IP Library Granted Patent US 11,396,798
Granted Patent B2
US 11,396,798 · App. 17/002,637 · Granted Jul 26, 2022

Downhole pump and method for producing well fluids

Inventors: Henry Joe Jordan, Jr. (Willis, TX); Ryan Matthew Ward (Tomball, TX); Christian Atilano (Houston, TX)
Assignee: Liquid Rod Lift, LLC
E21B43/126E21B33/124E21B33/1208E21B34/08E21B43/129F04B53/10F04B53/14F04B53/20E21B33/1294E21B2200/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,396,798
App. No.
17/002,637
Granted
Jul 26, 2022
Kind
B2
Abstract

A method of producing fluid from a wellbore includes operating a pump located proximate to a zone of fluid influx in the wellbore to draw a fluid from a reservoir into the wellbore at the zone of fluid influx. A first section of a tubing string is coupled to, and extends above, the pump, and a second section of the tubing string is coupled to, and extends below, the pump. A packer seals a first annular space around the first section of the tubing string. The method further includes operating the pump to move the fluid from the second section of the tubing string and into the first section of the tubing string.

Claims (38)

1. A method of producing fluid from a wellbore comprising:

operating a first pump located proximate to a first zone of fluid influx in the wellbore to draw a first production fluid from a reservoir into the wellbore at the first zone of fluid influx;

operating a second pump located proximate to a second zone of fluid influx in the wellbore to draw a second production fluid from the reservoir into the wellbore at the second zone of fluid influx;

wherein:

the first pump is coupled to a first section of a tubing string extending above the first pump and to a second section of the tubing string extending below the first pump;

a first packer seals a first annular space around the first section of the tubing string;

a second packer seals a second annular space around the second section of the tubing string below the first pump;

the second pump is coupled to the second section of the tubing string below the second packer;

the second pump is coupled to a third section of the tubing string extending below the second pump;

a production pump is coupled to the first section of the tubing string in the wellbore above the first pump; and

a drive fluid conduit extends from the production pump to the first pump and from the first pump to the second pump;

operating the second pump to move the second production fluid from the third section of the tubing string and into the second section of the tubing string;

operating the first pump to move the first production fluid and the second production fluid from the second section of the tubing string and into the first section of the tubing string;

powering the production pump, the first pump, and the second pump by a drive fluid supplied through the drive fluid conduit; and

operating the production pump to produce the first production fluid and the second production fluid from the wellbore.

2. The method of claim 1 , further comprising regulating a flow of the first production fluid between the reservoir and the first pump.

3. The method of claim 2 , wherein regulating the flow of the first production fluid between the reservoir and the first pump is achieved with an inflow control device.

4. The method of claim 1 , further comprising regulating a flow of the second production fluid between the reservoir and the second pump.

5. The method of claim 4 , wherein regulating the flow of the second production fluid between the reservoir and the second pump is achieved with an inflow control device.

6. The method of claim 1 , wherein the first and second pumps are operated simultaneously by the drive fluid.

7. The method of claim 6 , wherein the production pump and the first pump are operated simultaneously by the drive fluid.

8. The method of claim 1 , wherein the first and second pumps are positive displacement pumps.

9. The method of claim 1 , wherein the production pump is a positive displacement pump.

10. The method of claim 1 , wherein the drive fluid conduit is disposed inside the tubing string.

11. A method of producing fluid from a wellbore comprising:

operating a lower pump in the wellbore to draw a lower production fluid from a reservoir into the wellbore at a lower zone of fluid influx;

operating the lower pump to move the lower production fluid toward an upper pump located in the wellbore;

operating the upper pump to produce the lower production fluid from the wellbore;

powering the upper pump by a drive fluid supplied through a drive fluid conduit; and

powering the lower pump by the drive fluid, wherein the drive fluid conduit extends from the upper pump to the lower pump.

12. The method of claim 11 , further comprising:

operating the upper pump to draw an upper production fluid from the reservoir into the wellbore at an upper zone of fluid influx; and

operating the upper pump to produce the upper production fluid from the wellbore.

13. The method of claim 12 , further comprising commingling the upper production fluid with the lower production fluid.

14. The method of claim 12 , further comprising regulating a flow of the upper production fluid between the reservoir and the upper pump.

15. The method of claim 11 , further comprising regulating a flow of the lower production fluid between the reservoir and the lower pump.

16. The method of claim 11 , wherein the upper and lower pumps are operated simultaneously by the drive fluid.

17. The method of claim 11 , wherein the upper and lower pumps are positive displacement pumps.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 11, 2020
From: JORDAN, HENRY JOE, JR.; WARD, RYAN MATTHEW; ATILANO, CHRISTIAN
To: LIQUID ROD LIFT, LLC
Reel/Frame 054339/0866 →
Continuity (3)
Provisional Application 63026548 · May 18, 2020
Provisional Application 62893090 · Aug 28, 2019
Related Publication 20210062626A1 · Mar 4, 2021
Cited By (1)
US 12,378,851