IP Library › Granted Patent US 11,178,589
Granted Patent B2
US 11,178,589 · App. 16/769,166 · Granted Nov 16, 2021

Method and user equipment for performing attach request procedure

Inventors: Sangmin Park (Seoul, KR); Laeyoung Kim (Seoul, KR); Taehun Kim (Seoul, KR); Jaehyun Kim (Seoul, KR); Jinsook Ryu (Seoul, KR); Myungjune Youn (Seoul, KR)
Assignee: LG Electronics Inc.
H04W36/22H04W8/08H04W28/0289H04W60/04H04W88/06H04W92/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,178,589
App. No.
16/769,166
Granted
Nov 16, 2021
Kind
B2
Abstract

One disclosure of the present specification provides a method in which a user equipment (UE) performs an attach request procedure. The method comprises a step of transmitting an attach request message to a second system when an intersystem change from a first system to the second system is required in a state where a back-off timer associated with a data network name (DNN) based congestion control is running. The attach request message may include information on a packet data unit (PDU) session used by the UE in the first system. The information on the PDU session may be used so as not for the attach request message to be rejected by a second network, even if the back-off timer associated with the DNN-based congestion control is running.

Claims (34)

1. A method for performing an attach request procedure, the method performed by a user equipment (UE) and comprising:

transmitting an attach request message to a second system when an intersystem change from a first system to the second system is required in a state where a back-off timer associated with a data network name (DNN) based congestion control is running,

wherein the attach request message includes information on a packet data unit (PDU) session used by the UE in the first system, and

the information on the PDU session is used so as not for the attach request message to be rejected by a second network, even if the back-off timer associated with the DNN-based congestion control is running.

2. The method of claim 1 , further comprising:

overriding the back-off timer which is running when the intersystem change from the first system to the second system is required.

3. The method of claim 1 , wherein the information on the PDU session includes identification information for one or more PDU sessions used in the first system.

4. The method of claim 1 , wherein the information on the PDU session is included in an information element field in the attach request message.

5. The method of claim 1 , wherein the information on the PDU session is included in a protocol configuration option (PCO) in a session management (SM) container in the attach request message.

6. The method of claim 1 , wherein the first network is a 5 th generation system (5GS) and the second network is an evolved packet system (EPS).

7. A method for performing an attach request procedure, the method performed by a mobility management entity (MME) and comprising:

receiving an attach request message from user equipment (UE) which requires an intersystem change from a first system to a second system in a state where a back-off timer associated with a data network name (DNN) based congestion control is running;

overriding the back-off timer which is running when the attach request message includes information on a packet data unit (PDU) session which the UE uses in the first system; and

transmitting, to the UE, an accept message for the attach request message.

8. The method of claim 7 , further comprising:

performing a procedure for packet data network (PDN) connection creation for the corresponding PDU session based on the information on the PDU session.

9. The method of claim 7 , wherein the information on the PDU session includes identification information for one or more PDU sessions used in the first system.

10. The method of claim 7 , wherein the information on the PDU session is included in an information element field in the attach request message.

11. The method of claim 7 , wherein the information on the PDU session is included in a protocol configuration option (PCO) in a session management (SM) container in the attach request message.

12. The method of claim 7 , wherein the first network is a 5th generation system (5GS) and the second network is an evolved packet system (EPS).

13. A user equipment (UE) for performing an attach request procedure, the UE comprising:

a transceiver; and

a processor including the transceiver,

wherein the processor performs

a process of transmitting an attach request message to a second system when an intersystem change from a first system to the second system is required in a state where a back-off timer associated with a data network name (DNN) based congestion control is running,

wherein the attach request message includes information on a packet data unit (PDU) session used by the UE in the first system, and

wherein the information on the PDU session is used so as not for the attach request message to be rejected by a second network, even if the back-off timer associated with the DNN-based congestion control is running.

14. A mobility management entity (MME) for performing an attach request procedure, the MME comprising:

a transceiver; and

a processor controlling the transceiver,

wherein the processor performs

receiving an attach request message from user equipment (UE) which requires an intersystem change from a first system to a second system in a state where a back-off timer associated with a data network name (DNN) based congestion control is running,

overriding the back-off timer which is running when the attach request message includes information on a packet data unit (PDU) session which the UE uses in the first system, and

transmitting, to the UE, an accept message for the attach request message.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 15, 2020
From: PARK, SANGMIN; KIM, LAEYOUNG; KIM, TAEHUN; KIM, JAEHYUN; RYU, JINSOOK; YOUN, MYUNGJUNE
To: LG ELECTRONICS INC.
Reel/Frame 053219/0380 →
Priority Claims (2)
KR 10-2018-0073231 · Jun 26, 2018 · national
KR 10-2018-0094263 · Aug 13, 2018 · national
Continuity (2)
Provisional Application 62613038 · Jan 2, 2018
Related Publication 20200389830A1 · Dec 10, 2020
Cited By (1)
US 12,301,637