Side looking occupancy sensor
A side looking occupancy sensor is incorporated in a conventional wall switch mounted into a switch box adjacent to a door. The side-looking proximity sensor preferably is mountable to either side of the doorjamb to make the side-looking proximity sensor face the door opening. During operation, the side-looking sensor monitors the door movement or senses the passage of a person for indication that a person is entering or leaving the space. Entry and exit determination is made based on activation of the side-looking sensor.
1. A method for controlling the application of electrical power to electrical loads in a room with a doorway comprising the steps:
providing a proximity sensor for sensing people passing through the doorway the proximity sensor having two zones of monitoring wherein the first monitoring zone is adjacent to the door opening and the second monitoring zone is at a distance away from the door opening;
transmitting a signal from the proximity sensor to a controller within a load control device mounted adjacent to the doorway when people pass through the doorway;
operably coupling an occupancy sensor in the room for sensing when a person enters or leaves the room and transmitting a signal from the occupancy sensor to the controller when a person enters or leaves the room;
applying power from the controller to the electrical loads upon detection of activation in the first monitoring zone before an activation in the second monitoring zone or upon detection of an activation in the first monitoring zone before activation in the first monitoring zone.
2. The method of claim 1 further including the steps of:
applying power to the electrical loads in response to a first signal from the proximity sensor and a first signal from the occupancy sensor;
establishing a first time-out period;
applying power to the electrical loads in response to a first signal from the proximity sensor and a second signal from the occupancy sensor; and
establishing a second time-out period with the second time-out period is shorter than the first time-out period.
3. The method of claim 1 further including the steps of:
applying power to the electrical loads on ingress detection and disconnecting power to the electrical loads on egress detection.