IP Library › Granted Patent US 11,695,856
Granted Patent B2
US 11,695,856 · App. 16/634,838 · Granted Jul 4, 2023

Scheduling solution configuration method and apparatus, computer readable storage medium thereof, and computer device

Inventors: Lijia Fu (Guiyang, CN); Hui Miao (Guiyang, CN)
Assignee: GUIZHOU BAISHANCLOUD TECHNOLOGY CO., LTD.
H04L67/61G06F9/4881G06F9/5038H04L41/0677H04L41/082H04L41/0813H04L41/0823G06F11/142G06F11/143
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,695,856
App. No.
16/634,838
Granted
Jul 4, 2023
Kind
B2
Abstract

A scheduling scheme configuration method includes performing state verification on a plurality of operation dimensions involved in generating a scheduling scheme, and, in response to one or more of the operation dimensions being abnormal, removing the one or more abnormal operation dimensions to generate a new scheduling scheme.

Claims (64)

1. A method for configuring a scheduling scheme of access resources, comprising:

performing state verification on a plurality of operation dimensions involved in generating a scheduling scheme, including:

verifying a timeliness of basic data of each of the operation dimensions, and determining, in response to the timeliness of the basic data of one of the operation dimensions exceeding a corresponding failure threshold, the one of the operation dimensions to be abnormal; and

verifying whether an output scheduling scheme from each of the operation dimensions after operation is abnormal, including, for each of the operation dimensions:

comparing the output scheduling scheme of the operation dimension with an input scheduling scheme of the operation dimension; and

in response to a change of the output scheduling scheme relative to the input scheduling scheme exceeding an abnormality threshold, determining that the operation dimension is abnormal; and

in response to one or more of the operation dimensions being abnormal, removing one or more abnormal operation dimensions to generate a new scheduling scheme:

wherein the basic data involved in each of the operation dimensions is derived from an operation and maintenance configuration, a database of a monitoring system, a big data platform, a configuration management system, or a big data system.

2. The method for configuring the scheduling scheme of access resources according to claim 1 , further comprising:

configuring a plurality of operation modes having different operation dimension configurations, the plurality of operation modes including a standard operation mode including all of available operation dimensions and one or more degraded operation modes each including some but not all of the available operation dimensions.

3. The method for configuring the scheduling scheme of access resources according to claim 2 , wherein removing the one or more abnormal operation dimensions to generate the new scheduling scheme includes removing the one or more abnormal operation dimensions from the standard operation mode to obtain a new operation mode.

4. The method for configuring the scheduling scheme of access resources according to claim 2 , wherein removing the one or more abnormal operation dimensions to generate the new scheduling scheme includes selecting one of the one or more degraded operation modes that does not include the one or more abnormal operation dimensions for calculating the new scheduling scheme.

5. The method for configuring the scheduling scheme of access resources according to claim 4 , wherein:

the one or more degraded operation modes include a plurality of degraded operation modes having different weight values; and

selecting the one of the one or more degraded operation modes that does not include the one or more abnormal operation dimensions for calculating the new scheduling scheme includes:

determining, from the plurality of degraded operation modes, one or more candidate degraded operation modes that do not include the one or more abnormal operation dimensions; and

selecting one of the one or more candidate degraded operation modes that has a highest weight value among the one or more candidate degraded operation modes for calculating the new scheduling scheme.

6. The method for configuring the scheduling scheme of access resources according to claim 2 , wherein, for each of the operation modes:

the operation dimensions in the operation mode are sorted in a certain order;

an initial scheduling scheme is used as an input of the operation dimension at a first place in the certain order, an output of an immediately preceding operation dimension in the certain order is used as an input of a current operation dimension, and an output of the current operation dimension is used as an input of an immediately succeeding operation dimension in the certain order; and

a data format of an input scheduling scheme of one of the operation dimensions is consistent with a data format of an output scheduling scheme of the one of the operation dimensions.

7. The method for configuring the scheduling scheme of access resources according to claim 6 , wherein, after an abnormal operation dimension is determined, the input scheduling scheme of the abnormal operation dimension is directly transparently transmitted to an immediately succeeding operation dimension in the certain order, as the input scheduling scheme of the immediately succeeding operation dimension.

8. The method for configuring the scheduling scheme of access resources according to claim 6 , further comprising, when a currently used operation mode is one of the one or more degraded operation modes:

performing state verification on each operation dimension in the standard operation mode; and

switching back to the standard operation mode in response to determining that each operation dimension in the standard operation mode is normal.

9. An apparatus for configuring a scheduling scheme of access resources, comprising:

a memory storing a computer program; and

a processor configured to execute the computer program to:

perform state verification on a plurality of operation dimensions involved in generating a scheduling scheme, including:

verifying a timeliness of basic data of each of the operation dimensions, and determining, in response to the timeliness of the basic data of one of the operation dimension exceeding a corresponding failure threshold, one of the operation dimension to be abnormal; and

verifying whether an output scheduling scheme from each of the operation dimensions is abnormal by:

comparing the output scheduling scheme of the operation dimension with an input scheduling scheme of the operation dimension; and

in response to a change of the output scheduling scheme relative to the input scheduling scheme exceeding an abnormality threshold, determining that the operation dimension is abnormal; and

in response to one or more of the operation dimensions being abnormal, remove one or more abnormal operation dimensions to generate a new scheduling scheme:

wherein the basic data involved in each of the operation dimensions is derived from an operation and maintenance configuration, a database of a monitoring system, a big data platform, a configuration management system, or a big data system.

