IP Library › Granted Patent US 11,130,161
Granted Patent B2
US 11,130,161 · App. 16/461,413 · Granted Sep 28, 2021

High-strength corrosion-resistant composite chequered iron and manufacturing method therefor

Inventors: Bo Yan (Shanghai, CN); Sihai Jiao (Shanghai, CN); Xiaoming Xia (Shanghai, CN)
Assignee: BAOSHAN IRON & STEEL CO., LTD.
B21B9/00B23K20/00B23K20/02B23K20/04B23K20/22B23K20/227B23K31/02B32B15/01B32B15/011B32B15/012B32B15/013B32B15/04B32B15/043B32B15/18C21D8/0226C22C38/001C22C38/002C22C38/02C22C38/04C22C38/06C22C38/08C22C38/12C22C38/14C22C38/18C22C38/22C22C38/26C22C38/28C22C38/32C22C38/40C22C38/44C22C38/50C22C38/54C23C28/02C23C28/028C23C30/00C23C30/005B23K2101/18B23K2101/34B23K2103/04B23K2103/05B23K2103/166B23K2103/18C21D2211/005C21D2211/009Y10T428/12951Y10T428/12958Y10T428/12972Y10T428/12979Y10T428/12993Y10T428/2495Y10T428/24942Y10T428/26
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,130,161
App. No.
16/461,413
Granted
Sep 28, 2021
Kind
B2
Abstract

Disclosed are a high-strength corrosion-resistant cladding chequered steel and a manufacturing method therefor. The high-strength corrosion-resistant cladding chequered steel includes a substrate and a chequered cladding layer cladded on the substrate by single-sided or double-sided rolling. The mass percentages of the chemical elements of the substrate are: C: 0.01% to 0.20%, Si: 0.10% to 0.5%, Mn: 0.5% to 2.0%, Al: 0.02% to 0.04%, Ti: 0.005% to 0.018%, Nb: 0.005% to 0.020%, 0<B≤0.0003%, N≤0.006%, and the balance being steel and other inevitable impurities. The high-strength corrosion-resistant cladding steel plate has a high strength, a high corrosion resistance, a yield strength ≥470 MPa, a tensile strength ≥610 MPa, a shear strength ≥410 MPa, and an elongation ≥40%.

Claims (15)

1. A high-strength corrosion-resistant cladding chequered steel comprising a substrate and at least one chequered cladding layer cladded onto the substrate by rolling, wherein the at least one chequered cladding layer comprises a surface pattern applied thereto by a patterned roller, and the substrate comprises the following chemical elements in mass percentage:

C: 0.01% to 0.20%, Si: 0.10% to 0.5%, Mn: 0.5% to 2.0%, Al: 0.02% to 0.04%, Ti: 0.005% to 0.018%, Nb: 0.005% to 0.020%, 0<B<0.0003%, N<0.006%, and the balance being iron and other inevitable impurities;

wherein the substrate further comprises at least one of Ni, Cr and Mo in mass percentage: Ni<0.20%, Cr<0.20%, and Mo<0.10%; and

wherein the thickness of the at least one chequered cladding layer is in a range of 10% to 40% of the thickness of the high-strength corrosion-resistant cladding chequered steel.

2. The high-strength corrosion-resistant cladding chequered steel according to claim 1 , wherein the at least one chequered cladding layer is an austenitic stainless steel.

3. The high-strength corrosion-resistant cladding chequered steel according to claim 1 , wherein the substrate has a microstructure of ferrite plus pearlite.

4. The high-strength corrosion-resistant cladding chequered steel according to claim 1 , wherein there is a transition layer at a joint of the substrate and the at least one chequered cladding layer, and wherein the transition layer has a thickness of 200 μm or less.

5. The high-strength corrosion-resistant cladding chequered steel according to claim 1 , wherein the steel has a yield strength of 470 MPa or more, a tensile strength of 610 MPa or more, and a shear strength of 410 MPa or more.

6. A method for manufacturing the high-strength corrosion-resistant cladding chequered steel according to claim 1 , comprising the steps of:

(1) producing a substrate blank and a cladding layer blank;

(2) assembling the substrate blank and the cladding layer blank, obtaining a billet, and welded sealing all around the bonding surface of each layer, and then vacuuming;

(3) clad rolling: the billet is first heated at a temperature of 1100˜1180° C., and then multi-pass rolled, obtaining a cladding steel sheet, wherein the total reduction is not less than 70% and the final rolling temperature is not less than 900° C., a surface chequer is rolled in a last pass of the multi-pass rolling, wherein the reduction in the last pass is 10%˜20%;

(4) coiling after water-cooling.

7. The method according to claim 6 , wherein, in the step (3), the final rolling temperature is controlled to 920˜1000° C.

8. The method according to claim 6 , wherein, in the step (4), the coiling temperature is 500˜650° C.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2019
From: YAN, BO; JIAO, SIHAI; XIA, XIAOMING
To: BAOSHAN IRON & STEEL CO., LTD.
Reel/Frame 049401/0482 →
Priority Claims (1)
CN 201611037789.3 · Nov 23, 2016 · national
Continuity (1)
Related Publication 20190344315A1 · Nov 14, 2019