IP Library Granted Patent US 12,500,443
Granted Patent B2
US 12,500,443 · App. 16/626,501 · Granted Dec 16, 2025

Energy harvester to convert incident radio frequency energy to direct current as well as a corresponding method and sensor comprising the energy harvester

Inventors: André Luís Rodrigues Mansano (Delft, NL); Omar Vince Link (Delft, NL); Simon Van Der Jagt (Delft, NL)
Assignee: Nexperia B.V.
H02J50/001G01R19/16576G01R27/2605H02J50/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,500,443
App. No.
16/626,501
Granted
Dec 16, 2025
Kind
B2
Abstract

An energy harvester (RF) to convert incident radio frequency, RF, energy associated with an RF signal to direct current energy comprises a rectifier ( 5 ) comprising a pre-storage capacitor ( 4 ), wherein said rectifier is arranged to rectify said incoming RF energy ( 3 ), storing the RF energy into the pre-storage capacitor ( 4 ), followed by an energy transfer unit ( 6 ) comprising a storage output capacitor ( 8 ), the value of the storage output capacitor ( 8 ) is higher than the value of the pre-storage capacitor ( 4 ), the energy transfer unit is arranged to transfer said energy from the pre-storage capacitor into the storage output capacitor including a control unit ( 2 ).

Claims (34)

1 . An energy harvester to convert incident radio frequency, RF, energy associated with an RF signal received by an antenna to direct current energy, the energy harvester comprising:

a rectifier coupled to the antenna, the rectifier comprising a pre-storage capacitor, wherein said rectifier is arranged to rectify said incoming incident RF energy thereby storing said RF energy into said pre-storage capacitor;

an energy transfer unit comprising a storage output capacitor storing said energy at a stable voltage reference point as an input for a DC to DC converter connected thereto, wherein a capacitance value of said storage output capacitor is higher than a capacitance value of said prestorage capacitor, and wherein said energy transfer unit is arranged to transfer said energy in said pre-storage capacitor into said storage output capacitor;

a control unit arranged for controlling said energy transfer unit, wherein said control unit is arranged to measure a voltage over said pre-storage capacitor, and wherein said control unit is further arranged to:

activate said energy transfer unit to start transferring said energy in said prestorage capacitor into said storage output capacitor when said measured voltage is above a first voltage threshold, wherein said energy transfer unit is deactivated whenever said voltage over said prestorage capacitor falls below a second voltage threshold, wherein said first voltage threshold is higher than said second voltage threshold and wherein:

said pre-storage capacitor has a capacitance value of between 100 picofarad, pF, and 100 nanofarad, nF;

said storage output capacitor has a capacitance value of between 1 microfarad, pF, and 100 millifarad, mF;

wherein said energy harvester comprises a power management unit, connected to said storage output capacitor, wherein said power management unit is arranged to convert a voltage over said storage output capacitor to an operating DC voltage; and

wherein said RF signal comprises a frequency content in a range from 1.8 GHz to 5 GHz.

2 . The energy harvester in accordance with claim 1 , wherein said control unit is further arranged to measure a voltage over said storage output capacitor, and wherein said control unit is further arranged to:

activate said power management unit to start converting said voltage over said storage output capacitor to said operating DC voltage when said measured voltage over said storage output capacitor is above a predetermined threshold.

3 . The energy harvester according to claim 1 , wherein said control unit is further arranged to:

deactivate said energy transfer unit to stop transferring said energy in said pre-storage capacitor into said storage output capacitor when said measured voltage is below a second voltage threshold;

wherein said first voltage threshold is higher than said second voltage threshold.

4 . The energy harvester according to claim 1 , wherein said energy transfer unit comprises:

a low-power oscillator, connected to said pre-storage capacitor, wherein said low-power oscillator is arranged to provide for an oscillation output signal based on said energy stored in said pre-storage capacitor;

an Alternating Current, AC, to Direct Current, DC, converter connected to said low-power oscillator and to said storage output capacitor, wherein said AC-to-DC converter is arranged for converting said oscillation output signal to a DC output signal, wherein said DC output signal is provided to said storage output capacitor,

wherein said control unit is arranged to activate and deactivate said energy transfer unit by activating and deactivating said low-power oscillator.

5 . The energy harvester according to claim 1 , wherein said power management unit comprises:

a switched-mode boost converter for boosting said voltage over said pre-storage capacitor thereby obtaining a boosted voltage over said storage output capacitor.

6 . The energy harvester according to claim 1 , wherein said energy harvester further comprises a battery or harvested energy for supplying energy to said control unit.

7 . The energy harvester according to claim 1 , wherein said rectifier comprises one or more diodes selected from a group comprising a Schottky diode, a PN junction diode, a diode-connected field effect transistor and a tunnel diode.

