first control valve is configured to be switched between a first position and a second position, and

the first control valve is configured, at the first position, so that

the operation fluid from the hydraulic pump flows into the first hydraulic actuator through the second input port and the second inner fluid tube,

a portion of the operation fluid from the first hydraulic actuator flows into the second control valve through the first inner fluid tube, the first output port, and the external fluid tube,

a remaining portion of the operation fluid from the first hydraulic actuator flows into the second inner fluid tube through the first inner fluid tube and the third inner fluid tube,

the operation fluid from the hydraulic pump flows into the second control valve through the third input port, the fourth inner fluid tube, and the third output port, and

the operation fluid from the first hydraulic actuator does not flow into the operation fluid tank through the first inner fluid tube and the discharge port.

2. The hydraulic system according to claim 1 , comprising:

a check valve arranged in the third inner fluid tube and configured to allow the operation fluid to flow from the first inner fluid tube into the second inner fluid tube, and prevent the operation fluid to flow from the second inner fluid tube into the first inner fluid tube.

3. The hydraulic system according to claim 1 , wherein the fourth inner fluid tube has a throttle arranged therein.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 26, 2019
From: FUKUDA, YUJI; TANAKA, YOSHIMITSU; HONDA, KEIGO
To: KUBOTA CORPORATION
Reel/Frame 048703/0494 →
Priority Claims (1)
JP JP2018-062415 · Mar 28, 2018 · national
Continuity (1)
Related Publication 20190301142A1 · Oct 3, 2019