IP Library Granted Patent US 11,401,460
Granted Patent B2
US 11,401,460 · App. 16/923,000 · Granted Aug 2, 2022

Methods for pressure protection using a gas

Inventors: Samiha Said Elsayed Morsy (Houston, TX); Nabijan Nizamidin (Houston, TX); Mohsen S. Tagavifar (Houston, TX)
Assignee: Chevron U.S.A. Inc.
C09K8/94C09K8/584C09K8/588C09K8/594C09K8/602C09K8/665C09K8/74E21B33/138E21B43/162E21B43/166E21B43/17E21B43/255E21B43/26E21B43/267E21B2200/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,401,460
App. No.
16/923,000
Granted
Aug 2, 2022
Kind
B2
Abstract

Disclosed are compositions and methods for the pressure protection of existing wells during infill drilling operations. The methods can include injecting a gas into the existing wellbore in fluid communication with an unconventional subterranean formation prior to and/or during fracturing of the new wellbore in fluid communication with the unconventional subterranean formation.

Claims (51)

1. A method for pressure protection of an existing wellbore that has previously been fractured in proximity to a new wellbore to be fractured, the method comprising:

injecting a gas into the existing wellbore in fluid communication with an unconventional subterranean formation prior to, during, or prior to and during fracturing of the new wellbore in fluid communication with the unconventional subterranean formation;

wherein the existing wellbore has an existing reservoir pressure that is less than original reservoir pressure;

wherein the gas is injected at a pressure and flowrate effective to increase the existing wellbore pressure without refracturing the existing wellbore; and

wherein the gas in the existing wellbore biases fracture formation away from the previously fractured rock matrix in proximity to the existing wellbore and towards virgin rock proximate to the new wellbore.

2. The method of claim 1 , wherein the existing wellbore was under production for at least three months prior to injection of the gas,

optionally wherein at least 10,000 barrels of hydrocarbon were produced from the existing wellbore prior to injection of the gas.

3. The method of claim 1 , wherein the existing wellbore pressure is from 20% to 70% of the original reservoir pressure.

4. The method of claim 1 , wherein injecting the gas comprises injecting the gas at a pressure and flowrate effective to increase the existing wellbore pressure by at least 30%, to increase the existing wellbore pressure to from greater than the original reservoir pressure to 150% of the original reservoir pressure, to increase the existing wellbore pressure to within 15% of original reservoir fracture pressure, or any combination thereof.

5. The method of claim 1 , wherein the method further comprises injecting a fracturing fluid into the unconventional subterranean formation via the new wellbore at a sufficient pressure to create or extend at least one fracture in a rock matrix of the unconventional subterranean formation in a region proximate to the new wellbore.

6. The method of claim 5 , wherein the method further comprises producing a hydrocarbon from the existing wellbore during, after, or during and after the injection of the fracturing fluid into the unconventional subterranean formation via the new wellbore.

7. The method of claim 1 , wherein injection of the gas into the existing wellbore results in increased hydrocarbon recovery from the existing wellbore as compared to an expected level of hydrocarbon recovery projected from a decline curve fit to production history of the existing wellbore.

8. The method of claim 1 , wherein the injection of the gas in the existing wellbore impacts a direction, a geometry, or any combination thereof of the at least one fracture created or extended in a rock matrix during injection of the fracturing fluid into the unconventional subterranean formation via the new wellbore.

9. The method of claim 1 , wherein the injection of the gas in the existing wellbore reduces entry of fluid, debris, or any combination thereof into the existing wellbore during injection of the fracturing fluid into the unconventional subterranean formation via the new wellbore.

10. The method of claim 1 , wherein injection of the gas in the existing wellbore increases a relative permeability in a region proximate to the existing wellbore,

optionally wherein injection of the gas in the existing wellbore releases hydrocarbons from pores in a rock matrix in the region proximate to the existing wellbore.

11. The method of claim 1 , wherein the method further comprises modeling the existing wellbore to determine a volume of the gas for injection into the unconventional subterranean formation via the existing wellbore.

12. The method of claim 1 , wherein the method further results in increased hydrocarbon recovery from the existing wellbore, the new wellbore, or any combination thereof.

13. The method of claim 1 , wherein the gas comprises air, helium, carbon dioxide, nitrogen, natural gas or a hydrocarbon component thereof, or any combination thereof.

14. A method for pressure protection of an existing wellbore that has previously been fractured in proximity to a new wellbore to be fractured, the method comprising:

injecting a pressure protection composition comprising a hydrocarbon solvent into the existing wellbore in fluid communication with an unconventional subterranean formation prior to, during, prior to and during fracturing of the new wellbore in fluid communication with the unconventional subterranean formation;

wherein the existing wellbore has an existing reservoir pressure that is less than an original reservoir pressure; and

wherein the pressure protection composition is injected at a pressure and flowrate effective to increase the existing wellbore pressure without refracturing the existing wellbore.

15. The method of claim 14 , wherein the existing wellbore was under production for at least three months prior to injection of the pressure protection composition,

optionally wherein at least 10,000 barrels of hydrocarbon were produced from the existing wellbore prior to injection of the pressure protection composition.

16. The method of claim 14 , wherein the existing wellbore pressure is from 20% to 70% of the original reservoir pressure.

