IP Library Granted Patent US 11,378,943
Granted Patent B2
US 11,378,943 · App. 16/496,604 · Granted Jul 5, 2022

Information processing device, information processing method, and program

Inventors: Shintaro Kumano (Tokyo, JP); Makoto Kishi (Tokyo, JP); Keisuke Yamamoto (Tokyo, JP); Katsuhiko Abe (Yokohama, JP)
Assignee: MITSUBISHI HEAVY INDUSTRIES, LTD.
G05B19/41885G05B19/4183G05B19/41865G05B2219/24075G05B2219/32371G05B2219/37252G06F30/15G06F30/17G06F30/18G06F30/20G06F30/32G06F30/34G06F2119/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,378,943
App. No.
16/496,604
Granted
Jul 5, 2022
Kind
B2
Abstract

In an information processing device according to the present invention, a statistics estimation unit estimates a value of a state quantity by using a statistical model constructed based on values of past state quantities of a target device. A physical estimation unit estimates a value of a state quantity by using a physical model constructed based on design data of the target device. A specification unit specifies a value to be used to manage the target device from the value estimated by the statistics estimation unit and the value estimated by the physical estimation unit based on deterioration of the target device with time.

Claims (20)

1. An information processing device comprising:

a statistics estimation unit configured to estimate a value of a state quantity by using a statistical model constructed based on values of past state quantities of a target device;

a physical estimation unit configured to estimate a value of a state quantity by using a physical model constructed based on design data of the target device; and

a specification unit configured to specify a value to be used to manage the target device from the value estimated by the statistics estimation unit and the value estimated by the physical estimation unit based on an amount of values of the past state quantities used to construct the statistical model.

2. The information processing device according to claim 1 , wherein the specification unit is configured to specify the value to be used to manage the target device based on predetermined application conditions of the physical model.

3. The information processing device according to claim 2 , wherein the specification unit is configured to specify the value to be used to manage the target device based on an operation time of the target device which is one of the predetermined application conditions.

4. The information processing device according to claim 1 , further comprising:

a notification unit configured to issue a notification in a case where a difference between the value estimated by the statistics estimation unit and the value estimated by the physical estimation unit is equal to or greater than a predetermined value.

5. The information processing device according to claim 1 , further comprising:

a model updating unit configured to update a statistical model based on the values of the past state quantities used to construct the statistical model,

wherein the specification unit is configured to specify the value to be used to manage the target device by using the updated statistical model.

6. The information processing device according to claim 1 , wherein the specification unit is configured to specify a weighted average value of the value estimated by the statistics estimation unit and the value estimated by the physical estimation unit using weights according to deterioration of the target device with time as the value to be used to manage the target device.

7. An information processing method comprising:

estimating a value of a state quantity by using a statistical model constructed based on values of past state quantities of a target device;

estimating a value of a state quantity by using a physical model constructed based on design data of the target device; and

specifying a value to be used to manage the target device from the value estimated using the statistical model and the value estimated using the physical model based on an amount of values of the past state quantities used to construct the statistical model.

8. A non-transitory computer readable medium comprising a program causing a computer to:

estimate a value of a state quantity by using a statistical model constructed based on values of past state quantities of a target device;

estimate a value of a state quantity by using a physical model constructed based on design data of the target device; and

specify a value to be used to manage the target device from the value estimated using the statistical model and the value estimated using the physical model based on an amount of values of the past state quantities used to construct the statistical model.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 25, 2022
From: MITSUBISHI POWER, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 059699/0992 →
CHANGE OF NAME Recorded Oct 28, 2020
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054196/0453 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 23, 2019
From: KUMANO, SHINTARO; KISHI, MAKOTO; YAMAMOTO, KEISUKE; ABE, KATSUHIKO
To: MITSUBISHI HEAVY INDUSTRIES, LTD.; MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 050463/0401 →
Priority Claims (1)
JP JP2017-065993 · Mar 29, 2017 · national
Continuity (1)
Related Publication 20210109511A1 · Apr 15, 2021