IP Library Granted Patent US 11,174,841
Granted Patent B2
US 11,174,841 · App. 16/641,974 · Granted Nov 16, 2021

Method for increasing the yield of a wind farm under icing conditions

Inventor: Peter Stähler (Planegg, DE)
Assignee: FOS4X GMBH
F03D7/048F03D7/0264F03D17/00F03D80/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,174,841
App. No.
16/641,974
Granted
Nov 16, 2021
Kind
B2
Abstract

The invention relates to a method for monitoring a wind farm. The method includes determining a first ice mass on a first wind turbine of the wind farm; determining at least one second ice mass on at least one second wind turbine of the wind farm; comparing a first ice mass with a second ice mass and determining a primary wind turbine, which serves as a reference, and at least one secondary wind turbine from the group of the first wind turbine and the at least one second wind turbine; switching off the at least one secondary wind turbine on the basis of a first ice mass from the primary wind turbine; and switching on the at least one secondary wind turbine on the basis of a second ice mass from the primary wind turbine.

Claims (16)

1. A method for monitoring a wind farm, comprising:

determining a first ice mass on a first wind turbine of the wind farm;

determining at least one second ice mass on at least one second wind turbine of the wind farm;

comparing a first increase of the first ice mass with a second increase of the second ice mass for determining a primary wind turbine, which serves as a reference, and at least one secondary wind turbine from the group of the first wind turbine and the at least one second wind turbine;

switching off the at least one secondary wind turbine on the basis of a measurement of the primary wind turbine; and

switching on the at least one secondary wind turbine on the basis of a measurement of the primary wind turbine.

2. The method for monitoring a wind farm according to claim 1 , wherein, for determining the primary wind turbine, the primary wind turbine exhibits a bigger increase of the determined first or second ice mass or a bigger determined first or second ice mass than the at least one secondary wind turbine.

3. The method for monitoring a wind farm according to claim 1 , wherein a first ice alarm is triggered at the primary wind turbine.

4. The method for monitoring a wind farm according to claim 3 , wherein the first ice alarm of the primary wind turbine causes a signal for the at least one secondary wind turbine to be switched off.

5. The method for monitoring a wind farm according to claim 4 , wherein a second ice alarm is triggered which causes the turbine to be switched off where the second ice alarm is being triggered.

6. The method for monitoring a wind farm according to claim 1 , wherein the ice mass of the primary wind turbine is measured over the entire duration of icing on the primary wind turbine.

7. The method for monitoring a wind farm according to claim 1 , wherein the switching on of the at least one secondary wind turbine is performed as soon as an ice mass of the primary wind turbine reaches a plateau or an increase of the ice mass of the primary wind turbine becomes negative.

8. The method for monitoring a wind farm according to claim 7 , wherein the method is restarted when a further icing event occurs, wherein the reference turbine of the previous icing event is included if the reference turbine is regenerated.

9. The method for monitoring a wind farm according to claim 1 , wherein at least one sensor selected from the group consisting of electrical sensors and fiber-optic sensors are used for measuring the first ice mass and at least the second ice mass.

10. A device for monitoring a wind farm, comprising:

a controller for controlling wind turbines of the wind farm, the controller being adapted to execute the steps according to the method of claim 1 .

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE TYPOGRAPHICAL ERROR IN STRRET ADDRESS OF ASSIGNEE-SHOULD BE "INDUSTRIVEJ" NOT "INDUSTRIEVEJ" PREVIOUSLY RECORDED AT REEL: 064897 FRAME: 0939. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 5, 2023
From: FOS4X GMBH
To: VC VIII POLYTECH HOLDING APS
Reel/Frame 065578/0741 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 14, 2023
From: FOS4X GMBH
To: VC VIII POLYTECH HOLDING APS
Reel/Frame 064897/0939 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 4, 2020
From: STAHLER, PETER
To: FOS4X GMBH
Reel/Frame 052015/0218 →
Priority Claims (1)
DE 10 2017 119 540.8 · Aug 25, 2017 · national
Continuity (1)
Related Publication 20200217300A1 · Jul 9, 2020