IP Library Granted Patent US 11,680,388
Granted Patent B2
US 11,680,388 · App. 17/172,270 · Granted Jun 20, 2023

System and method for collecting operational vibration data for a mining machine

Inventor: Brian N. White (Brookfield, WI)
Assignee: Joy Global Surface Mining Inc
E02F9/267E02F9/26E21C35/00E02F3/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,680,388
App. No.
17/172,270
Granted
Jun 20, 2023
Kind
B2
Abstract

A system and method for collecting operational vibration data for a mining machine. The method includes, receiving at least one motion command. The method further includes, controlling at least one component based on the at least one motion command. The method further includes determining, by an electronic processor, at least one predicate parameter. The method further includes determining, by the electronic processor, whether the predicate parameter is true. The method further includes, while the at least one component is being controlled based on the motion command and the at least one predicate parameter is true, receiving, from a plurality of sensors, each of the plurality of sensors positioned at one of a plurality of measurement points on the at least one component of the mining machine, a plurality of vibration data sets.

Claims (36)

1. A mining machine comprising:

a plurality of movable components;

one or more motor operatively coupled to the plurality of movable components;

a plurality of sensors, each of the plurality of sensors positioned at one of a plurality of measurement points on at least one of the components of the mining machine; and

an electronic processor coupled to the plurality of sensors and configured to

receive a signal including a parameter related to a motion of at least one of the components of the mining machine,

identify a steady state of the mining machine, the steady state identified based at least in part on a window of time when a fluctuation of the parameter is below a predetermined maximum value,

receive, from the plurality of sensors, a plurality of vibration data sets, and

select a vibration data subset from the plurality of vibration data sets corresponding to the steady state of the mining machine.

2. The mining machine of claim 1 , wherein the parameter includes at least one selected from the group consisting of a motor speed, a motor acceleration, and a motor torque.

3. The mining machine of claim 1 , wherein each of the vibration data sets is a waveform between five and ten seconds in length, and wherein the vibration data subset is a waveform of approximately one second long.

4. The mining machine of claim 1 , wherein the electronic processor further selects the vibration data subset based on a window of time with at least one selected from the group consisting of a low peak motor acceleration, a low total fluctuation in motor speed, a low rate of change in motor torque, and a low total fluctuation in motor torque.

5. The mining machine of claim 1 , wherein the electronic processor receives the plurality of vibration data sets during active mining operations.

6. The mining machine of claim 1 , wherein at least one of the components is one selected from a group consisting of a hoist motor and a pinion shaft, a hoist intermediate shaft,

a hoist drum, a swing motor and a pinion shaft, a swing intermediate shaft, a swing output shaft, a crowd motor, a crowd input shaft, and a crowd intermediate shaft.

7. The mining machine of claim 1 , wherein the electronic processor is a first electronic processor; and

further comprising a second electronic processor coupled to the first electronic processor,

the second electronic processor configured to control at least one of the components,

wherein the first electronic processor receives the signal including the parameter from the second electronic processor.

8. The mining machine of claim 1 , wherein the plurality of sensors includes a plurality of accelerometers.

9. The mining machine of claim 1 , further comprising at least one tachometer positioned to monitor at least one of the components, wherein the electronic processor is coupled to the tachometer and is further configured to receive the signal including the parameter from the tachometer.

10. The mining machine of claim 1 , wherein the electronic processor is further configured to determine whether each of the plurality of vibration data sets is valid, and wherein the electronic processor is further configured to writing the plurality of vibration data sets to a memory when each of the plurality of vibration data sets is valid.

11. A method of analyzing vibration data for a mining machine, the method comprising:

receiving, by an electronic processor, a signal including a parameter related to a motion of at least one component of the mining machine, wherein one or more motor is operatively coupled to the at least one component;

identifying, by the electronic processor, a steady state of the mining machine, the steady state identified based at least in part on a window of time when a fluctuation of the parameter is below a predetermined maximum value;

receiving, by the electronic processor, a plurality of vibration data sets from a plurality of sensors, each of the plurality of sensors positioned at one of a plurality of measurement points on at least one of the components of the mining machine; and

selecting, by the electronic processor, a vibration data subset from the plurality of vibration data sets corresponding to the steady state of the mining machine.

12. The method of claim 11 , wherein the parameter includes at least one selected from the group consisting of a motor speed and a motor torque.

13. The mining machine of claim 11 , wherein each of the vibration data sets is a waveform between five and ten seconds in length, and wherein the vibration data subset is a waveform of approximately one second long.

14. The mining machine of claim 11 , wherein selecting the vibration data subset further includes selecting the vibration subset based on a window of time with at least one selected from the group consisting of a low peak motor acceleration, a low total fluctuation in motor speed, a low rate of change in motor torque, and a low total fluctuation in motor torque.

15. The method of claim 11 , wherein receiving the plurality of vibration data sets includes receiving the plurality of vibration sets during active mining operations.

16. The method of claim 11 , wherein at least one of the components is one selected from a group consisting of a hoist motor and a pinion shaft, a hoist intermediate shaft, a hoist drum, a swing motor and a pinion shaft, a swing intermediate shaft, a swing output shaft, a crowd motor, a crowd input shaft, and a crowd intermediate shaft.

17. The method of claim 11 , wherein the electronic processor is a first electronic processor; and wherein the first electronic processor receives the signal including the parameter from a second electronic processor, the second electronic processor configured to control at least one of the components of the mining machine.

18. The method of claim 11 , wherein the plurality of sensors includes a plurality of accelerometers.

19. The method of claim 11 , wherein the electronic processor is coupled to a tachometer, the tachometer positioned to monitor at least one of the components, and wherein receiving the signal including the parameter includes receiving a signal from the tachometer.

20. The method of claim 11 , further comprising determining whether each of the plurality of vibration data sets is valid, and writing the plurality of vibration data sets to a memory when each of the plurality of vibration data sets is valid.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 10, 2021
From: WHITE, BRIAN N.
To: HARNISCHFEGER TECHNOLOGIES, INC,
Reel/Frame 055211/0837 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 10, 2021
From: HARNISCHFEGER TECHNOLOGIES, INC.
To: JOY GLOBAL SURFACE MINING INC
Reel/Frame 055211/0958 →
Continuity (2)
Continuation 16312730
Related Publication 20210189698A1 · Jun 24, 2021