IP Library › Granted Patent US 12,000,018
Granted Patent B2
US 12,000,018 · App. 16/648,826 · Granted Jun 4, 2024

Method for separating copper from nickel and cobalt

Inventors: Tatsuya Higaki (Niihama, JP); Hiroshi Takenouchi (Niihama, JP); Hiroshi Kobayashi (Niihama, JP); Satoshi Asano (Niihama, JP)
Assignee: SUMITOMO METAL MINING CO., LTD.
C22B7/007C01G3/12C22B3/08C22B3/44C22B15/0071C22B23/043H01M10/0525H01M10/54
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,000,018
App. No.
16/648,826
Granted
Jun 4, 2024
Kind
B2
Abstract

Provided is a method for separating copper from nickel and cobalt with which it is possible to selectively and efficiently separate copper, as well as nickel and cobalt, from an alloy including copper, nickel, and cobalt such as an alloy having high corrosion resistance that includes copper, nickel, and cobalt obtained by dry treatment of waste lithium ion cells. An alloy including copper, nickel, and cobalt is brought into contact with sulfuric acid in the joint presence of a sulfurizing agent, and a solid containing copper and a leachate containing nickel and cobalt are obtained.

Claims (19)

1. A method for separating copper from nickel and cobalt, the method comprising:

producing an alloy containing copper metal, nickel metal, and cobalt metal in the form of an alloy powder;

adding a sulfurization agent to the alloy powder to establish a joint presence of the sulfurization agent and the alloy powder;

wherein the sulfurization agent is one or more selected from the group consisting of elemental sulfur, hydrogen sulfide gas, sodium hydrogen sulfide and sodium sulfide; and

bringing the alloy powder into contact with sulfuric acid in the joint presence, whereby the nickel metal and the cobalt metal are leached from the alloy powder and the copper metal contained in the alloy powder is sulfurized by the sulfurization agent to obtain a solid containing copper sulfide and a leachate containing the nickel existing as an ion and the cobalt existing as an ion.

2. The method for separating copper from nickel and cobalt according to claim 1 ,

wherein the alloy containing copper metal, nickel metal, and cobalt metal obtained by heating and melting, and reducing a waste lithium ion cell.

3. The method for separating copper from nickel and cobalt according to claim 1 ,

wherein the alloy power has a particle diameter of less than or equal to 300 μm.

4. The method for separating copper from nickel and cobalt according to claim 1 ,

wherein the solid containing the copper sulfide and the leachate containing the nickel existing as an ion and the cobalt existing as an ion are separated, and then, copper remaining in the leachate containing nickel and cobalt is removed.

5. The method for separating copper from nickel and cobalt according to claim 2 ,

wherein the alloy power has a particle diameter of less than or equal to 300 μm.

6. The method for separating copper from nickel and cobalt according to claim 2 ,

wherein the solid containing the copper sulfide and the leachate containing the nickel existing as an ion and the cobalt existing as an ion are separated, and then, copper remaining in the leachate containing nickel and cobalt is removed.

7. The method for separating copper from nickel and cobalt according to claim 3 ,

wherein the solid containing the copper sulfide and the leachate containing the nickel existing as an ion and the cobalt existing as an ion are separated, and then, copper remaining in the leachate containing nickel and cobalt is removed.

8. The method for separating copper from nickel and cobalt according to claim 4 ,

wherein copper remaining in the leachate containing nickel and cobalt is removed by one or more types of methods selected from sulfurizing, electrowinning, and neutralizing and precipitating.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 19, 2020
From: HIGAKI, TATSUYA; TAKENOUCHI, HIROSHI; KOBAYASHI, HIROSHI; ASANO, SATOSHI
To: SUMITOMO METAL MINING CO., LTD.
Reel/Frame 052167/0562 →
Priority Claims (1)
JP 2017-204696 · Oct 23, 2017 · national
Continuity (1)
Related Publication 20200216327A1 · Jul 9, 2020
Cited By (3)
US 12,522,514 US 12,534,776 US 12,637,361