IP Library Granted Patent US 11,719,462
Granted Patent B2
US 11,719,462 · App. 16/989,731 · Granted Aug 8, 2023

Duct support assembly and method of using a duct support

Inventors: Bret Robert McLeod (Scotts Valley, CA); Sharad Thakorbhai Patel (Irvine, CA)
Assignee: ACSM, Inc.
F24F13/0227E04F17/04F24F13/0254
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,719,462
App. No.
16/989,731
Granted
Aug 8, 2023
Kind
B2
Abstract

Disclosed herein are embodiments of a duct support assembly. The duct support assembly can include a frame structure and a duct support. The duct support can be configured to be installed in a floor assembly between a first beam portion of a first wall frame and a second beam portion of a second wall frame and to provide a duct exit from the frame structure. The duct support can be configured to transfer a tension and/or compression load. Also disclosed herein are embodiments of a method of using a duct support to provide a duct exit from a frame structure. The method can include positioning the duct support in a floor assembly between a first beam portion of a first wall frame and a second beam portion of a second wall frame.

Claims (14)

1. A method of using a duct support to provide a duct exit from a frame structure, the method comprising:

providing a duct support, the duct support comprising a first main brace portion, a second main brace portion, a first spanning portion, a second spanning portion, and an opening defining a passage configured to receive a duct;

positioning a first wall frame of a frame structure, the first wall frame comprising a first beam portion;

positioning a second wall frame of the frame structure, the second wall frame comprising a second beam portion;

positioning a floor assembly of the frame structure;

installing the duct support in the frame structure;

wherein when the duct support is installed in the frame structure, the duct support is positioned in the floor assembly between the first beam portion of the first wall frame and the second beam portion of the second wall frame; and

wherein the duct support is configured such that when the duct support is installed in the frame structure and a load of at least 400 lbs per square inch is applied to the second spanning portion, the duct support transfers the load to the first beam portion.

2. The method of claim 1 , further comprising passing a duct through the passage of the duct support such that the duct extends to an outer wall of a building.

3. The method of claim 1 , wherein installing the duct support in the frame structure comprises positioning the duct support such that an outer surface of the first spanning portion of the duct support faces the first beam portion of the first wall frame and an outer surface of the second spanning portion of the duct support faces the second beam portion of the second wall frame.

4. The method of claim 1 , wherein installing the duct support in the frame structure comprises positioning the duct support laterally between a first joist and a second joist of the floor assembly.

5. The method of claim 1 , wherein installing the duct support in the frame structure comprises positioning the duct support vertically between a first portion of a post and a second portion of the post.

6. The method of claim 5 , further comprising attaching a first end of a holdown assembly to the first portion of the post, attaching a second end of the holdown assembly opposite the first end to the second portion of the post, and extending a rod vertically between the first end of the holdown assembly and the second end of the holdown assembly.

7. The method of claim 1 , further comprising attaching a first portion of a tie rod assembly to a first connector attached to the first spanning portion of the duct support and attaching a second portion of the tie rod assembly to a second connector attached to the second spanning portion of the duct support.

Assignments (2)
SECURITY INTEREST Recorded Feb 3, 2023
From: ACSM, INC.; ADVANCED CONSTRUCTION SOUTHWEST OF CALIFORNIA, INC.
To: UMB BANK N.A.
Reel/Frame 062588/0549 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 27, 2020
From: MCLEOD, BRET ROBERT; PATEL, SHARAD THAKORBHAI
To: ACSM, INC.
Reel/Frame 053615/0719 →
Continuity (2)
Provisional Application 62885506 · Aug 12, 2019
Related Publication 20210048217A1 · Feb 18, 2021