IP Library Granted Patent US 10,982,514
Granted Patent B2
US 10,982,514 · App. 16/945,102 · Granted Apr 20, 2021

Tubing and annular gas lift

Inventors: William Garrett Archa (Decatur, TX); Corbin Mozisek (Richmond, TX)
Assignee: Liberty Lift Solutions, LLC
E21B43/122
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,982,514
App. No.
16/945,102
Granted
Apr 20, 2021
Kind
B2
Abstract

A gas lift system may be installed within a well to allow gas lift operations where gas may be injected into the annular area of the well while producing fluids through the interior of the production tubular or upon demand may be reversed so that gas may be injected into the interior of the production tubular while producing fluids to the annular region of the well. In order to allow bidirectional production on demand two types of gas lift mandrels are installed as part of the production tubular. Both types of gas lift mandrels are configured such that gas lift valves are mounted to the exterior of the mandrels. In order to facilitate the desired direction of gas flow through the two types of gas lift mandrels a plug and packer system with or with out one way valves may be utilized to direct and contain the pressurized gas flow within the well.

Claims (6)

1. A method for producing fluids from a well comprising:

pumping a gas, at a surface, into a region between a production tubular and a casing, injecting the gas into the fluids within the production tubular from the region between the production tubular and the casing,

producing the fluid to the surface through the production tubular,

stopping the production of fluid to the surface through the production tubular pumping the gas, at the surface, into the production tubular,

injecting the gas into the region between the production tubular and the casing from the production tubular, and

producing the fluid to the surface utilizing only the region between the production tubular and the casing without removing the production tubular from the well.

Assignments (2)
SECURITY INTEREST Recorded Jan 11, 2022
From: LIBERTY LIFT SOLUTIONS, LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 058620/0030 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 31, 2020
From: ARCHA, WILLIAM GARRETT; MOZISEK, CORBIN
To: LIBERTY LIFT SOLUTIONS, LLC
Reel/Frame 053372/0597 →
Continuity (3)
Division 16374544 · Apr 3, 2019
Continuation In Part 15916256 · Mar 8, 2018
Related Publication 20200362677A1 · Nov 19, 2020