IP Library › Granted Patent US 11,265,239
Granted Patent B1
US 11,265,239 · App. 16/566,769 · Granted Mar 1, 2022

Extended network node provisioning in software defined access fabric networks

Inventors: Shashank Vinchurkar (San Jose, CA); Sanjay K. Hooda (Pleasanton, CA); Chiragkumar P. Desai (San Jose, CA)
Assignee: Cisco Technology, Inc.
H04L45/22H04L45/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,265,239
App. No.
16/566,769
Granted
Mar 1, 2022
Kind
B1
Abstract

Techniques for extended network configuration conversion and reconfiguration are described. A network controller proceeds through a set of extended network nodes in an extended network and reconfigures ports in at the various nodes from a first configuration to a second configuration while preventing network traffic looping and maintaining data and management traffic connection to the nodes during the reconfiguration.

Claims (55)

1. A method comprising:

closing a first traffic path in a first network configuration for a plurality of extended network nodes by closing a first root port for the first traffic path at a root node for the plurality of extended network nodes, wherein the plurality of extended network nodes use a first alternate traffic path for data traffic transmission, wherein the plurality of extended network nodes use the first alternate traffic path via a second root port at the root node;

configuring a first set of ports in the plurality of extended network nodes to define a second traffic path in a second network configuration for the plurality of extended network nodes by:

reconfiguring a first port from the first network configuration to the second network configuration, wherein the first port is at first extended network node of the plurality of extended network nodes, wherein the first extended network node is first hop proximate to the root node; and

reconfiguring at each next subsequent extended network node of the plurality of extended network nodes a first port from the first network configuration to the second network configuration;

closing the first alternate traffic path to cause the plurality of extended network nodes to use the second traffic path in the second network configuration for the data traffic transmission; and

configuring a second set of ports in the plurality of extended network nodes in the first network configuration into the second network configuration.

2. The method of claim 1 , wherein closing the first alternate traffic path comprises:

closing the second root port at the root node for the first alternate traffic path at the root node for the plurality of extended network nodes; and

opening the first root port for the first traffic path at the root node.

3. The method of claim 2 , wherein configuring the second set of ports in the plurality of extended network nodes in the first network configuration into the second network configuration comprises:

reconfiguring the first root port and the second root port from the first network configuration to the second network configuration;

reconfiguring a second port from the first network configuration to the second network configuration, wherein the second port is at the first extended network node of the plurality of extended network nodes; and

reconfiguring at each next subsequent extended network node of the plurality of extended network nodes a second port from the first network configuration to the second network configuration.

4. The method of claim 3 , further comprising:

opening the second root port at the root node to complete the second network configuration for the plurality of extended network nodes; and

verifying connectivity to the plurality of extended network nodes in the second network configuration.

5. The method of claim 1 , wherein closing the first traffic path and closing the first alternate traffic path during network reconfiguration prevents network traffic looping in the plurality of extended network nodes.

6. A system comprising:

a processor; and

a memory comprising instructions which, when executed on the processor, performs an operation, the operation comprising:

closing a first traffic path in a first network configuration for a plurality of extended network nodes by closing a first root port for the first traffic path at a root node for the plurality of extended network nodes, wherein the plurality of extended network nodes use a first alternate traffic path for data traffic transmission, wherein the plurality of extended network nodes use the first alternate traffic path via a second root port at the root node;

configuring a first set of ports in the plurality of extended network nodes to define a second traffic path in a second network configuration for the plurality of extended network nodes by:

reconfiguring a first port from the first network configuration to the second network configuration, wherein the first port is at first extended network node of the plurality of extended network nodes, wherein the first extended network node is first hop proximate to the root node; and

reconfiguring at each next subsequent extended network node of the plurality of extended network nodes a first port from the first network configuration to the second network configuration;

closing the first alternate traffic path to cause the plurality of extended network nodes to use the second traffic path in the second network configuration for the data traffic transmission; and

configuring a second set of ports in the plurality of extended network nodes in the first network configuration into the second network configuration.

7. The system of claim 6 , wherein closing the first alternate traffic path comprises:

closing the second root port at the root node for the first alternate traffic path at the root node for the plurality of extended network nodes; and

opening the first root port for the first traffic path at the root node.

8. The system of claim 7 , wherein configuring the second set of ports in the plurality of extended network nodes in the first network configuration into the second network configuration comprises:

reconfiguring the first root port and the second root port from the first network configuration to the second network configuration;

reconfiguring a second port from the first network configuration to the second network configuration, wherein the second port is at the first extended network node of the plurality of extended network nodes; and

reconfiguring at each next subsequent extended network node of the plurality of extended network nodes a second port from the first network configuration to the second network configuration.

9. The system of claim 8 , wherein the operation further comprises:

opening the second root port at the root node to complete the second network configuration for the plurality of extended network nodes; and

verifying connectivity to the plurality of extended network nodes in the second network configuration.

10. The system of claim 6 , wherein closing the first traffic path and closing the first alternate traffic path during network reconfiguration prevents network traffic looping in the plurality of extended network nodes.

11. A computer program product comprising a non-transitory computer-readable medium program having program instructions embodied therewith, the program instructions executable by a processor to perform an operation comprising:

closing a first traffic path in a first network configuration for a plurality of extended network nodes by closing a first root port for the first traffic path at a root node for the plurality of extended network nodes, wherein the plurality of extended network nodes use a first alternate traffic path for data traffic transmission, wherein the plurality of extended network nodes use the first alternate traffic path via a second root port at the root node;

configuring a first set of ports in the plurality of extended network nodes to define a second traffic path in a second network configuration for the plurality of extended network nodes by:

reconfiguring a first port from the first network configuration to the second network configuration, wherein the first port is at first extended network node of the plurality of extended network nodes, wherein the first extended network node is first hop proximate to the root node; and

reconfiguring at each next subsequent extended network node of the plurality of extended network nodes a first port from the first network configuration to the second network configuration;

closing the first alternate traffic path to cause the plurality of extended network nodes to use the second traffic path in the second network configuration for the data traffic transmission; and

configuring a second set of ports in the plurality of extended network nodes in the first network configuration into the second network configuration.

12. The computer program product of claim 11 , wherein closing the first alternate traffic path comprises:

closing the second root port at the root node for the first alternate traffic path at the root node for the plurality of extended network nodes; and

opening the first root port for the first traffic path at the root node.

13. The computer program product of claim 12 , wherein configuring the second set of ports in the plurality of extended network nodes in the first network configuration into the second network configuration comprises:

reconfiguring the first root port and the second root port from the first network configuration to the second network configuration;

reconfiguring a second port from the first network configuration to the second network configuration, wherein the second port is at the first extended network node of the plurality of extended network nodes; and

reconfiguring at each next subsequent extended network node of the plurality of extended network nodes a second port from the first network configuration to the second network configuration.

14. The computer program product of claim 13 , wherein the operation further comprises:

opening the second root port at the root node to complete the second network configuration for the plurality of extended network nodes; and

verifying connectivity to the plurality of extended network nodes in the second network configuration.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2019
From: VINCHURKAR, SHASHANK; HOODA, SANJAY K.; DESAI, CHIRAGKUMAR P.
To: CISCO TECHNOLOGY, INC.
Reel/Frame 050332/0434 →
Cited By (1)
US 12,683,860