IP Library › Granted Patent US 11,492,900
Granted Patent B2
US 11,492,900 · App. 16/433,185 · Granted Nov 8, 2022

Gas ratio volumetrics for reservoir navigation

Inventors: Mat Wright (Secret Harbour, AU); Nicklas Jeremias Ritzmann (Niedersachsen, DE)
Assignee: BAKER HUGHES, A GE COMPANY, LLC
E21B49/005E21B7/04E21B44/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,492,900
App. No.
16/433,185
Filed
Jun 6, 2019
Granted
Nov 8, 2022
Kind
B2
Art Unit
3672
USPC
175/24
Abstract

Methods and systems for controlling drilling operations are described. The methods include conveying a drilling tool from the earth surface into a wellbore and operating the drilling tool to drill in a drilling direction, wherein drilling mud is conveyed from the earth surface to the drilling tool and returned to the earth surface, obtaining gas data from the drilling mud that returns to the earth surface, determining a reservoir property from the gas data, and adjusting the drilling direction based on the determined reservoir property.

Claims (52)

1. A method for controlling a drilling operation, the method comprising:

conveying a drilling tool from the earth surface into a wellbore and operating the drilling tool to drill in a drilling direction, wherein drilling mud is conveyed from the earth surface to the drilling tool and returned to the earth surface;

receiving the returned drilling mud at a mud logger at the earth surface and obtaining gas ratio at the earth surface from the drilling mud using the mud logger;

normalizing the gas ratio by a function of rate of penetration or caliper;

determining a reservoir property from the normalized gas ratio, wherein the reservoir property comprises at least both a saturation and a permeability index; and

adjusting the drilling direction based on the determined reservoir property.

2. A system for controlling a drilling operation, the system comprising:

a drilling tool in a wellbore arranged to perform the drilling operation, the drilling operation having a drilling direction, wherein drilling mud is conveyed from the earth surface to the drilling tool and returned to the earth surface;

a mud logger configured to receive the drilling mud when it returns to the earth surface and operable to obtain gas concentration, gas composition, and/or gas ratio from the drilling mud that returns to the earth surface;

a control unit configured to normalize the gas concentration, gas composition, and/or gas ratio by a function of rate of penetration or caliper and determine a reservoir property from the normalized gas concentration, gas composition, and/or gas ratio, wherein the reservoir property comprises at least one of a hydrocarbon saturation and a permeability index; and

one or more geosteering components located at at least one of the earth surface and downhole configured to adjust the drilling direction based on the determined reservoir property.

3. The system of claim 2 , wherein the control unit is configured to:

normalize the gas concentration, gas composition, and/or gas ratio by a function of both rate of penetration and caliper; and

determine the reservoir property from the normalized gas concentration, gas composition, and/or gas ratio.

4. The system of claim 3 , wherein the reservoir property further comprises at least one of porosity, fluid type, zone information, fluid contacts, connectivity, and a fracture.

5. The system of claim 2 , wherein the control unit is configured to determine a region of interest of a reservoir based on the reservoir property, wherein the adjusting of the drilling direction is performed to maintain the wellbore within the region of interest.

6. The system of claim 2 , wherein the control unit is configured to continuously monitor the gas concentration, gas composition, and/or gas ratio and the reservoir property to confirm the drilling direction.

7. The system of claim 2 , wherein the control unit is configured to combine the reservoir property with at least one of resistivity data, gamma ray data, image data, density data, nuclear magnetic resonance data, and porosity data to create combined data and adjust the drilling direction based on the combined data.

8. The system of claim 2 , wherein the control unit is configured to combine the determined reservoir property with formation dip information and to adjust the drilling direction based on the determined reservoir property and the formation dip information.

9. The system of claim 2 , wherein the drilling direction is based on a well plan and the adjusting further comprises an adjustment of the well plan.

10. The system of claim 9 , wherein the well plan comprises a horizontal borehole section.

11. The system of claim 2 , wherein the reservoir property further comprises at least one of porosity, zone information, fluid contacts, connectivity, and a fracture.