8 . The energy harvester according to claim 1 , wherein said control unit comprises an operational amplifier, op-amp, comparator with hysteresis for providing said first voltage threshold and said second voltage threshold.

9 . The energy harvester according to claim 1 , wherein said harvester further comprises:

a bypass switch for bypassing said energy transfer unit;

wherein said control unit is further arranged for determining that said incoming incident energy is non-fluctuating based on said measured voltage over said pre-storage capacitor, and for activating said bypass switch based on said determination.

10 . The energy harvester according to claim 1 , wherein a boost factor of said power management unit is controllable, and wherein said controller is arranged to control said boost factor.

11 . A sensor device comprising:

the energy harvester according to claim 1 ; and a sensor for performing a measurement.

12 . The sensor device according to claim 11 , wherein said energy harvester comprises a power management unit, connected to said storage output capacitor, wherein said power management unit is arranged to convert a voltage over said storage output capacitor to an operating DC voltage, wherein said sensor device further comprises:

a controller arranged for measuring said operating DC voltage, and for initiating said sensor to perform said measurement and for transmitting a performed measurement whenever a measured operating DC voltage exceeds a predetermined operating voltage.

13 . A method of converting incident radio frequency, RF, energy associated with an RF signal received by an antenna to direct current energy using the energy harvester according to claim 1 , said method comprising the steps of:

rectifying, by said rectifier, said incoming incident RF energy thereby storing said RF energy into said pre-storage capacitor; transferring, by said energy transfer unit, said energy in said pre-storage capacitor into said storage output capacitor; controlling, by said control unit, said energy transfer unit, wherein said controlling comprises measuring a voltage over said pre-storage capacitor, and wherein said controlling further comprises:

activating said energy transfer unit to start transferring said energy in said prestorage capacitor into said storage output capacitor when said measured voltage is above a first voltage threshold; deactivating said energy transfer unit to stop transferring said energy in said prestorage capacitor into said storage output capacitor when said measured voltage is below a second voltage threshold; wherein said first voltage threshold is higher than said second voltage threshold.

Assignments (2)
MERGER AND CHANGE OF NAME Recorded Oct 26, 2023
From: NOWI ENERGY B.V.; NEXPERIA B.V.
To: NEXPERIA B.V.
Reel/Frame 065367/0479 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2020
From: RODRIGUES MANSANO, ANDRÉ LUÍS; LINK, OMAR VINCE; VAN DER JAGT, SIMON
To: NOWI ENERGY B.V.
Reel/Frame 051512/0233 →
Priority Claims (1)
NL 2019135 · Jun 28, 2017 · national
Continuity (1)
Related Publication 20200119585A1 · Apr 16, 2020
References Cited (23)
US 7138911B2 · Tyndall · 2006 [cited by examiner]
US 8232761B1 · Thivierge · 2012 [cited by examiner]
US 8432071B2 · Huang · 2013 [cited by examiner]
US 9197143B1 · Townsend et al. · 2015 [cited by applicant]
US 9559605B2 · Gudan · 2017 [cited by examiner]
US 10333399B2 · Ueno · 2019 [cited by examiner]
US 20050184761A1 · Isomura · 2005 [cited by examiner]
US 20050285728A1 · Tyndall · 2005 [cited by examiner]
US 20060006850A1 · Inoue · 2006 [cited by examiner]
US 20090278520A1 · Perreault · 2009 [cited by examiner]
US 20100079034A1 · Ramadass · 2010 [cited by examiner]
US 20110115605A1 · Dimig et al. · 2011 [cited by applicant]
US 20110175461A1 · Tinaphong · 2011 [cited by examiner]
US 20150256082A1 · Gudan et al. · 2015 [cited by applicant]
US 20150326142A1 · Petras et al. · 2015 [cited by applicant]
US 20160126909A1 · Vashishtha · 2016 [cited by examiner]
US 20170117818A1 · Shao · 2017 [cited by applicant]
US 20190115458A1 · Chin · 2019 [cited by examiner]
US 20190158072A1 · Tornila Oliver · 2019 [cited by examiner]
US 20190334510A1 · Mattia · 2019 [cited by examiner]
US 20210152023A1 · Pearson · 2021 [cited by examiner]
International Search Report for International Application No. PCT/NL2018/050412 filed on Jun. 27, 2018 on behalf of Nowi Energy B.V. Mail Date: Sep. 19, 2018. 5 pages. [cited by applicant]
Written Opinion for International Application No. PCT/NL2018/050412 filed on Jun. 27, 2018 on behalf of Nowi Energy B.V. Mail Date: Sep. 19, 2018. 7 pages. [cited by applicant]