IP Library › Granted Patent US 11,091,994
Granted Patent B2
US 11,091,994 · App. 16/483,566 · Granted Aug 17, 2021

Method of refracturing in a horizontal well

Inventors: Sergey Dmitrievich Parkhonyuk (Novosibirsk, RU); Evgeny Pavlovich Korelskiy (Tyumen, RU); Kreso Kurt Butula (Moscow, RU); Andrey Sergeevich Konchenko (Menlo Park, CA); Valeriy Anatolievich Pavlov (Tyumen, RU)
Assignee: Schlumberger Technology Corporation
E21B43/267E21B33/134E21B41/0092E21B49/00E21B47/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,091,994
App. No.
16/483,566
Granted
Aug 17, 2021
Kind
B2
Abstract

A horizontal well may be refractured or reactivated by generating a geomechanical model to estimate the stress level in the formation; identifying zones with high, medium, and low stress levels in the formation; isolating existing fractures in the horizontal well; injecting a fracturing fluid into the well to create at least one new fracture in a zone with a low stress level and packing the created fracture with proppant to increase the stress level in the zone; isolating the at least one newly created fracture; initiating refracturing in the zone with the high and/or medium stress level; identifying a location of the refracturing crack in the zone with the high and/or medium stress level; and developing the refracturing crack and packing it with proppant.

Claims (15)

1. A method of refracturing in a horizontal well, which comprises: (a) generating a geomechanical model to estimate the stress level in a formation; (b) identifying zones along the horizontal well with high, medium, and low stress levels in the formation around the well based on the generated geomechanical model of the formation, wherein the stress levels between different intervals differ by more than 1 bar; (c) isolating existing fractures in the horizontal well; (d) injecting a fracturing fluid into the well to create at least one new fracture in a zone with a low stress level and packing the newly created fracture with proppant to increase the stress level in the zone; (e) isolating at least one fracture created at stage (d); (f) initiating refracturing in the zone with a high and/or medium stress level identified at stage (b); (g) identifying a location of the refracturing crack in the zone with a high and/or medium stress level; (i) developing the refracturing crack and packing it with proppant.

2. The method of claim 1 , wherein the isolation of the fractures at stages (c) and (e) is achieved by injecting slugs of a plugging agent.

3. The method of claim 1 , wherein the development of the refracturing crack and its packing with proppant at stage (i) are performed in the zone with a high and/or medium stress level in the formation around the well identified at stage (b).

4. The method of claim 1 , wherein the geomechanical model is generated on the basis of the temporal evolution of the 3D distribution of formation stress and pore pressure.

5. The method of claim 1 , wherein the geomechanical model is generated on the basis of the temporal evolution of the 2D distribution of formation stress and pore pressure.

6. The method of claim 1 , wherein the amount of the fracturing fluid with proppant for creating the fracture at stage (d) is within the range of 5% to 50% of the fracturing fluid amount with proppant for refracturing.

7. The method of claim 1 , wherein the hydraulic fracturing operation at stage (d) in the zone with the low stress level increases the stress level by at least 5 bar.

8. The method of claim 1 , wherein, after hydraulic fracturing at stage (d), the new stress level in the formation around the well is additionally determined using the geomechanical model.

9. The method of claim 1 , wherein the location identification of the refracturing crack at stage (g) is performed by pumping a viscous marker pulse in the well and registering the resulting pressure response in the fluid.

10. The method of claim 1 , wherein the location identification of the refracturing crack at stage (g) is performed by registering tube waves in the well.

11. The method of claim 1 , wherein the hydraulic fracturing operation at stage (d) is performed by pumping a slurry of a high-strength ceramic sand and/or quartz sand.

12. The method of claim 1 , wherein stage (i) is repeated in the zone with the high and/or medium stress level in the formation around the well identified at stage (b).

13. The method of claim 1 , wherein the operation of injecting the fracturing fluid is performed using a multizonal arrangement comprising, e.g., a liner, packers, frac collars.

14. The method of claim 1 , wherein the operation of injecting the fracturing fluid is performed in an open-hole horizontal well.

15. A method of reactivating an injection horizontal well, which comprises: (a) generating a geomechanical model to estimate the stress level in a formation; (b) identifying zones with high, medium, and low stress levels in the formation around the well based on the generated geomechanical model of the formation, wherein the stress levels between different intervals differ by more than 1 bar; (c) isolating existing fractures in the horizontal well; (d) injecting a fracturing fluid into the well to create at least one new fracture in a zone with a low stress level and packing the newly created fracture with proppant to increase the stress level in the zone; (e) isolating at least one fracture created at stage (d); (f) initiating refracturing in the zone with the high and/or medium stress level identified at stage (b); (g) identifying a location of the refracturing crack in the zone with a high and/or medium stress level; (i) developing the refracturing crack and packing it with proppant; (k) pumping the injecting fluid into the formation to increase the formation pressure or improve the oil recovery factor.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2019
From: PARKHONYUK, SERGEY DMITRIEVICH; KORELSKIY, EVGENY PAVLOVICH; BUTULA, KRESO KURT; KONCHENKO, ANDREY SERGEEVICH; PAVLOV, VALERIY ANATOLIEVICH
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 049995/0741 →
Continuity (1)
Related Publication 20200024937A1 · Jan 23, 2020