IP Library › Granted Patent US 11,453,946
Granted Patent B2
US 11,453,946 · App. 16/886,186 · Granted Sep 27, 2022

Gas-phase reactor system including a gas detector

Inventors: SungBae Kim (Cheonan-si, KR); HakYong Kwon (Hwaseong-si, KR); YoungMin Kim (Hwaseong-si, KR); KiKang Kim (Yongin-si, KR); SeungHwan Lee (Anseong-si, KR)
Assignee: ASM IP Holding B.V.
C23C16/52C23C16/4401C23C16/4412C23C16/45561H01L21/67242H01L21/67253G01M3/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,453,946
App. No.
16/886,186
Granted
Sep 27, 2022
Kind
B2
Abstract

Methods of and systems for performing leak checks of gas-phase reactor systems are disclosed. Exemplary systems include a first exhaust system coupled to a reaction chamber via a first exhaust line, a bypass line coupled to a gas supply unit and to the first exhaust system, a gas detector coupled to the bypass line via a connecting line, a connecting line valve coupled to the connecting line, and a second exhaust system coupled to the connecting line. Methods include using the second exhaust system to exhaust the connecting line to thereby remove residual gas in the connecting line that may otherwise affect the accuracy of the gas detector.

Claims (25)

1. A gas-phase reactor system comprising:

a reactor comprising a reaction chamber;

a gas supply unit coupled to the reaction chamber via a gas supply line;

a first exhaust system coupled to the reaction chamber via a first exhaust line;

a bypass line coupled to the gas supply unit and to the first exhaust system;

a gas detector coupled to the bypass line via a connecting line;

a connecting line valve coupled to the connecting line; and

a second exhaust system coupled to the connecting line.

2. The gas-phase reactor system of claim 1 , wherein the bypass line is coupled to the gas supply line.

3. The gas-phase reactor system of claim 1 , wherein the bypass line is coupled to the first exhaust line.

4. The gas-phase reactor system of claim 1 , further comprising a second exhaust line coupled to the connecting line.

5. The gas-phase reactor system of claim 4 , further comprising a second exhaust line valve between the connecting line and the second exhaust system.

6. The gas-phase reactor system of claim 1 , wherein the second exhaust system is coupled to a chamber.

7. The gas-phase reactor system of claim 1 , further comprising a first bypass line valve between the gas supply unit and the first exhaust system.

8. The gas-phase reactor system of claim 7 , further comprising a second bypass line valve between the gas supply unit and the first exhaust system.

9. The gas-phase reactor system of claim 1 , wherein the gas detector can detect a flow rate of a gas.

10. The gas-phase reactor system of claim 1 , wherein the gas detector can detect a composition of a gas.

11. The gas-phase reactor system of claim 1 , further comprising a controller configured to: cause the gas-phase reactor system to perform a leak test after a substrate has been loaded into the reaction chamber and before the substrate is removed from the reaction chamber.

12. The gas-phase reactor system of claim 1 , further comprising a controller configured to: cause the gas-phase reactor system to perform a leak test while heating a substrate to a desired process temperature.

13. The gas-phase reactor system of claim 1 , further comprising a controller configured to: perform a leak test during a process cycle.

14. The gas-phase reactor system of claim 1 , further comprising a controller configured to: stop flow of gas to the reaction chamber when the gas detector detects a flow rate of gas above a predetermined value.

15. The gas-phase reactor system of claim 1 , further comprising a controller configured to: stop operation of the gas-phase reactor system when the gas detector detects a flow rate of gas above a predetermined value.

16. The gas-phase reactor system of claim 1 , further comprising a controller configured to: exhaust the connecting line during a substrate process within the reaction chamber.

17. The gas-phase reactor system of claim 1 , further comprising a controller configured to: exhaust the connecting line by closing the connecting line valve and opening a second exhaust line valve.

18. The gas-phase reactor system of claim 1 , further comprising a controller configured to: exhaust gas to the first exhaust system and the second exhaust system during a leak check of the gas supply unit.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2020
From: KIM, SUNGBAE; KWON, HAKYONG; KIM, YOUNGMIN; KIM, KIKANG; LEE, SEUNGHWAN
To: ASM IP HOLDING B.V.
Reel/Frame 052830/0601 →
Continuity (2)
Provisional Application 62858224 · Jun 6, 2019
Related Publication 20200385867A1 · Dec 10, 2020