IP Library › Granted Patent US 11,591,247
Granted Patent B2
US 11,591,247 · App. 16/615,825 · Granted Feb 28, 2023

Combined furnace

Inventors: Herve Charles (Arques, FR); Jean-Marie Bonningues (Arques, FR); Sebastien Donze (Arques, FR); Francois Famchon (Arques, FR); Xavier Ibled (Arques, FR)
Assignee: ARC FRANCE
C03B5/2353C03B3/023C03B5/04F27B9/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,591,247
App. No.
16/615,825
Granted
Feb 28, 2023
Kind
B2
Abstract

Installation including an industrial glass furnace ( 1 ) including a tank ( 2 ) for molten glass ( 3 ), a combustion heating chamber ( 4 ) situated above the tank ( 2 ), and a duct for evacuation of flue gases in communication with said heating chamber ( 4 ), and a stone furnace including a firing zone ( 21 ) for stone to be fired, the flue gas evacuation duct including a flue gas outlet that is connected to the firing zone ( 21 ) of stone to be fired and supplying the firing zone ( 21 ) of stone to be fired with flue gases at high temperature.

Claims (4)

1. An installation including an industrial glass furnace ( 1 ) comprising a tank ( 2 ) for molten glass ( 3 ), a combustion heating chamber ( 4 ) situated above the tank ( 2 ), and a duct for evacuation of flue gases in communication with said heating chamber ( 4 ), and a stone furnace ( 11 ) comprising a firing zone ( 21 ) for stone to be fired, and a cooling zone ( 22 ) situated under the firing zone ( 21 ), wherein ambient air enters at a bottom portion of the stone furnace ( 11 ), passing upwardly through the cooling zone ( 22 ), the duct comprising a flue gas outlet that is connected to the firing zone ( 21 ) of stone to be fired and supplying the firing zone ( 21 ) of stone to be fired with flue gases at a temperature greater than 900° C.

2. The installation as claimed in claim 1 , wherein the flue gases outlet is in a duct ( 10 ) of the flue gases evacuation duct.

3. The installation as claimed in claim 1 wherein the fuel is gas and/or fuel oil, the oxidizer is oxygen and/or air and the daily capacity of the glass furnace is greater than 10 tons of glass per day.

4. The installation as claimed in claim 1 , wherein the firing zone ( 21 ) is tubular, a stone to be fired feeding zone being disposed above and a fired stone extraction zone being disposed below.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 23, 2020
From: CHARLES, HERVE; BONNINGUES, JEAN-MARIE; DONZE, SEBASTIEN; FAMCHON, FRANCOIS; IBLED, XAVIER
To: ARC FRANCE
Reel/Frame 051597/0430 →
Priority Claims (1)
FR 1754579 · May 23, 2017 · national
Continuity (1)
Related Publication 20200140313A1 · May 7, 2020