IP Library Patent Application 16433887
Patent Application
App. No. 16/433,887

RACEWAYS AND SYSTEMS THEREOF

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
16/433,887
Abstract

Embodiments of the present disclosure describe a raceway comprising a sloped base with an apex, a divider extending upward from the apex, two side walls, each opposing and parallel to the divider sufficient to form two elongated channels on the sloped base; and at least two tapered ends in fluid communication with the channels, each tapered end including an end wall, a pit, and a sloped floor extending from the sloped base to the end wall or pit.

Claims (23)

1 . A raceway, comprising:

a sloped base with an apex,

a divider extending upward from the apex,

two side walls, each opposing and parallel to the divider sufficient to form two elongated channels on the sloped base; and

at least two tapered ends in fluid communication with the channels, each tapered end including:

an end wall,

an optional pit, and

an optional sloped floor extending from the sloped base to the end wall or pit.

2 . The raceway of claim 1 , wherein the divider minimizes turbulent flow in each channel.

3 . The raceway of claim 1 , wherein a length of the divider and apex is the same.

4 . The raceway of claim 1 , wherein a length of the divider is less than a length of the apex.

5 . The raceway of claim 1 , wherein the channels have a symmetric configuration.

6 . The raceway of claim 1 , wherein the channels have an asymmetric configuration.

7 . The raceway of claim 1 , wherein each channel includes one or more of an expansion zone, a contraction zone, and a non-expansion zone.

8 . The raceway of claim, wherein the expansion zone encourages settling of molts and/or wastes and the contraction zone increases a fluid flow rate.

9 . The raceway of claim 1 , wherein each of the two channels includes an expansion region and a contraction region and the corresponding expansion regions and contraction regions of the two channels have the same cross-sectional area and/or angle relative to a horizontal axis line along the length of the channels.

10 . The raceway of claim 1 , wherein the recovery zone encourages settling of molts and/or wastes.

11 . The raceway of claim 1 , wherein at least one of the recovery zones includes at least one corner insert.

12 . The raceway of claim 11 , wherein the at least one corner insert is rounded.

13 . The raceway of claim 11 , wherein the at least one corner insert is straight.

14 . The raceway of claim 1 , wherein the recovery zone further comprises one or more of an inlet and a pump.

15 . The raceway of claim 14 , wherein the inlet is included in the end wall and is provided in-line with an outlet channel.

16 . The raceway of claim 1 , wherein the raceway collects molts and/or removes wastes.

Assignments (5)
CHANGE OF NAME Recorded Feb 9, 2022
From: THE TRU SHRIMP COMPANY
To: THE TRU SHRIMP COMPANIES, INC.
Reel/Frame 058980/0786 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 20, 2019
From: RNI AQUACULTURE, LLC
To: THE TRU SHRIMP COMPANY
Reel/Frame 050442/0399 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 19, 2019
From: RALCO NUTRITION, INC.
To: RNI AQUACULTURE, LLC
Reel/Frame 050428/0844 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 17, 2019
From: GERVAIS, ROBERT H.
To: RALCO NUTRITION, INC.
Reel/Frame 050404/0710 →
SECURITY INTEREST Recorded Aug 2, 2019
From: THE TRU SHRIMP COMPANY
To: EAGLE ENERGY, LLC
Reel/Frame 049945/0297 →