IP Library Granted Patent US 11,698,169
Granted Patent B2
US 11,698,169 · App. 16/471,075 · Granted Jul 11, 2023

Vessel for the transport of liquefied gas and method of operating the vessel

Inventors: Mark Andrew Hodgson (London, GB); Stephen Andrew Brown (London, GB)
Assignee: SHELL USA, INC.
F17C1/002F17C13/002F25J1/0025F17C2201/052F17C2221/033F17C2223/0123F17C2223/0161F17C2223/033F17C2223/043F17C2223/046F17C2225/0161F17C2225/033F17C2225/035F17C2225/044F17C2225/046F17C2227/0135F17C2227/0157F17C2227/039F17C2227/0339F17C2250/01F17C2265/034F17C2265/066F17C2270/0105
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,698,169
App. No.
16/471,075
Granted
Jul 11, 2023
Kind
B2
Abstract

A vessel for the transport of liquefied gas has a hull, a cargo storage tank arranged in the hull for storing liquefied gas and an engine to propel the ship. A compressor has a compressor inlet connected to a vapour space of the at least one cargo storage tank for receiving boil-off gas at a first pressure and a compressor outlet for supplying pressurized boil-off gas to the at least one engine at a second pressure exceeding the first pressure. A boil-off gas recovery system is provided for recovery of boil off gas. The boil-off gas recovery system has a cooling section with a cooling section inlet connected to the compressor outlet to recondense at least part of the pressurized boil-off gas and a boil-off gas storage tank having a boil-off gas storage tank inlet connected to the cooling section outlet for storing the recondensed pressurized boil-off gas.

Claims (21)

1. A method for the transport of liquefied gas, comprising:

transporting liquefied gas in a vessel, the vessel comprising:

a hull,

at least one cargo storage tank arranged in the hull for storing liquefied gas,

at least one engine to propel the vessel;

receiving boil-off gas at a compressor inlet of at least one compressor, the compressor inlet connected to a vapour space of the at least one cargo storage tank, at a first pressure (P 1 );

using the compressor to supply pressurized boil-off gas to the at least one engine at a second pressure (P 2 ) exceeding the first pressure;

diverting at least part of the pressurized boil-off gas to a boil-off gas recovery system for recovery of boil-off gas;

recondensing the at least part of the pressurized boil-off gas in a cooling section of the BOG recovery system to provide recondensed pressurized boil-off gas;

storing the recondensed pressurized boil-off gas in at least one recovery tank, wherein the recovery tank having a total volume for storing the recondensed pressurized boil-off gas being in the order of about 0.5% to 5% of the total volume of the at least one cargo tank.

2. The method of claim 1 , comprising the further step of:

providing vaporized boil-off gas from the at least one recovery tank to the at least one engine.

3. The method of claim 1 , further comprising:

operating the recondenser at a third pressure (P 3 ) being substantially the same or lower than the second pressure (P 2 ).

4. The method of claim 3 , further comprising:

providing the recondensed pressurized boil-off gas at a fourth pressure (P 4 ), the fourth pressure exceeding the third pressure (P 3 ), to a secondary pre-cooler inlet for heat exchange of the recondensed pressurized boil-off gas against the pressurized boil-off gas.

5. The method of claim 1 , wherein the storing step comprises: storing the recondensed pressurized boil-off gas in the at least one recovery tank at a storage pressure in a range from 6 bar and up to 25 bar.

6. The method of claim 1 , wherein the storing step comprises: storing the recondensed pressurized boil-off gas in at least one recovery tank for a period of at least one day.

7. The method of claim 6 , wherein the storing step comprises: storing the recondensed pressurized boil-off gas in at least one recovery tank for a period of at least 9 days.

8. The method of claim 7 , wherein the storing step comprises: storing the recondensed pressurized boil-off gas in at least one recovery tank for a period of at least 10 days.

9. The method of claim 8 , wherein a secondary pre-cooler outlet being connected to the recovery tank inlet.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 2, 2022
From: HODGSON, MARK ANDREW; BROWN, STEPHEN ANDREW
To: SHELL OIL COMPANY
Reel/Frame 061952/0765 →
CHANGE OF NAME Recorded Dec 2, 2022
From: SHELL OIL COMPANY
To: SHELL USA, INC.
Reel/Frame 062279/0373 →
CHANGE OF NAME Recorded Sep 27, 2022
From: SHELL OIL COMPANY
To: SHELL USA, INC.
Reel/Frame 061541/0961 →
Priority Claims (1)
EP 16206573 · Dec 23, 2016 · regional
Continuity (1)
Related Publication 20190323659A1 · Oct 24, 2019
Cited By (5)
US 12,590,678 US 12,624,798 US 12,638,134 US 12,693,070 US 12,704,223