IP Library Granted Patent US 11,762,120
Granted Patent B2
US 11,762,120 · App. 17/020,419 · Granted Sep 19, 2023

Power-efficient transient electromagnetic evaluation system and method

Inventors: Stanislav Forgang (Houston, TX); Babak Kouchmeshky (Houston, TX); Sushant Dutta (Houston, TX); Randy Gold (Houston, TX)
Assignee: Baker Hughes Holdings LLC
G01V3/28E21B49/00G01V3/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,762,120
App. No.
17/020,419
Granted
Sep 19, 2023
Kind
B2
Abstract

A system for performing downhole logging operations includes a conductor coil configured to alternate between producing a magnetic field and measuring a magnetic field induced in a formation, a power supply couplable to the conductor coil for providing an electrical control current to conductor coil, and a signal acquisition system couplable to the conductor coil. The system further includes a permanent magnet coupled to the conductor coil, and a multi-state switch operable in a first state and a second state. In the first state, the conductor coil is coupled to an output of the power supply and decoupled from an input of the signal acquisition system. In the second state, the conductor coil is coupled to the input of acquisition electronics and decoupled from the output of the power supply.

Claims (44)

1. A system for performing downhole logging operations, the system comprising:

a conductor coil configured to alternate between producing a magnetic field and measuring a magnetic field induced in a formation;

a power supply couplable to the conductor coil for providing an electrical control current to conductor coil;

a signal acquisition system couplable to the conductor coil;

a permanent magnet coupled to the conductor coil;

a multi-state switch operable in a first state and a second state,

wherein in the first state, the conductor coil is coupled to an output of the power supply and decoupled from an input of the signal acquisition system; and

wherein in the second state, the conductor coil is coupled to the input of the signal acquisition system and decoupled from the output of the power supply; and

at least one electromagnetic sensor detecting an electromagnetic signal caused by eddy currents in the surrounding environment induced by a transient magnetic field;

wherein the electrical control current supplied to the conductor coil from the power supply during the first state of multi-state switch has an amplitude large enough to generate a magnetic field exceeding the permanent magnet's existing magnetization.

2. The system of claim 1 , further comprising a timer coupled to the multi-state switch, the timer activating the multi-state switch to change the states based on a programmed activation rate or a control signal.

3. The system of claim 1 , wherein a duration of the first state of the multi-state switch and the corresponding control current flowing through the conductive coil is shorter than a duration of the second state during which the control current is absent.

4. The system of claim 1 , wherein the control current supplied to the conductor coil from the power supply during the first state of the multi-state switch causes the permanent magnet to reverse polarity and induces the transient magnetic field in the surrounding environment.

5. The system of claim 1 , wherein the flow of the control current supplied to the conductor coil from the power supply has an opposite direction of flow during each sequential time the multi-state switch is in the first state, thereby sequentially reversing polarity of the permanent magnet.

6. The system of claim 1 , wherein switching the multi-state switch to the second state upon completion of the first state enables the conductor coil to operate as a magnetic field sensor that records induced voltage by the means of the signal acquisition system.

7. The system of claim 1 , wherein the at least one additional electromagnetic sensor comprises at least one of a magnetometer, a second conductive coil, an electrode system, a Hall effect sensor, or a giant magnetic resistivity sensor.

8. The system of claim 1 , further comprising one or more sensors located around the circumference of a pipe under inspection, wherein the pipe is magnetized by the permanent magnet and the one or more sensors detect magnetic flux leakage from the pipe.

9. The system of claim 1 , wherein the permanent magnet has a magnetization strength below the magnetic saturation of a structure in the surrounding environment.

10. The system of claim 1 , wherein the permanent magnet has a magnetization strength exceeding the magnetic saturation of a first structure in a surrounding environment and below the magnetic saturation of a second structure in the surrounding environment.

11. A system for performing downhole logging operations, the system comprising:

a conductor coil;

a permanent magnet having a permanent magnet magnetic field and coupled to the conductor coil;

a power supply selectively couplable to the conductor coil for providing a current to conductor coil;

a signal acquisition system selectively couplable to the conductor coil for receiving a measurement signal from the conductor coil; and

a switching device configured to alternating couple the conductor coil to either the power supply or the signal acquisition system,

wherein when the conductor coil is coupled to the power supply, the power supply provides a current through the conductor coil causing the conductor coil to generate a conductor coil magnetic field, wherein the conductor coil magnetic field is substantially parallel to the permanent magnet magnetic field; and

wherein when the conductor coil is coupled to the signal acquisition system, the conductor coil detects a magnetic field induced in a formation.

12. The system of claim 11 , further comprising a timer coupled to the switching device, the timer controlling the switching device based on a programmed activation rate or a control signal.

13. The system of claim 11 , wherein the conductive coil is coupled to the power supply for a shorter duration than the conductive coil is coupled to the signal acquisition system.

14. The system of claim 11 , wherein the flow current supplied to the conductor coil from the power supply has an opposite direction of flow during each sequential time the conductive coil is coupled to the power supply, thereby sequentially reversing polarity of the permanent magnet.

15. The system of claim 11 , further comprising one or more sensors located around the circumference of a pipe under inspection, wherein the pipe is magnetized by the permanent magnet and the one or more sensors detect magnetic flux leakage from the pipe.

16. A method for evaluating a well comprising:

placing an evaluation tool in a wellbore surrounded by a well formation, the evaluation tool comprising a permanent magnet, a conductor coil, a power supply, and a signal acquisition system;

electrically coupling the conductor coil to the power supply, thereby energizing the conductor coil and reversing the polarity of the permanent magnet and generating a transient magnetic field in the well formation;

electrically decoupling the conductor coil from the power supply;

electrically coupling the conductor coil to the signal acquisition system, the conductor coil sensing an electromagnetic signal caused by eddy currents in the formation induced by the transient magnetic field;

electrically decoupling the conductor coil from the signal acquisition system; and

electrically coupling the conductor coil to the power supply.

17. The method of claim 16 , further comprising:

controlling switching between coupling the conductor coil to the power supply and the signal acquisition system using a timer programmed based on a predetermined switching schedule.

18. The method of claim 16 , wherein the signal acquisition system is coupled to the conductor coil for a longer duration than the power supply is coupled to the conductor coil.

19. The method of claim 16 , further comprising:

placing one or more sensors around the circumference of a structure in the well formation, wherein the structure is magnetized by the permanent magnet; and

detecting magnetic flux leakage from the structure via the one or more sensors.

Assignments (2)
CHANGE OF NAME Recorded Mar 2, 2022
From: BAKER HUGHES, A GE COMPANY, LLC
To: BAKER HUGHES HOLDINGS LLC
Reel/Frame 059594/0254 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 15, 2020
From: FORGANG, STANISLAV; KOUCHMESHKY, BABAK; DUTTA, SUSHANT; GOLD, RANDY
To: BAKER HUGHES, A GE COMPANY, LLC
Reel/Frame 054068/0605 →
Continuity (2)
Continuation In Part 16204626 · Nov 29, 2018
Related Publication 20200408947A1 · Dec 31, 2020