IP Library › Granted Patent US 11,050,517
Granted Patent B2
US 11,050,517 · App. 16/661,932 · Granted Jun 29, 2021

Transmission of control channel and data channels for coverage enhancements

Inventors: Ying Li (Richardson, TX); Aris Papasakellariou (Houston, TX)
Assignee: Samsung Electronics Co., Ltd.
H04L1/1812H04L1/0072H04L1/08H04L1/189H04L1/1858H04W52/0212H04L1/1845Y02D30/70
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,050,517
App. No.
16/661,932
Granted
Jun 29, 2021
Kind
B2
Abstract

Methods and apparatus are provided for a base station to transmit and for a User Equipment (UE) to receive repetitions of an enhanced physical downlink control channel (EPDCCH). Time and frequency resources for EPDCCH repetitions are defined together with restrictions in time resources to provide UE power savings. Time and frequency resources are also defined for repetitions of a physical downlink shared channel (PDSCH) transmission and for repetitions of a physical uplink shared channel (PUSCH) transmission. Methods and apparatus are also provided for the UE to transmit and for the base station to receive acknowledgement information in repetitions of a physical uplink shared channel (PUCCH).

Claims (73)

1. A method, comprising:

receiving a configuration for an offset of n s0 sub-frames;

receiving a configuration for a periodicity of P sub-frames;

determining sub-frames for receiving physical downlink control channels (PDCCHs); and

receiving the PDCCHs in a sub-frame with a number n s satisfying (Z·N subframe frame +n s −n s0 ) mod P=0,

wherein N subframe frame is a number of sub-frames per frame and Z is a frame number.

2. The method of claim 1 , further comprising:

receiving a configuration for a duration of T sub-frames, wherein T is smaller than or equal to P; and

wherein determining the sub-frames for receiving the PDCCHs comprises determining a first consecutive number of the T sub-frames of the P sub-frames for receiving the PDCCHs.

3. The method of claim 1 , further comprising receiving a configuration for a downlink control information (DCI) format provided by the PDCCHs.

4. The method of claim 1 , further comprising:

receiving a configuration for an offset of a physical downlink shared channel (PDSCH) reception sub-frame relative to a PDCCH reception sub-frame;

receiving a downlink control information (DCI) format in a PDCCH from the PDCCHs that schedules reception of a PDSCH;

determining a sub-frame for reception of the PDSCH by adding the offset of the PDSCH reception sub-frame to the PDCCH reception sub-frame; and

receiving the PDSCH in the determined sub-frame.

5. The method of claim 1 , further comprising:

receiving a configuration for a bit-map corresponding to a number of sub-frames; and

determining a sub-frame from the number of sub-frames for receiving the PDCCHs when a corresponding value for the bit-map equals one.

6. The method of claim 1 , further comprising:

receiving a configuration for a first set of resource blocks (RBs) and for a second set of RBs; and

determining the first set of RBs in a first sub-frame and the second set of RBs in a second sub-frame for receiving the PDCCHs.

7. The method of claim 1 , further comprising:

receiving a configuration for a number of PDCCH candidates per control channel element (CCE) aggregation level from a predetermined number of CCE aggregation levels, wherein a PDCCH is received over a CCE aggregation level; and

determining CCEs for receiving the PDCCHs according to the number of PDCCH candidates per CCE aggregation level.

8. A user equipment (UE), comprising:

a receiver configured to:

receive a configuration for an offset of n s0 sub-frames; and

receive a configuration for a periodicity of P sub-frames; and

a controller configured to determine sub-frames for receiving physical downlink control channels (PDCCHs),

wherein the receiver is further configured to receive the PDCCHs in a sub-frame with a number n s satisfying (Z·N subframe frame +n s0 −n s0 ) mod P=0, and

wherein N subframe frame is a number of sub-frames per frame and Z is a frame number.

9. The UE of claim 8 , wherein:

the receiver is further configured to receive a configuration for a duration of T sub-frames, wherein T is smaller than or equal to P; and

the controller is further configured to instruct the receiver to receive the PDCCHs in a first consecutive number of the T sub-frames of the P sub-frames for receiving the PDCCHs.

10. The UE of claim 8 , wherein the receiver is further configured to receive a configuration for a downlink control information (DCI) format provided by the PDCCHs.

