IP Library Granted Patent US 11,078,550
Granted Patent B2
US 11,078,550 · App. 16/463,777 · Granted Aug 3, 2021

Method for manufacturing quenched molding, method for manufacturing hot press steel material, and hot press steel material

Inventors: Yoshiaki Nakazawa (Tokyo, JP); Shinichiro Tabata (Tokyo, JP); Kazuo Hikida (Tokyo, JP); Toshiya Suzuki (Tokyo, JP); Atsuo Koga (Tokyo, JP); Koichi Hamada (Tokyo, JP)
Assignee: NIPPON STEEL CORPORATION
C21D1/18C21D9/48C22C38/001C22C38/002C22C38/02C22C38/04C22C38/26C22C38/28C22C38/32C21D2211/002C21D2211/008
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,078,550
App. No.
16/463,777
Granted
Aug 3, 2021
Kind
B2
Abstract

A method for manufacturing a quenched molding according to the present disclosure is a method including a first heat treatment process of heating a blanked steel material to a temperature higher than its Ac3 transformation point to perform austenite transformation, and then cooling to induce martensite transformation or bainite transformation, and a second heat treatment process of heating the steel material that has undergone the first heat treatment process to a temperature higher than the Ac3 transformation point to perform austenite transformation, and then cooling to induce martensite transformation. After the steel material has been heated to a temperature higher than the Ac3 transformation point in at least one process from out of the first heat treatment process or the second heat treatment process, molding is completed at a temperature higher than an Ar3 transformation point.

Claims (14)

1. A method for manufacturing a quenched molding, the method comprising:

a first processing comprising heating a blanked steel material to a first heat treatment temperature, the first heat treatment temperature being in a range of from an Ac3 transformation point+70° C. to the Ac3 transformation point+170° C., to perform austenite transformation, wherein the Ac3 transformation point is a temperature defined by Equation (1), and then cooling to induce martensite transformation or bainite transformation, wherein the blanked steel material has a chemical composition comprising, in mass %, C: from 0.3% to 0.8%, Si: from 0.001% to 2.0%, Mn: from 0.5% to 3.0%, P: not greater than 0.05%, S: not greater than 0.01%, sol. Al: from 0.001% to 1.0%, N: not greater than 0.01%, and B: not greater than 0.01%, and a remainder comprising Fe and impurities;

a second processing comprising heating the steel material that has undergone the first processing to a second heat treatment temperature, the second heat treatment temperature being in a range of from the Ac3 transformation point+20° C. to the Ac3 transformation point+100° C., to perform austenite transformation, and then cooling to induce martensite transformation, wherein a heating time from reaching said second heat treatment temperature until an end of heating in said second processing is 400 seconds or shorter; and

after the steel material has been heated to a temperature higher than the Ac3 transformation point in at least one of the first processing or the second processing, completing molding at a temperature higher than a Ar3 transformation point,

wherein:

Equation (1):

Ac3(° C.)=910−203×√C (mass %)+44.7×Si (mass %)−30×Mn (mass %)−11×Cr (mass %)+700×S (mass %)+400×Al (mass %)+50×Ti (mass %)

a rate of temperature increase in the first processing, defined as a rate of temperature increase until reaching the first heat treatment temperature, is at least 20° C./second; and

a rate of temperature increase in the second processing, defined as a rate of temperature increase until reaching the second heat treatment temperature, is at least 20° C./second.

2. The method for manufacturing a quenched molding of claim 1 , wherein a heating time from reaching the first heat treatment temperature in the first processing until an end of heating in the first processing is 400 seconds or shorter.

3. The method for manufacturing a quenched molding of claim 1 , wherein steel material processed in the first processing has a volume fraction of a martensite phase and a bainite phase of no greater than 90%.

4. The method for manufacturing a quenched molding of claim 1 , wherein a molding obtained after the second heating and cooling has a martensite structure volume fraction of at least 50%.

5. The method for manufacturing a quenched molding of claim 1 , wherein the cooling of the first processing is performed with the steel material in a clamped state in a mold.

6. The method for manufacturing a quenched molding of claim 1 , wherein the cooling of the second processing step is performed with the steel material in a clamped state in a mold.

Assignments (2)
CHANGE OF NAME Recorded Jan 17, 2020
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 051551/0102 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 30, 2019
From: NAKAZAWA, YOSHIAKI; TABATA, SHINICHIRO; HIKIDA, KAZUO; SUZUKI, TOSHIYA; KOGA, ATSUO; HAMADA, KOICHI
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 049325/0895 →
Priority Claims (1)
JP JP2016-229472 · Nov 25, 2016 · national
Continuity (1)
Related Publication 20190338381A1 · Nov 7, 2019