Dosage control in the manufacture of tires
In the field of tire production, the invention relates to methods and systems for creating unvulcanized rubber batches prior to mixing them in a rubber mixer, including selecting at least one batch for mixing in the mixer, wherein each batch corresponds to a selection of rubber bales (A I , B I , C I ) each corresponding to a rubber nature (A, B, C) having predefined characteristics, in order to obtain a proportion corresponding to a predetermined proportion, a target weight to attain a difference between (a) the required weight of the batch and (b) the sum of the weight of the bales (A I , B I , C I ) and the weight of the pieces (A IJ , B IJ , C IJ ).
1. A method for creating batches of unvulcanized rubber before mixture in a rubber mixer, including selecting at least one batch for mixing in the rubber mixer, wherein each batch corresponds to a selection of uncured rubber bales (A I , B I , C I ) that correspond to natures (A, B, C) of rubber composition having predetermined characteristics, comprising the steps of:
providing a supply station where the uncured rubber bales (A I , B I , C I ) are supplied from the corresponding natures (A, B, C);
selecting uncured rubber bales (A I , B I , C I ) from natures (A, B, C) and in a predetermined proportion corresponding to a selected batch at the supply station;
providing a cutting station for cutting at least one uncured rubber bale (A I , B I , C I ) into pieces (A IJ , B IJ , C IJ );
providing a transport system that feeds the cutting station and transfers the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ) to the rubber mixer;
weighing the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ) to obtain a sum of a weight of the uncured rubber bales (A I , B I , C I ) and a weight of the pieces (A IJ , B IJ , C IJ );
comparing the sum obtained with a required weight of the selected batch, which is created by mixing different kinds and different grades of elastomers; and
obtaining, in a proportion corresponding to the predetermined proportion, a target weight to attain a difference between the sum obtained and the required weight of the selected batch,
wherein the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ) are transported between the supply station, the cutting station and the rubber mixer according to a sequence determined by the equivalence between the required weight of the selected batch and (a) the weight of the uncured rubber bales (A I , B I , C I ) or (b) a sum of the weight of the uncured rubber bales (A I , B I , C I ) and a weight of the pieces (A IJ , B IJ , C IJ ), and
wherein the step of obtaining a target weight further comprises the following steps:
providing a reference rubber bale (R) of a nature (A, B, C) and a predetermined proportion that corresponds to a batch at the bale supply station, the reference rubber bale (R) having a predefined weight and a predefined length (L) between one end (R L ) and an opposite end (R L′ ); and
determining a cutting length (L C ) and a cutting position (P) of a learning cut of the reference rubber bale (R) that are required to obtain the required weight of the selected batch.
2. The method of claim 1 , wherein the step of determining the cutting length (L C ) and the cutting position (P) comprises the following steps:
adjusting a position of the reference rubber bale (R) until the opposite end (R L′ ) is brought into contact against a side of a blade (Q) that performs the step of cutting the reference rubber bale (R) at the cutting position (P);
weighing the reference rubber bale (R);
calculating the cutting length (L C ) and the cutting position (P) of the learning cut using a weight of the reference rubber bale (R), which is either the predefined weight or the weight obtained by weighing the reference rubber bale (R);
cutting the reference rubber bale (R) at the cutting position (P) of the learning cut; and
weighing a first piece (R 1 ) that is obtained by cutting the reference rubber bale (R) at the cutting position (P) to obtain a real weight of the first piece (R 1 ).
3. The method of claim 2 , wherein the step of adjusting the position of the reference rubber bale (R) is performed by a linear actuator that contacts the end (R L ).
4. The method of claim 2 , further comprising the steps of:
calculating a cutting length (L C′ ) and a cutting position (P+1) of a successive cut using the weight and a length (L R1 ) obtained from the first piece (R 1 ) and a target weight of a complementary piece (R 2 );
cutting the reference rubber bale (R) at the cutting position (P+1) of the successive cut; and
weighing the complementary piece (R 2 ) that is obtained by cutting the reference rubber bale (R) at the cutting position (P+1) of the successive cut to obtain a real weight of the complementary piece (R 2 ).
5. The method of claim 4 , further comprising the steps of:
calculating a cutting length (L C″ ) and a cutting position (P+2) of a final cut using the weight and a length (L R2 ) obtained from the complementary piece (R 2 ) and a target weight of a final piece (R 3 );
cutting the reference rubber bale (R) at the cutting position (P+2); and
weighing the final piece (R 3 ) that is obtained by cutting the reference rubber bale (R) at the cutting position (P+2) to obtain a real weight of the final piece (R 3 ) remaining after the complementary cut.
