IP Library Patent Application 16574465
Patent Application
App. No. 16/574,465

SYSTEMS AND METHODS TO MEASURE PRIMARY VOLTAGE USING CAPACITIVE COUPLED TEST POINT AND GROUNDED SENSOR CIRCUIT

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
16/574,465
Abstract

A voltage measuring system is provided that can include a number of features. The system can include a sensing device configured to measure a true primary voltage of a high-voltage conductor. In some examples, the sensing device can be configured to electrically connect to a voltage test point of a loadbreak connector. The sensing device can include a current-to-voltage converter circuit and an integrator circuit to provide an output representative of the true primary voltage of the high-voltage conductor. Methods of using the sensing devices are also provided.

Claims (20)

1 . A sensing device configured to measure a voltage on a power distribution conductor that is connected to a loadbreak connector, comprising:

a housing configured to electrically connect to a voltage test point of the loadbreak connector, wherein the voltage test point includes a predetermined capacitance;

a current-to-voltage converter circuit disposed in the housing and configured to produce an output voltage when the housing is electrically connected to the voltage test point; and

an integrator circuit electrically disposed in the housing and electrically connected to the current-to-voltage converter circuit, the integrator circuit being configured to receive the output voltage from the current-to-voltage converter circuit as an input, the integrator circuit being further configured to produce an integrated output signal that represents a true primary voltage of the power distribution conductor.

2 . The sensing device of claim 1 , wherein the predetermined capacitance comprises approximately 1 picofarad or less.

3 . The sensing device of claim 1 , wherein electrically connecting the housing to the voltage test point grounds the voltage test point.

4 . A method of sensing a voltage of a power distribution conductor, comprising the steps of:

inputting a voltage test point current of the power distribution conductor into a current-to-voltage converter circuit of a sensing device to produce an output voltage representing the voltage test point current;

inputting the output voltage into an integrator circuit of the sensing device to produce an integrated output voltage that represents a true primary voltage of the power distribution conductor; and

outputting the integrated output voltage from the sensing device.

5 . The method of claim 4 , further comprising, prior to the inputting steps, electrically connecting the sensing device to a loadbreak connector of the power distribution conductor.

6 . The method of claim 5 , wherein the voltage test point current comprises a current flowing through a capacitor of a voltage test point of the loadbreak connector.

7 . The method of claim 6 , wherein the capacitor has a capacitance of approximately 1 picofarad or less.

8 . The method of claim 5 , further comprising grounding the voltage test point.

9 . A voltage measurement system, comprising:

a power distribution conductor;

a loadbreak connector electrically connected to the power distribution conductor, the loadbreak connector including a voltage test point that comprises a capacitor; and

a sensing device configured to electrically connect to the voltage test point of the loadbreak connector, the sensing device including:

a current-to-voltage converter circuit configured to produce an output voltage when the sensing device is electrically connected to the voltage test point;

an integrator circuit electrically connected to the current-to-voltage converter circuit, the integrator circuit being configured to receive the output voltage from the current-to-voltage converter circuit as an input, the integrator circuit being further configured to produce an integrated output signal that represents a true primary voltage of the power distribution conductor.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 10, 2020
From: SENTIENT ENERGY, INC.
To: SENTIENT TECHNOLOGY HOLDINGS, LLC.
Reel/Frame 052887/0333 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 9, 2020
From: SENTIENT ENERGY HOLDINGS, LLC
To: SENTIENT ENERGY, INC.
Reel/Frame 052871/0328 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2020
From: SENTIENT ENERGY, INC.
To: SENTIENT ENERGY HOLDINGS, LLC
Reel/Frame 052805/0571 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 15, 2019
From: RUMRILL, RONALD S.
To: SENTIENT ENERGY, INC.
Reel/Frame 050717/0532 →