IP Library Granted Patent US 11,945,159
Granted Patent B2
US 11,945,159 · App. 17/072,137 · Granted Apr 2, 2024

Method and apparatus for controlling the exposure of a selective laser sintering or laser melting apparatus

Inventors: Frank Herzog (Lichtenfels, DE); Florian Bechmann (Lichtenfels, DE); Markus Lippert (Lichtenfels, DE); Johanna Hoch (Breitbrunn, DE); Alexey Tarasov (Redwitz an der Rodach, DE); Fabian Zeulner (Lichtenfels, DE)
Assignee: Concept Laser GmbH
B29C64/153B22F10/00B22F10/28B22F10/366B22F12/49B23K26/0604B29C64/277B29C64/393B33Y10/00B33Y30/00B33Y50/02G02B26/10H01S3/101H01S3/102B22F12/90Y02P10/25
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,945,159
App. No.
17/072,137
Granted
Apr 2, 2024
Kind
B2
Abstract

A method of additively manufacturing a three-dimensional object may include allocating irradiation of respective ones of a plurality of sequential layers of construction material between a first region and a second region based at least in part on a first irradiation time and/or a second irradiation time. Irradiation of the first region is allocated to a first scanner and the first irradiation time is indicative of a time required for the first scanner to irradiate the first region with respect to at least one of the plurality of sequential layers of construction material. Irradiation of the second region is allocated to a second scanner and the second irradiation time is indicative of a time required for the second scanner to irradiate the second region with respect to at least one of the plurality of sequential layers of construction material. The first irradiation time and the second irradiation time may be at least approximately the same.

Claims (45)

1. A method of additively manufacturing a three-dimensional object, the method comprising:

allocating irradiation of respective ones of a plurality of sequential layers of construction material between a first region and a second region based at least in part on a first irradiation time and/or a second irradiation time;

wherein irradiation of the first region is allocated to a first scanner and the first irradiation time is indicative of a time required for the first scanner to irradiate the first region with respect to at least one of the plurality of sequential layers of construction material;

wherein irradiation of the second region is allocated to a second scanner and the second irradiation time is indicative of a time required for the second scanner to irradiate the second region with respect to at least one of the plurality of sequential layers of construction material; and

wherein the first irradiation time and the second irradiation time are at least approximately the same.

2. The method of claim 1 , comprising:

allocating irradiation of the respective ones of the plurality of sequential layers of construction material between the first region and the second region based at least in part on a first surface area of the first region and/or a second surface area of the second region such that the first surface area and the second surface area are at least approximately the same size.

3. The method of claim 1 , comprising:

allocating irradiation of one or more subsequent ones of the plurality of sequential layers of construction material between the first region and the second region based at least in part on the first irradiation time and/or the second irradiation time such that the first irradiation time and the second irradiation time are aligned with one another;

wherein the first irradiation time is indicative of a time required for the first scanner to irradiate the first region with respect to one or more preceding ones of the plurality of sequential layers of construction material; and

wherein the second irradiation time is indicative of a time required for the second scanner to irradiate the second region with respect to one or more preceding ones of the plurality of sequential layers of construction material.

4. The method of claim 1 , comprising:

determining the first irradiation time and/or the second irradiation time at least in part using an electronic detection unit.

5. The method of claim 4 , wherein the electronic detection unit comprises a sensor element or an optical switch.

6. The method of claim 4 , comprising:

comparing the first irradiation time with the second irradiation time at least in part using an electronic comparator.

7. The method of claim 4 , comprising

determining a comparison of the first irradiation time with the second irradiation time; and

re-allocating irradiation of one or more subsequent ones of the plurality of the sequential layers of construction material between the first region and the second region based at least in part on the comparison of the first irradiation time with the second irradiation time.

8. The method of claim 7 , wherein for the one or more subsequent ones of the plurality of the sequential layers of construction material, the first irradiation time aligns with the second irradiation time and the first region and the second region have at least approximately the same surface area.

9. The method of claim 1 , wherein the first region is located in an upper scanning field and the second region is located in a lower scanning field, and wherein a border delineates the first region from the second region and/or wherein the border delineates the upper scanning field from the lower scanning field.

10. The method of claim 9 , comprising:

dynamically adjusting the border after irradiating respective ones of the plurality of sequential layers of construction material such that the first irradiation time and the second irradiation time are at least approximately the same for respective ones of the plurality of sequential layers of construction material.

11. The method of claim 1 , comprising:

allocating irradiation of the respective ones of the plurality of sequential layers of construction material between the first region and the second region based at least in part on readable control data from the first scanner and/or the second scanner.

12. The method of claim 11 , comprising:

allocating irradiation of the respective ones of the plurality of sequential layers of construction material between the first region and the second region at least in part by determining a location for a border that delineates the first region from the second region.

13. The method of claim 12 , comprising:

allocating irradiation of the respective ones of the plurality of sequential layers of construction material between the first region and the second region such that a first surface area of the first region and a second surface area of the second region are at least approximately the same size.

14. The method of claim 12 , comprising:

receiving an input from an operator, the input from the operator configured to determine the location of the border.

15. The method of claim 12 , comprising:

adjusting the location of the border in incremental steps corresponding to at least some of the respective ones of the plurality of sequential layers of construction material.

16. The method of claim 15 , wherein the border comprises a straight line.

17. The method of claim 15 , comprising:

oscillating a location of the border corresponding to at least some of the respective ones of the plurality of sequential layers of construction material.

18. The method of claim 1 , comprising:

causing the first scanner and/or the second scanner to perform a pre-exposure.

19. The method of claim 18 , comprising:

causing the first scanner to perform a pre-exposure of at least a portion of the second region, and/or causing the second scanner to perform a pre-exposure of at least a portion of the first region.

20. A non-transitory computer-readable medium comprising computer-executable instructions, which when executed by a processor associated with an additive manufacturing machine, cause the additive manufacturing machine to perform a method of additively manufacturing a three-dimensional object, the method comprising:

allocating irradiation of respective ones of a plurality of sequential layers of construction material between a first region and a second region based at least in part on a first irradiation time and/or a second irradiation time;

wherein irradiation of the first region is allocated to a first scanner and the first irradiation time is indicative of a time required for the first scanner to irradiate the first region with respect to at least one of the plurality of sequential layers of construction material;

wherein irradiation of the second region is allocated to a second scanner and the second irradiation time is indicative of a time required for the second scanner to irradiate the second region with respect to at least one of the plurality of sequential layers of construction material; and

wherein the first irradiation time and the second irradiation time are at least approximately the same.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 16, 2023
From: HERZOG, FRANK; BECHMANN, FLORIAN; LIPPERT, MARKUS; HOCH, JOHANNA; TARASOV, ALEXEY; ZEULNER, FABIAN
To: CONCEPT LASER GMBH
Reel/Frame 062718/0618 →
MERGER AND CHANGE OF NAME Recorded Oct 16, 2020
From: CL SCHUTZRECHTSVERWALTUNGS GMBH; CONCEPT LASER GMBH
To: CONCEPT LASER GMBH
Reel/Frame 054101/0797 →
Priority Claims (1)
DE 1102014016679.1 · Nov 12, 2014 · national
Continuity (3)
Continuation 16007813 · Jun 13, 2018
Division 15526711
Related Publication 20210101333A1 · Apr 8, 2021