IP Library › Granted Patent US 11,579,329
Granted Patent B2
US 11,579,329 · App. 16/894,064 · Granted Feb 14, 2023

Estimating wear for BHA components using borehole hardness

Inventors: Ian David Campbell Mitchell (The Woodlands, TX); Crystal M. Saadeh (Pearland, TX)
Assignee: Halliburton Energy Services, Inc.
G01V5/12E21B12/02E21B49/005G01N23/20G01N23/205G01N23/207G01N23/2055G01N23/2076G01N23/20091G01N23/22G01N23/223G01N33/24G01V5/04G01N2223/056G01N2223/0566G01N2223/076G01N2223/616
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,579,329
App. No.
16/894,064
Granted
Feb 14, 2023
Kind
B2
Abstract

Estimating wear on bottom hole assembly (BHA) components utilizes a rock hardness index using analysis of drill cutting. Estimating the amount of wear on borehole assembly components comprises measuring the rock properties in drilled cuttings from a borehole. A hardness value is assigned to each mineral present in the drilled cuttings. A hardness index is calculated for a drilled borehole interval. A wear resistance factor is assigned to each BHA component of the BHA. The wear resistance factor depends on the wear resistance of each BHA component. A wear value for each BHA component is calculated based on the hardness index for the drilled borehole interval, the wear resistance of the BHA component, and drilling parameters.

Claims (51)

1. A method comprising:

determining a mineral composition of a borehole interval of a borehole from at least one of drilled cuttings and borehole data;

determining a hardness value for each mineral identified in the determined mineral composition of the borehole interval; and

calculating a hardness value for the borehole interval, wherein the hardness value for the borehole interval is based on a proportion of each mineral identified in the determined mineral composition of the borehole interval.

2. The method of claim 1 , further comprising:

determining a mineral composition of each of two or more borehole intervals from at least one of drilled cuttings and borehole data for each of the two or more borehole intervals;

determining a hardness value for each mineral identified in the determined mineral composition for each of the two or more borehole intervals, wherein like minerals between the two or more borehole intervals have a same hardness value; and

calculating a hardness value for each of the two or more borehole intervals, wherein the hardness value for each of the two or more borehole intervals is based on a proportion of each mineral identified in the determined mineral composition for each of the two or more borehole intervals.

3. The method of claim 2 , further comprising:

calculating a hardness value for the borehole based on the hardness value for each of the two or more borehole intervals, wherein the hardness value for the borehole is a sum of hardness values of the two or more borehole intervals.

4. The method of claim 1 , wherein determining the hardness value for each mineral identified in the determined mineral composition of the borehole interval comprises assigning a relative hardness value to each mineral identified in the determined mineral composition based on a comparative hardness of each mineral identified in the determined composition.

5. The method of claim 1 , wherein calculating the hardness value for the borehole interval comprises:

identifying a percent composition of each mineral identified in the determined mineral composition;

multiplying the percent composition of each mineral identified in the determined mineral composition by the hardness value for each mineral identified in the determined mineral composition to obtain a relative hardness composition value for each mineral identified in the determined mineral composition; and

summing the relative hardness composition value for each mineral identified in the determined mineral composition to calculate the hardness value for the borehole interval.

6. The method of claim 1 , wherein determining the mineral composition of the borehole interval comprises measuring rock properties of each mineral identified in the determined mineral composition by X-ray diffraction (XRD) on the drilled cuttings.

7. The method of claim 1 , wherein the borehole interval indicates a length of the borehole or a drilling time in the borehole.

8. The method of claim 1 , wherein the borehole interval is determined based on an expected wear value for components of a bottom hole assembly used to drill the borehole.

9. A system comprising:

a processor; and

a machine-readable medium having program code executable by the processor to cause the system to:

determine a mineral composition of a borehole interval of a borehole from at least one of drilled cuttings and borehole data,

determine a hardness value for each mineral identified in the determined mineral composition of the borehole interval, and

calculate a hardness value for the borehole interval, wherein the hardness value for the borehole interval is based on a proportion of each mineral identified in the determined mineral composition of the borehole interval.

10. The system of claim 9 , wherein the machine-readable medium having program code executable by the processor to cause the system to:

determine a mineral composition of each of two or more borehole intervals from at least one of drilled cuttings and borehole data for each of the two or more borehole intervals;

determine a hardness value for each mineral identified in the determined mineral composition for each of the two or more borehole intervals, wherein like minerals between the two or more borehole intervals have a same hardness value; and

calculate a hardness value for each of the two or more borehole intervals, wherein the hardness value for each of the two or more borehole intervals is based on a proportion of each mineral identified in the determined mineral composition for each of the two or more borehole intervals.

11. The system of claim 10 , wherein the program code is further executable by the processor to cause the system to calculate a hardness value for the borehole based on the hardness value for each of the two or more borehole intervals.

12. The system of claim 9 , wherein the program code executable by the processor to determine the hardness value for each mineral identified in the determined mineral composition of the borehole interval further comprises program code executable by the processor to cause the system to assign a relative hardness value to each mineral based on a comparative hardness of each mineral identified in the determined composition.

13. The system of claim 12 , wherein the program code executable by the processor to assign the relative hardness value to each mineral based on the comparative hardness of each mineral identified in the determined composition is configured to further cause the processor to:

assign a value of 1 to a softest identified mineral;

assign a value of 9 to a hardest identified mineral; and

assign a value between 1 and 9 to each remaining identified mineral based on the comparative hardness of each mineral identified in the determined composition.

14. The system of claim 9 , wherein the program code executable by the processor to calculate the hardness value for the borehole interval is configured to further cause the system to:

identify a percent composition of each mineral identified in the determined mineral composition;

multiply the percent composition of each mineral identified in the determined mineral composition by the hardness value for each mineral identified in the determined mineral composition to obtain a relative hardness composition value for each mineral identified in the determined mineral composition; and

calculate the hardness value for the borehole interval by adding together each relative hardness composition value.

15. The system of claim 9 , wherein the borehole interval indicates a length of the borehole, a predetermined drilling time in the borehole, or the borehole interval is determined based on an expected wear value for components of a bottom hole assembly.

16. A method comprising:

determining a hardness value for each mineral identified from at least one of drilled cuttings and borehole data;

calculating a hardness index for a drilled borehole interval based, at least in part, on the hardness value of each mineral identified; and

calculating a wear value for each component of a plurality of components of a bottom hole assembly (BHA) based on the hardness index for the drilled borehole interval, a wear resistance value of each component of the plurality of components of the BHA, and a drilling parameter.

17. The method of claim 16 , further comprising:

indicating the calculated wear value for each component of a BHA design.

18. The method of claim 16 , further comprising:

estimating when the BHA should be pulled out of a borehole based on the calculated wear value for each component of the plurality of components of the BHA.

19. The method of claim 16 , further comprising:

identifying each mineral present in the drilled cuttings in the borehole data.

20. The method of claim 16 , further comprising:

measuring rock properties of each mineral identified by X-ray diffraction (XRD) on the drilled cuttings.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 29, 2021
From: MITCHELL, IAN DAVID CAMPBELL; SAADEH, CRYSTAL M.
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 055085/0842 →
Continuity (2)
Provisional Application 62858282 · Jun 6, 2019
Related Publication 20200386905A1 · Dec 10, 2020