17. The method of claim 14 , wherein injecting the pressure protection composition comprises injecting the pressure protection composition at a pressure and flowrate effective to increase the existing wellbore pressure by at least 30%, to increase the existing wellbore pressure to from greater than the original reservoir pressure to 150% of the original reservoir pressure, to increase the existing wellbore pressure to within 15% of original reservoir fracture pressure, or any combination thereof.

18. The method of claim 14 , wherein the pressure protection composition is injected at least 1 day before fracturing.

19. The method of claim 14 , wherein the method further comprises injecting a fracturing fluid into the unconventional subterranean formation via the new wellbore at a sufficient pressure to create or extend at least one fracture in a rock matrix of the unconventional subterranean formation in a region proximate to the new wellbore.

20. The method of claim 19 , wherein the method further comprises producing a hydrocarbon from the existing wellbore during, after, or during and after the injection of the fracturing fluid into the unconventional subterranean formation via the new wellbore.

21. The method of claim 14 , wherein injection of the pressure protection composition into the existing wellbore results in increased hydrocarbon recovery from the existing wellbore as compared to an expected level of hydrocarbon recovery projected from a decline curve fit to production history of the existing wellbore.

22. The method of claim 14 , wherein the injection of the pressure protection composition in the existing wellbore impacts a direction, a geometry, or any combination thereof of the at least one fracture created or extended in the rock matrix during injection of the fracturing fluid into the unconventional subterranean formation via the new wellbore.

23. The method of claim 14 , wherein the injection of the pressure protection composition in the existing wellbore reduces entry of fluid, debris, or any combination thereof into the existing wellbore during injection of the fracturing fluid into the unconventional subterranean formation via the new wellbore.

24. The method of claim 14 , wherein injection of the pressure protection composition in the existing wellbore increases a relative permeability in a region proximate to the existing wellbore,

optionally wherein injection of the pressure protection composition in the existing wellbore releases hydrocarbons from pores in the rock matrix in the region proximate to the existing wellbore.

25. The method of claim 14 , wherein the method further comprises modeling the existing wellbore to determine a volume of the pressure protection composition for injection into the unconventional subterranean formation via the existing wellbore.

26. The method of claim 14 , wherein the method further results in increased hydrocarbon recovery from the existing wellbore, the new wellbore, or any combination thereof.

27. The method of claim 14 , wherein the hydrocarbon solvent comprises hexanes, liquid petroleum gas, liquified natural gas, or any combination thereof.

28. The method of claim 14 , wherein the pressure protection composition further comprises a surfactant package, an acid, an alkali agent, a co-solvent, a viscosity-modifying polymer, or any combination thereof.

29. The method of claim 14 , wherein the pressure protection composition further comprises a chelating agent, a clay swelling inhibitor, a biocide, a scale inhibitor, an anti-foam agent, a corrosion inhibitor, or any combination thereof.

30. A method for pressure protection of a first wellbore in proximity to a second wellbore, the method comprising:

injecting a gas or a pressure protection composition comprising a hydrocarbon solvent into the first wellbore in fluid communication with an unconventional subterranean formation prior to, during, or prior to and during fracturing of the second wellbore in fluid communication with the unconventional subterranean formation;

wherein the first wellbore has an existing reservoir pressure that is less than original reservoir pressure;

wherein a rock matrix of the unconventional subterranean formation in proximity to the first wellbore is previously fractured

wherein the gas or the pressure protection composition is injected at a pressure and flowrate effective to increase the first wellbore pressure without fracturing the first wellbore; and

wherein the gas in the first wellbore biases fracture formation away from the previously fractured rock matrix in proximity to the first wellbore and towards virgin rock proximate to the second wellbore.

31. The method of claim 30 , wherein a region of an unconventional subterranean formation in fluid communication with the first wellbore is naturally fractured, has been previously fractured one or more times, or any combination thereof.

32. The method of claim 30 , wherein the fracturing of the second wellbore comprises fracturing a region of an unconventional subterranean formation in fluid communication with the second wellbore or refracturing a region of an unconventional subterranean formation in fluid communication with the second wellbore.

33. A method for pressure protection of an existing wellbore that has previously been fractured in proximity to a new wellbore to be fractured, the method comprising:

injecting a gas into the existing wellbore in fluid communication with an unconventional subterranean formation prior to, during, or prior to and during injection of a fracturing fluid into the new wellbore in fluid communication with the unconventional subterranean formation;

wherein the gas and the fracturing fluid are each injected at a pressure and flowrate effective to produce a higher pressure in the existing wellbore than in the new wellbore.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 8, 2021
From: MORSY, SAMIHA SAID ELSAYED; NIZAMIDIN, NABIJAN; TAGAVIFAR, MOHSEN S.
To: CHEVRON U.S.A. INC.
Reel/Frame 056788/0009 →
Continuity (6)
Provisional Application 62873904 · Jul 13, 2019
Provisional Application 62873902 · Jul 13, 2019
Provisional Application 62873901 · Jul 13, 2019
Provisional Application 62871165 · Jul 7, 2019
Provisional Application 62871164 · Jul 7, 2019
Related Publication 20210002991A1 · Jan 7, 2021