System and method for cleaning a production tubing

Inventor: Lasse Haugland (Bryne, NO)
Assignee: Altus Invervention (Technologies) AS
E21B27/00E21B27/02E21B27/04E21B34/14E21B37/00E21B23/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,781,391
App. No.
16/472,569
Granted
Oct 10, 2023
Kind
B2
Abstract

A method of cleaning production tubing in a producing petroleum well comprising the steps: i) providing collection tool configured for both selectively collecting debris while residing downhole to obtain collected debris as well as selectively releasing collected debris while residing downhole; ii) lowering collection tool to specific location at certain depth into production tubing of the producing petroleum well where there is at least a partial choking of local production flow due to accumulated debris deposited on production tubing; iii) collecting accumulated debris with collection tool to obtain collected debris; iv) pulling collection tool to production zone of production tubing or downstream of production zone where there will be enough production flow during production to ensure lifting capacity for collected debris; and v) releasing collected debris into production zone of production tubing to obtain released debris being lifted by production flow when production is running. The invention leads to time and cost savings during cleaning of production tubing.

Claims (36)

1. Method of cleaning a production tubing ( 10 ) in a producing petroleum well while selectively collecting and releasing debris downhole, the method comprises steps of:

lowering a collection tool to a specific location at a certain depth into the production tubing of the producing petroleum well where there is at least a partial choking of a local production flow due to accumulated debris deposited on the production tubing;

collecting said accumulated debris with the collection tool to obtain collected debris;

pulling said collection tool to a production of the production tubing or downstream of said production zone having enough production flow during production of the producing petroleum well to ensure a lifting capacity for the collected debris; and

releasing said collected debris into the production tubing to obtain released debris being lifted by the production flow when production of the producing petroleum well is running.

2. The method in accordance with claim 1 , wherein the production of the producing petroleum well is started before releasing said collected debris.

3. The method in accordance with claim 1 , wherein the production of the producing petroleum well is started after releasing said collected debris.

4. The method in accordance with claim 3 , wherein releasing said collected debris is carried out during controlled movement of said collection tool.

5. The method in accordance with claim 3 , wherein the collection tool is placed below the production zone before the production of the producing petroleum well is started.

6. The method in accordance with claim 1 , wherein the method further comprises anchoring said collection tool during releasing said collected debris into the production tubing.

7. The method in accordance with claim 1 , wherein the method further comprises a step of anchoring said collection tool during the step of collecting said accumulated debris.

8. The method in accordance with claim 1 , wherein the released debris ( 94 ) is separated from the production flow at a surface of the petroleum well.

9. The method in accordance with claim 1 , wherein the steps of lowering said collection tool, collecting said accumulated debris, pulling said collection tool, and releasing said collected debris, are repeated until all accumulated debris is removed at the location of the partial choking to restore the production of the producing petroleum well at or underneath the specific location.

10. A collection tool assembly adapted to collect solid debris in a production tubing in a first state at a first production depth located toward an upstream end in a producing petroleum well having a first production flow and, in a second state different than the first state release collected solid debris at a second production depth located toward a downstream end in the producing petroleum well at having a second production flow, said collection tool assembly comprises:

a wireline tractor; and

a collection tool including a downstream end and an upstream end, the downstream end including means for connection to the wireline tractor; the upstream end including a rotatable drill;

at least one collection chamber located toward the upstream end and adapted to selectively collect the solid debris and at least a portion of the first production flow;

at least one release valve located toward the downstream end and adapted to, in the first state of the collection tool downhole, selectively release the portion of the first production flow while retaining the collected solid debris in the at least one collection chamber and, when in the second state of the collection tool downhole, selectively release the collected solid debris and a portion of the second production flow;

the wireline tractor connected to the collection tool, the collection tool moveable by way of the wireline tractor.

11. The collection tool assembly in accordance with claim 10 , the release valve further comprising a slideable friction member for engaging with the production tubing, wherein a relative position of the slideable friction member relative to the collection tool controls the release valve.

12. The collection tool assembly in accordance with claim 10 , wherein the collected debris is released at a downstream side (s 2 ) of the collection tool.

13. The collection tool assembly in accordance with claim 12 , wherein the collection tool leads the production flow of the producing petroleum well at least partially from an upstream side (s 1 ) through the at least one collection chamber of the collection tool to the downstream side (s 2 ) for washing out the collected debris.

14. The collection tool assembly in accordance with claim 10 , further comprising at least one of a pump and a transport screw in communication with the at least one collection chamber.

15. The collection tool assembly in accordance with claim 10 , wherein the collection tool includes a filling level sensor (S) indicator to indicate a filling level of the collection chamber.

16. The collection tool assembly in accordance with claim 10 comprising a docking station.

17. A collection tool assembly adapted to collect solid debris in a production tubing in a first state at a first production depth located toward an upstream end in a producing petroleum well having a first production flow and, in a second state different than the first state release collected solid debris at a second production depth located toward a downstream end in the producing petroleum well having a second production flow, said collection tool assembly comprises:

a wireline tractor; and

a collection tool including a downstream end and an upstream end, the downstream end including means for connection to the wireline tractor; the upstream end including a rotatable drill controllable between a drilling mode and non-drilling mode;

at least one collection chamber located toward the upstream end and adapted to selectively collect the solid debris and at least a portion of the first production flow;

at least one release port located toward the downstream end;

a filling level sensor indicator arranged to indicate a filling level of the at least collection chamber, a predetermined maximum fill level being less than a total fill level of the at least one collection chamber between an upstream side of the at least one collection chamber and the at least one release port, a first fill level being less than the predetermined maximum fill level;

at least one of a transport screw and pump;

wherein when in the drilling mode in the first state of the collection tool downhole and the filling level of the at least one collection chamber is less than the predetermined maximum fill level, the collection tool assembly selectively releases the portion of the first production flow through the at least one release port while retaining the collected solid debris in the at least one collection chamber and;

wherein when the fill level equals the predetermined fill level, the collection tool assembly transitions to the non-drilling mode and the second state of the collection tool downhole; and

wherein when in the non-drilling mode in the second state of the collection tool downhole, the collection tool assembly selectively releases the collected solid debris and a portion of the second production flow;

the wireline tractor connected to the collection tool, the collection tool moveable by way of the wireline tractor.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2019
From: HAUGLAND, LASSE
To: ALTUS INTERVENTION (TECHNOLOGIES) AS
Reel/Frame 049564/0173 →
Priority Claims (1)
NO 20162045 · Dec 22, 2016 · national
Continuity (1)
Related Publication 20190316443A1 · Oct 17, 2019