11. The UE of claim 8 , wherein:

the receiver is further configured to:

receive a configuration for an offset of a physical downlink shared channel (PDSCH) reception sub-frame relative to a PDCCH reception sub-frame; and

receive a downlink control information (DCI) format in a PDCCH from the PDCCHs that schedules reception of a PDSCH,

the controller is further configured to determine a sub-frame for the receiver to receive the PDSCH by adding the offset of the PDSCH reception sub-frame to the PDCCH reception sub-frame, and

the receiver is further configured to receive the PDSCH in the determined sub-frame.

12. The UE of claim 8 , wherein:

the receiver is further configured to receive a configuration for a bit-map corresponding to a number of sub-frames, and

the controller is further configured to instruct the receiver to receive the PDCCHs in a sub-frame from the number of sub-frames when a corresponding value for the bit-map equals one.

13. The UE of claim 8 , wherein:

the receiver is further configured to receive a configuration for a first set of resource blocks (RBs) and for a second set of RBs, and

the controller is further configured to instruct the receiver to receive PDCCHs in the first set of RBs in a first sub-frame and in the second set of RBs in a second sub-frame.

14. The UE of claim 8 , wherein:

the receiver is further configured to receive a configuration for a number of PDCCH candidates per control channel element (CCE) aggregation level from a predetermined number of CCE aggregation levels, wherein a PDCCH is received over a CCE aggregation level; and

the controller is further configured to instruct the receiver to receive the PDCCHs in CCEs determined according to the number of PDCCH candidates per CCE aggregation level.

15. A base station, comprising:

a transmitter configured to:

transmit a configuration for an offset of n s0 sub-frames; and

transmit a configuration for a periodicity of P sub-frames; and

a controller configured to determine sub-frames for transmission of physical downlink control channels (PDCCHs),

wherein the transmitter is configured to transmit the PDCCHs in a sub-frame with a number n s satisfying (Z·N subframe frame +n s n s0 ) mod P=0, and

wherein N subframe frame is a number of sub-frames per frame and Z is a frame number.

16. The base station of claim 15 , wherein:

the transmitter is further configured to transmit a configuration for a duration of T sub-frames, wherein T is smaller than or equal to P; and

the controller is further configured to instruct the transmitter to transmit the PDCCHs in a first consecutive number of the T sub-frames of the P sub-frames for receiving the PDCCHs.

17. The base station of claim 15 , wherein the transmitter is further configured to transmit a configuration for a downlink control information (DCI) format provided by the PDCCHs.

18. The base station of claim 15 , wherein:

the transmitter is further configured to:

transmit a configuration for an offset of a physical downlink shared channel (PDSCH) transmission sub-frame relative to a PDCCH transmission sub-frame; and

transmit a downlink control information (DCI) format in a PDCCH from the PDCCHs that schedules transmission of a PDSCH,

the controller is further configured to determine a sub-frame for the transmitter to transmit the PDSCH by adding the offset of the PDSCH transmission sub-frame to the PDCCH transmission sub-frame, and

the transmitter is further configured to transmit the PDSCH in the determined sub-frame.

19. The base station of claim 15 , wherein:

the transmitter is further configured to transmit a configuration for a bit-map corresponding to a number of sub-frames, and

the controller is further configured to instruct the transmitter to transmit the PDCCHs in a sub-frame from the number of sub-frames when a corresponding value for the bit-map equals one.

20. The base station of claim 15 , wherein:

the transmitter is further configured to transmit a configuration for a first set of resource blocks (RBs) and for a second set of RBs, and

the controller is further configured to instruct the transmitter to transmit PDCCHs in the first set of RBs in a first sub-frame and in the second set of RBs in a second sub-frame.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 23, 2019
From: LI, YING; PAPASAKELLARIOU, ARIS
To: SAMSUNG ELECTRONICS CO., LTD
Reel/Frame 050808/0184 →
Continuity (5)
Continuation 15606886 · May 26, 2017
Continuation 14538535 · Nov 11, 2014
Provisional Application 61916663 · Dec 16, 2013
Provisional Application 61903777 · Nov 13, 2013
Related Publication 20200059328A1 · Feb 20, 2020