IP Library Granted Patent US 11,313,343
Granted Patent B2
US 11,313,343 · App. 16/476,923 · Granted Apr 26, 2022

Hydroelectric power generation system

Inventors: Takahiro Abe (Osaka, JP); Atsushi Suhara (Osaka, JP); Takahiro Yokoyama (Osaka, JP)
Assignee: DAIKIN INDUSTRIES, LTD.
F03B15/16H02P9/04H02P9/102F05B2220/32F05B2270/20F05B2270/335H02P2101/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,313,343
App. No.
16/476,923
Granted
Apr 26, 2022
Kind
B2
Abstract

A hydroelectric power generation system includes: a generator driven by the hydraulic turbine; a head adjuster adjusting an effective head of the hydraulic turbine; and a controller cooperatively executing: flow rate control for controlling the generator such that a flow rate in the hydraulic turbine is brought close to a target flow rate; and head adjusting control for adjusting the effective head of the hydraulic turbine using the head adjuster such that the effective head of the hydraulic turbine falls within a first range.

Claims (24)

1. A hydroelectric power generation system comprising:

a hydraulic turbine disposed in a channel through which a fluid flows;

a generator driven by the hydraulic turbine;

a head adjuster adjusting an effective head of the hydraulic turbine; and

a controller cooperatively executing: flow rate control for controlling the generator such that a flow rate in the hydraulic turbine is brought close to a target flow rate; and head adjusting control for adjusting the effective head of the hydraulic turbine using the head adjuster such that the effective head of the hydraulic turbine falls within a first range,

wherein an upper limit value of the first range is a determination value for determining whether or not the operation point of the hydraulic turbine has reached a cavitation region,

wherein if a condition indicating that the effective head of the hydraulic turbine is larger than the upper limit value of the first range is satisfied, the controller executes, as the head adjusting control, first control for reducing the effective head of the hydraulic turbine using the head adjuster to return an operation point of the hydraulic turbine from the cavitation region to a proper operation region, the first control comprising reducing an opening degree of the head adjuster by a first predetermined opening degree,

wherein if a condition indicating that the effective head of the hydraulic turbine is smaller than a lower limit value of the first range is satisfied, the controller executes, as the head adjusting control, second control for increasing the effective head of the hydraulic turbine using the head adjuster to return the operation point of the hydraulic turbine from an inoperable operation point to the proper operation region, the second control comprising increasing the opening degree of the head adjuster by a second predetermined opening degree,

the lower limit value of the first range is a determination value for determining whether or not the operation point of the hydraulic turbine has reached an operating limit curve, and

the operation limit curve corresponds to a boundary of an operation point where it is not possible to adjust the flow rate in the hydraulic turbine.

2. The hydroelectric power generation system of claim 1 , wherein

after executing the first control, if a condition indicating that the effective head of the hydraulic turbine is larger than a predetermined threshold value smaller than the upper limit value of the first range is satisfied, the controller further reduces the effective head of the hydraulic turbine using the head adjuster.

3. The hydroelectric power generation system of claim 1 , wherein

after executing the second control, if a condition indicating that the effective head of the hydraulic turbine is smaller than a predetermined threshold value larger than the lower limit value of the first range is satisfied, the controller further increases the effective head of the hydraulic turbine using the head adjuster.

4. The hydroelectric power generation system of claim 1 , wherein

the controller executes the flow rate control and the head adjusting control at different timings.

5. The hydroelectric power generation system of claim 1 , wherein

the controller cooperatively executes: the flow rate control; and generated electric power control for adjusting the effective head of the hydraulic turbine using the head adjuster such that electric power generated by the generator is brought close to a target electric power.

6. The hydroelectric power generation system of claim 5 , wherein

the controller executes the flow rate control and the generated electric power control at different timings.

7. The hydroelectric power generation system of claim 5 , wherein

in the generated electric power control, the controller adjusts the effective head of the hydraulic turbine using the head adjuster such that the electric power generated by the generator is brought close to a maximum generated electric power.

8. The hydroelectric power generation system of claim 1 , wherein

the head adjuster is configured as a valve disposed in series with the hydraulic turbine in the channel.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 11, 2019
From: ABE, TAKAHIRO; SUHARA, ATSUSHI; YOKOYAMA, TAKAHIRO
To: DAIKIN INDUSTRIES, LTD.
Reel/Frame 049725/0654 →
Priority Claims (2)
JP JP2017-009355 · Jan 23, 2017 · national
JP JP2017-009358 · Jan 23, 2017 · national
Continuity (1)
Related Publication 20190331086A1 · Oct 31, 2019