12. A method for controlling a drilling operation, the method comprising:

conveying a drilling tool from the earth surface into a wellbore and operating the drilling tool to drill in a drilling direction, wherein drilling mud is conveyed from the earth surface to the drilling tool and returned to the earth surface;

logging, at the earth surface from the drilling mud returned to the earth surface, gas ratio from the drilling mud;

scaling the gas ratio by a scaling factor that is a function of a rate of penetration or caliper;

determining a reservoir property from the scaled gas ratio, wherein the reservoir property comprises at least both a saturation and a permeability index; and

adjusting the drilling direction based on the determined reservoir property.

13. A method for controlling a drilling operation, the method comprising:

conveying a drilling tool from the earth surface into a wellbore and operating the drilling tool to drill in a drilling direction, wherein drilling mud is conveyed from the earth surface to the drilling tool and returned to the earth surface;

receiving the returned drilling mud at a mud logger at the earth surface and obtaining gas concentration, gas composition, and/or gas ratio at the earth surface from the drilling mud using the mud logger;

normalizing the gas concentration, gas composition, and/or gas ratio by a function of rate of penetration or caliper;

determining a reservoir property from the normalized gas concentration, gas composition, and/or gas ratio, wherein the reservoir property comprises at least one of a hydrocarbon saturation and a permeability index; and

adjusting the drilling direction based on the determined reservoir property.

14. The method of claim 13 , wherein the normalizing of the gas concentration, gas composition, and/or gas ratio is by a function of both rate of penetration and caliper; and the reservoir property is determined from the normalized gas concentration, gas composition, and/or gas ratio.

15. The method of claim 14 , wherein the reservoir property further comprises at least one of porosity, fluid type, zone information, fluid contacts, connectivity, and fractures.

16. The method of claim 13 , further comprising determining a region of interest of a reservoir based on the reservoir property, wherein the adjusting of the drilling direction is performed to maintain the wellbore within the region of interest.

17. The method of claim 13 , further comprising continuously monitoring the gas concentration, gas composition, and/or gas ratio and the reservoir property to confirm the drilling direction.

18. The method of claim 13 , further comprising:

combining the reservoir property with at least one of resistivity data, gamma ray data, image data, density data, nuclear magnetic resonance data, and porosity data to create combined data; and

adjusting the drilling direction based on the combined data.

19. The method of claim 13 , further comprising combining the determined reservoir property with formation dip information and adjusting the drilling direction based on the determined reservoir property and the formation dip information.

20. The method of claim 13 , wherein the drilling direction is based on a well plan and the adjusting further comprises an adjustment of the well plan.

21. The method of claim 20 , wherein the well plan comprises a horizontal borehole section.

22. The method of claim 13 , wherein the reservoir property further comprises at least one of porosity, zone information, fluid contacts, connectivity, and a fracture.

23. A method for controlling a drilling operation, the method comprising:

conveying a drilling tool from the earth surface into a wellbore and operating the drilling tool to drill in a drilling direction, wherein drilling mud is conveyed from the earth surface to the drilling tool and returned to the earth surface;

receiving the returned drilling mud at a mud logger at the earth surface;

obtaining gas information at the earth surface from the drilling mud using the mud logger, wherein the gas information comprises one of (i) a gas ratio, (ii) the gas ratio and a gas concentration, (iii) the gas ratio and a gas composition, or (iv) the gas ratio, the gas concentration, and the gas composition;

normalizing at least a part of the gas information by a function of rate of penetration or caliper;

determining a reservoir property from the normalized gas information, wherein the reservoir property comprises at least both a saturation and a permeability index; and

adjusting the drilling direction based on the determined reservoir property.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 6, 2019
From: WRIGHT, MAT; RITZMANN, NICKLAS JEREMIAS
To: BAKER HUGHES, A GE COMPANY, LLC
Reel/Frame 049392/0387 →
Continuity (2)
Provisional Application 62683715 · Jun 12, 2018
Related Publication 20190376386A1 · Dec 12, 2019
Cited By (2)
US 12,234,725 US 12,742,385