IP Library Granted Patent US 11,096,084
Granted Patent B2
US 11,096,084 · App. 16/850,475 · Granted Aug 17, 2021

Efficient uplink scheduling mechanisms for dual connectivity

Inventors: Prateek Basu Mallick (Langen, DE); Joachim Loehr (Wiesbaden, DE); Hidetoshi Suzuki (Kanagawa, JP)
Assignee: Sun Patent Trust
H04W28/0278H04W16/32H04W28/085H04W72/0413H04W80/02H04W80/06H04W84/045
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,096,084
App. No.
16/850,475
Granted
Aug 17, 2021
Kind
B2
Abstract

The present disclosure mainly relates to improvements for the buffer status reporting and the logical channel prioritization procedures performed in the UE, in scenarios where the UE is in dual connectivity and the PDCP layer of the UE is shared in the uplink for MeNB and SeNB. According to the present disclosure, a ratio is introduced according to which the buffer values for the PDCP are split in the UE between the SeNB and the MeNB according to said ratio.

Claims (24)

1. A master base station comprising:

circuitry, which, in operation, controls a connection to a user equipment, which connects to the master base station and to a secondary base station via a split bearer that is split between the master base station and the secondary base station in a Packet Data Convergence Protocol (PDCP) layer; wherein

responsive to a total buffer occupancy of the PDCP layer in the user equipment exceeding a threshold, the total buffer occupancy of the PDCP layer is split into a first PDCP buffer occupancy value for the master base station and a second PDCP buffer occupancy value for the secondary base station; and

responsive to the total buffer occupancy not exceeding the threshold, one of the first and second PDCP buffer occupancy values is set to the total buffer occupancy, and the other one of the first and second PDCP buffer occupancy values is set to zero; and

a receiver, which is coupled to the circuitry and which, in operation, receives a first buffer status report based on the first PDCP buffer occupancy value from the user equipment responsive to the first PDCP buffer occupancy value being more than zero.

2. The master base station according to claim 1 , comprising a transmitter, which is coupled to the circuitry and which, in operation, transmits a Radio Resource Control (RRC) message which configures a split ratio for the user equipment.

3. The master base station according to claim 2 , wherein the receiver, in operation, receives uplink data from the user equipment depending on the split ratio, with an exception of RLC uplink data being transmitted to and received by both the master base station and the secondary base station.

4. The master base station according to claim 2 , wherein the split ratio is 1:0 or 0:1.

5. The master base station according to claim 2 , wherein the transmitter, in operation, transmits the threshold by a Radio Resource Control (RRC) message.

6. The master base station according to claim 1 , wherein the receiver, in operation, receives the first buffer status report, which is transmitted from the user equipment independently of a transmission of a second buffer status report from the user equipment to the secondary base station.

7. A method performed by a master base station, the method comprising:

connecting to a user equipment, which connects to the master base station and to a secondary base station via a split bearer that is split between the master base station and the secondary base station in a Packet Data Convergence Protocol (PDCP) layer; wherein

responsive to a total buffer occupancy of the PDCP layer in the user equipment exceeding a threshold, the total buffer occupancy of the PDCP layer is split into a first PDCP buffer occupancy value for the master base station and a second PDCP buffer occupancy value for the secondary base station; and

responsive to the total buffer occupancy not exceeding the threshold, one of the first and second PDCP buffer occupancy values is set to the total buffer occupancy, and the other one of the first and second PDCP buffer occupancy values is set to zero; and

receiving a first buffer status report based on the first PDCP buffer occupancy value from the user equipment responsive to the first PDCP buffer occupancy value being more than zero.

8. The method according to claim 7 , comprising:

transmitting a Radio Resource Control (RRC) message which configures a split ratio for the user equipment.

9. The method according to claim 8 , comprising:

receiving uplink data from the user equipment depending on the split ratio, with an exception of RLC uplink data being transmitted to and received by both the master base station and the secondary base station.

10. The method according to claim 8 , wherein the split ratio is 1:0 or 0:1.

11. The method according to claim 8 , comprising:

transmitting the threshold by a Radio Resource Control (RRC) message.

12. The method according to claim 7 , comprising:

receiving the first buffer status report, which is transmitted from the user equipment independently of a transmission of a second buffer status report from the user equipment to the secondary base station.

Priority Claims (2)
EP 13004707 · Sep 27, 2013 · regional
EP 13198976 · Dec 20, 2013 · regional
Continuity (4)
Continuation 16440029 · Jun 13, 2019
Continuation 15851631 · Dec 21, 2017
Continuation 15024751
Related Publication 20200260319A1 · Aug 13, 2020
Cited By (1)
US 12,328,605