6. The method according to claim 5 , wherein the step of determining a cutting length and a cutting position is performed iteratively until a sum obtained of the weight of the uncured rubber bales (A I , B I , C I ), the weight of the pieces (A IJ , B IJ , C IJ ) and a weight of the pieces (R 1 , R 2 , R 3 , R N ) obtained from the reference rubber bale is equal to the required weight of the selected batch in a proportion corresponding to the predetermined proportion.
7. The method of claim 1 , further comprising the steps of:
providing a weighing station for weighing the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ); and
providing a storage station for holding the pieces (A IJ , B IJ , C IJ ) between successive cycles of batch creation.
8. The method of claim 1 , wherein the transport system comprises:
a feed belt for feeding the cutting station; and
conveyor belts carrying the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ) in order to feed the rubber mixer for batch creation, wherein the conveyor belts comprise at least one scale.
9. The method of claim 8 , further comprising the step of weighing the pieces (A IJ , B IJ , C IJ ) in order to obtain the sum of the weight of the uncured rubber bales (A I , B I , C I ) and the weight of the pieces (A IJ , B IJ , C IJ ).
10. The method of claim 1 , further comprising the step of storing the pieces (A IJ , B IJ , C IJ ) for the next cycle of batch creation, wherein a cumulative weight of the stored pieces is compared to a required weight of a next batch.
11. The method of claim 1 , further comprising programming sequences for the transport system such that a predetermined sequence can be selected from a plurality of sequences.
12. The method of claim 1 , further comprising mixing the selected batch in the rubber mixer.
13. A system for creating unvulcanized rubber batches prior to mixing them in a rubber mixer, including a selection of at least one batch for mixing in the rubber mixer, wherein each batch corresponds to a selection of uncured rubber bales (A I , B I , C I ), that correspond to natures of rubber composition (A, B, C) having predetermined characteristics, the system comprising:
a bale supply station where uncured rubber bales (A I , B I , C I ) are provided from the corresponding natures;
a cutting station that cuts at least one bale (A I , B I , C I ) into pieces (A IJ , B IJ , C IJ );
a weighing station for weighing the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ) removed therefrom;
a transport system that transfers the uncured rubber bales (A I , B I , C I ) and the rubber pieces (A IJ , B IJ , C IJ ) to the rubber mixer and transports the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ) between the supply station, the cutting station and the rubber mixer according to a sequence determined by attaining an equivalence between a sum of a bale weight of the uncured rubber bales (A I , B I , C I ) and a weight of the pieces (A IJ , B IJ , C IJ ) and a required weight of the batch in a proportion corresponding to a predetermined proportion; and
at least one linear actuator that adjusts a position of a reference rubber bale (R) of a predetermined rubber nature and proportion that corresponds to a selected batch at the bale supply station, the provided reference rubber bale (R) having a predefined weight and a predefined length (L) between one end (R L ) and an opposite end (R L′ ), until the opposite end (R L′ ) is brought into contact against a side of a blade (Q) that performs a step of cutting the reference rubber bale (R) at the position (P) of a learning cut.
14. The system of claim 13 , wherein the blade (Q) is provided at the cutting station to perform a step of determining cutting lengths (L C , L C′ , L C″ ) and cutting positions (P, P+1, P+2) of the reference rubber bale (R) to attain a difference between the sum of the weight of the uncured rubber bales (A I , B I , C I ) and the weight of the pieces (A IJ , B IJ , C IJ ) and the required weight of the batch.
15. The system of claim 14 , wherein the system performs the step of determining cutting lengths and cutting positions iteratively until a sum of the weight of the uncured rubber bales (A I , B I , C I ), the weight of the pieces (A IJ , B IJ , C IJ ) and a weight of the pieces (R 1 , R 2 , R 3 , R N ) obtained from the reference rubber bale (R) is equal to the required weight of the batch in a proportion corresponding to the predetermined proportion.
16. The system of claim 13 , wherein the transport system comprises:
a feed belt for feeding the cutting station; and
conveyor belts carrying the uncured rubber bales (A I , B I , C I ) and the pieces (A IJ , B IJ , C IJ ) to the rubber mixer for batch creation, wherein the conveyor belts comprise at least one scale.
17. The system of claim 13 , further comprising the rubber mixer for mixing the batch.