10. The apparatus for configuring the scheduling scheme of access resources according to claim 9 , wherein the processor is further configured to execute the computer program to configure a plurality of operation modes having different operation dimension configurations, the plurality of operation modes including a standard operation mode including all of available operation dimensions and one or more degraded operation modes each including some but not all of the available operation dimensions.

11. The apparatus for configuring the scheduling scheme of access resources according to claim 10 , wherein the processor is further configured to execute the computer program to:

remove the one or more abnormal operation dimensions from the standard operation mode to obtain a new operation mode; or

select one of the one or more degraded operation modes that does not include the one or more abnormal operation dimensions for calculating the new scheduling scheme.

12. The apparatus for configuring the scheduling scheme of access resources according to claim 11 , wherein:

the one or more degraded operation modes include a plurality of degraded operation modes having different weight values; and

the processor is further configured to execute the computer program to:

determine, from the plurality of degraded operation modes, one or more candidate degraded operation modes that do not include the one or more abnormal operation dimensions; and

select one of the one or more candidate degraded operation modes that has a highest weight value among the one or more candidate degraded operation modes for calculating the new scheduling scheme.

13. The apparatus for configuring the scheduling scheme of access resources according to claim 10 , wherein, for each of the operation modes:

the operation dimensions in the operation mode are sorted in a certain order;

an initial scheduling scheme is used as an input of the operation dimension at a first place in the certain order, an output of an immediately preceding operation dimension in the certain order is used as an input of a current operation dimension, and an output of the current operation dimension is used as an input of an immediately succeeding operation dimension in the certain order; and

a data format of an input scheduling scheme of one of the operation dimensions is consistent with a data format of an output scheduling scheme of the one of the operation dimensions.

14. The apparatus for configuring the scheduling scheme of access resources according to claim 10 , wherein, for each of the operation modes:

the operation dimensions in the operation mode are sorted in a certain order;

an initial scheduling scheme is used as an input of the operation dimension at a first place in the certain order, an output of an immediately preceding operation dimension in the certain order is used as an input of a current operation dimension, and an output of the current operation dimension is used as an input of an immediately succeeding operation dimension in the certain order; and

a data format of an input scheduling scheme of one of the operation dimensions is consistent with a data format of an output scheduling scheme of the one of the operation dimensions.

15. The apparatus for configuring the scheduling scheme of access resources according to claim 14 , wherein the processor is further configured to execute the computer program to, after an abnormal operation dimension is determined, directly transparently transmit the input scheduling scheme of the abnormal operation dimension to an immediately succeeding operation dimension in the certain order, as the input scheduling scheme of the immediately succeeding operation dimension.

16. The apparatus for configuring the scheduling scheme of access resources according to claim 14 , wherein the processor is further configured to execute the computer program to, when a currently used operation mode is one of the one or more degraded operation modes:

perform state verification on each operation dimension in the standard operation mode; and

switch back to the standard operation mode in response to determining that each operation dimension in the standard operation mode is normal.

17. A non-transitory computer readable storage medium storing computer programs for configuring a scheduling scheme of access resources, the computer programs, when executed by a processor, cause the processor to:

perform state verification on a plurality of operation dimensions involved in generating a scheduling scheme, including:

verifying a timeliness of basic data of each of the operation dimensions, and determining, in response to the timeliness of the basic data of one of the operation dimension exceeding a corresponding failure threshold, the one of the operation dimension to be abnormal; and

verifying whether an output scheduling scheme from each of the operation dimensions after operation is abnormal, including, for each of the operation dimensions:

comparing the output scheduling scheme of the operation dimension with an input scheduling scheme of the operation dimension; and

in response to a change of the output scheduling scheme relative to the input scheduling scheme exceeding an abnormality threshold, determining that the operation dimension is abnormal; and

in response to one or more of the operation dimensions being abnormal, remove one or more abnormal operation dimensions to generate a new scheduling scheme;

wherein the basic data involved in each of the operation dimensions is derived from an operation and maintenance configuration, a database of a monitoring system, a big data platform, a configuration management system, or a big data system.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 16, 2026
From: GUIZHOU BAISHANCLOUD TECHNOLOGY CO., LTD.
To: LINGCHUANFENG (GUIZHOU) INFORMATION TECHNOLOGY CO., LTD.
Reel/Frame 075295/0611 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 28, 2020
From: FU, LIJIA; MIAO, HUI
To: GUIZHOU BAISHANCLOUD TECHNOLOGY CO., LTD.
Reel/Frame 051647/0492 →
Priority Claims (1)
CN 201710631021.7 · Jul 28, 2017 · national
Continuity (1)
Related Publication 20210120097A1 · Apr 22, 2021