IP Library Granted Patent US 12,013,152
Granted Patent B1
US 12,013,152 · App. 16/544,402 · Granted Jun 18, 2024

Low-emissions heating, cooling and hot water system

Inventor: Elisabeth Jane Melia (Kensington, CA)
Assignee: HARVEST THERMAL, INC.
F24H9/2014F24D17/0089F24D17/02F24H15/375
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,013,152
App. No.
16/544,402
Granted
Jun 18, 2024
Kind
B1
Abstract

The present disclosure provides a method for operating the hydronic system, which includes monitoring, by a control unit, a volume of hot water in a hot storage tank via a first set of flowmeters and a volume of chilled water in a cold storage tank via a set of second flowmeters. A first outlet temperature of the hot water is monitored by the control unit, via a first temperature sensor and a second outlet temperature of the chilled water via a second temperature sensor. A heat pump unit is operated by control unit, for recharging the hot water and the chilled water within the hot storage tank and the cold storage tank respectively. The heat pump unit is operated when a respective predetermined limit reaches for at least one of the volume of the hot water, the volume of the chilled water, the first outlet temperature and second outlet temperature.

Claims (32)

1. A method for operating a hydronic system, the method comprising:

monitoring, by a control unit, a volume of hot water in a hot storage tank via a first set of flowmeters;

monitoring, by the control unit, a volume of chilled water in a cold storage tank via a second set of flowmeters;

monitoring, by the control unit, a first outlet temperature of the hot water exiting the hot storage tank via a first temperature sensor and a second outlet temperature of the chilled water exiting the cold storage tank via a second temperature sensor; and

operating, by the control unit, a heat pump unit for recharging the hot water and the chilled water within the hot storage tank and the cold storage tank respectively, the heat pump unit operated when a respective predetermined limit reaches for at least one of:

the volume of the hot water,

the volume of the chilled water,

the first outlet temperature, and

the second outlet temperature,

wherein the step of operating a heat pump unit comprises at least one of:

selectively operating the heat pump unit based on a cost, emissions and a schedule of operation of a power source for recharging the hot water, when at least one of the volume of hot water and the first outlet temperature have reached a respective predetermined limit, and

selectively operating the heat pump unit based on a cost, emissions and a schedule of operation of a power source for recharging the chilled water, when at least one of the volume of chilled water and the second outlet temperature have reached a respective predetermined limit.

2. The method as claimed in claim 1 , wherein the hot water and the chilled water are selectively routed to a thermal distributor via a pump, fluidically coupled to the hot storage tank, the cold storage tank and the enclosure.

3. The method as claimed in claim 1 , wherein the hot water or the chilled water is selectively routed to domestic hot water or domestic water supply.

4. The method as claimed in claim 1 , further comprising determining, by the control unit, a temperature of the hot water routed into a thermal distributor via a first temperature sensor configured in a conduit connecting the hot storage tank and the thermal distributor.

5. The method as claimed in claim 4 , further comprising operating, by the control unit, the heat pump unit for recharging the hot water within the hot storage tank, when the outlet temperature reaches a threshold limit.

6. The method as claimed in claim 1 , further comprising determining, by the control unit, a temperature of the chilled water routed into a thermal distributor via a second temperature sensor configured in a conduit connecting the cold storage tank and the thermal distributor.

7. The method as claimed in claim 6 , further comprising operating, by the control unit, the heat pump unit for recharging the chilled water within the cold storage tank, when the temperature reaches a threshold limit.

8. The method as claimed in claim 1 , wherein the hot storage tank includes the hot water settled on a top portion of the hot storage tank and a cold water settled on a bottom portion, the cold water routed to the heat pump unit for generating the hot water, the hot water generated in the heat pump unit is routed to the top portion for recharging the hot water within the hot storage tank.

9. The method as claimed in claim 1 , wherein the cold storage tank includes a lukewarm water settled on a top portion of the cold storage tank and the chilled water settled on a bottom portion of the cold storage tank, the lukewarm water is routed to the heat pump unit for generating the chilled water, the chilled water generated in the heat pump unit is routed to the bottom portion for replenishing the chilled water within the cold storage tank.

10. The method as claimed in claim 1 , further comprising determining, by the control unit, a time period required for recharging the volume of the hot water, the time period determined based on the volume of the hot water, the first outlet temperature and an operation cycle, the operation cycle being at least an on-peak operation cycle and an off-peak operation cycle, wherein the control unit is configured to:

operate the heat pump unit instantaneously for recharging the hot water within the time period when at least one of, the volume of hot water and the first outlet temperature have reached the predetermined limit, and the operation cycle is in the on-peak operation cycle

wherein the step of selectively operating the heat pump unit for recharging the hot water is performed when the operation cycle is in the off-peak operation cycle, wherein the cost and the schedule of operation of the power source for recharging the hot water are defined in a look-up table configured in a database communicably coupled to the control unit.

11. The method as claimed in claim 1 , further comprising determining a time period required for recharging the volume of chilled water, the time period determined based on the volume of the chilled water, the second outlet temperature and an operation cycle, the operation cycle being at least an on-peak operation cycle and an off-peak operation cycle, wherein the control unit is configured to:

operate the heat pump instantaneously for recharging the chilled water within the time period, when at least one of the volume of chilled water and the second outlet temperature have reached the predetermined limit, and the operation cycle is in the on-peak operation cycle; and

wherein the step of selectively operating the heat pump unit for recharging the chilled water is performed when the operation cycle is in the off-peak operation cycle, wherein the cost and the schedule of operation of the power source for recharging the chilled water are defined in a look-up table configured in a database communicably coupled to the control unit.

12. The method as claimed in claim 1 , further comprising determining a time schedule for recharging the volume of the hot water, the time schedule determined iteratively, wherein the control unit is configured to:

operate the heat pump instantaneously for recharging the hot water within the time period, when the operating temperature has reached the predetermined limit; and

calculate and execute a schedule of operation of the heat pump based on the cost or emissions or other value of a schedule of operation of a power source for recharging the hot water, by iteratively calculating when to charge and a time period required to charge starting with the closest times and iterating out to longer time periods.

13. The method as claimed in claim 1 , further comprising determining a time schedule for recharging the volume of the chilled water, the time schedule determined iteratively, wherein the control unit is configured to:

operate the heat pump instantaneously for recharging the chilled water within the time period, when the operating temperature has reached the predetermined limit; and

calculate and execute a schedule of operation of the heat pump based on the cost or emissions or other value of a schedule of operation of a power source for recharging the chilled water, by iteratively calculating when to charge and a time period to charge starting with the closest times and iterating out to longer time periods.

Assignments (3)
SECURITY INTEREST Recorded Oct 15, 2025
From: HARVEST THERMAL, INC.
To: EARTH FOUNDRY II, LP, AS COLLATERAL AGENT
Reel/Frame 072581/0425 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 22, 2022
From: MELIA, ELISABETH JANE
To: HARVEST THERMAL, INC.
Reel/Frame 059681/0409 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2019
From: DELFORGE, PIERRE-EMMANUEL
To: HARVEST THERMAL, INC.
Reel/Frame 050091/0844 →