IP Library Granted Patent US 11,846,185
Granted Patent B2
US 11,846,185 · App. 17/202,676 · Granted Dec 19, 2023

Lateral boreholes in an earth formation

Inventors: Robert Theodore Hahn (Houston, TX); Kareem Mouhannad El-Sadi (Houston, TX); Brandon McFarlane Foote (Houston, TX); Philip Adam Vogelsberg (Katy, TX); Eric David Schumacker (Houston, TX); Rene Hernandez Arces (Tomball, TX)
Assignee: SHELL USA, INC.
E21B7/046E21B7/06E21B43/305
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,846,185
App. No.
17/202,676
Granted
Dec 19, 2023
Kind
B2
Abstract

A horseshoe lateral is drilled having two substantially parallel lateral sections connected with a horseshoe section. The horseshoe section may be obtained by steering a drill bit within a first plane over an in-plane angle of about 180°, and then continuing drilling along a straight path. A second lateral well system may drilled from a second borehole section, to create an additional lateral section interdigitally arranged between the previous two substantially parallel lateral sections.

Claims (44)

1. A method of drilling a lateral borehole in an Earth formation, comprising:

commencing drilling from surface in a first drilling direction, at a first angle relative to a vertically downward direction, whereby creating a first section of the borehole;

building to a second drilling direction at a second angle relative to the vertically downward direction, which second angle is larger than the first angle;

defining a first plane that is parallel to said second drilling direction and parallel to an auxiliary direction that is both horizontal and perpendicular to said second drilling direction;

continuing drilling in said first plane and in said second drilling direction whereby creating a second section of the borehole;

steering said drilling within said first plane whereby changing direction of drilling from the second drilling direction to a third drilling direction;

continuing drilling along a straight path in said first plane in the third drilling direction, whereby creating a third section of the borehole, wherein the third drilling direction differs by about 180° from the second drilling direction.

2. The method of claim 1 , wherein the borehole being drilled in said first plane is within a single Earth stratum.

3. The method of claim 1 , wherein the borehole being drilled in said first plane is within a single hydrocarbon producing Earth stratum.

4. The method of claim 1 , wherein said second drilling direction is within 10° from horizontal.

5. The method of claim 1 , wherein after drilling the borehole, seen in a vertical projection, has a U shape.

6. The method of claim 1 , further comprising drilling an additional lateral section from a second borehole section from surface, and extending interdigitally between the second section and third section.

7. The method of claim 6 , wherein said additional lateral section is drilled in said first plane.

8. The method of claim 6 , wherein said additional lateral section is drilled in a second plane which is essentially parallel displaced from said first plane.

9. A hydrocarbon fluid producing well comprising borehole in an Earth formation, said borehole comprising:

a first section drilled from surface in a first drilling direction, at a first angle relative to a vertically downward direction;

a second section drilled in a second drilling direction at a second angle relative to the vertically downward direction, which second angle is larger than the first angle;

a building section connecting the first section and the second section;

a third section drilled along a straight path in a third drilling direction, in a first plane defined parallel to said second drilling direction and parallel to an auxiliary direction that is both horizontal and perpendicular to said second drilling direction, wherein the third drilling direction differs by about 180′ from the second drilling direction;

a horseshoe section within said first plane connecting the second section and the third section;

wherein the first, second, horseshoe, and third sections are formed in a continuous path drilled in sequence.

10. The hydrocarbon fluid producing well of claim 9 , wherein the borehole being drilled in said first plane is within a single Earth stratum.

11. The hydrocarbon fluid producing well of claim 9 , wherein said second drilling direction is within 10° from horizontal.

12. The hydrocarbon fluid producing well of claim 9 , wherein after drilling the borehole, seen in a vertical projection, has a U shape.

13. The hydrocarbon fluid producing well of claim 9 , further comprising an additional lateral section connected to a second borehole section from surface, and extending interdigitally between the second section and third section.

14. The hydrocarbon fluid producing well of claim 13 , wherein said additional lateral section extends within said first plane.

15. The hydrocarbon fluid producing well of claim 13 , wherein said additional lateral section extends within a second plane which is essentially parallel displaced from said first plane.

16. A method of drilling a lateral borehole in an Earth formation, comprising:

commencing drilling from surface in a first drilling direction, at a first angle relative to a vertically downward direction, towards a hydrocarbon fluid containing Earth stratum;

building to a second drilling direction at a second angle relative to the vertically downward direction, which second angle is larger than the first angle;

defining a first plane that is parallel to said second drilling direction and parallel to an auxiliary direction that is both parallel to a stratal horizon associated with said hydrocarbon fluid containing Earth stratum in proximity to the borehole and perpendicular to said second drilling direction;

continuing drilling in said first plane and in said second drilling direction;

steering said drilling within said first plane whereby changing direction of drilling from the second drilling direction to a third drilling direction;

continuing drilling along a straight path in said first plane in the third drilling direction, wherein the third drilling direction differs by about 180° from the second drilling direction.

17. The method of claim 16 , wherein the borehole being drilled in said first plane is exclusively within said hydrocarbon fluid producing Earth stratum.

18. The method of claim 16 , wherein at least one of said second drilling direction and said auxiliary direction is within 10° from horizontal.

19. The method of claim 16 , wherein after drilling the borehole, seen in a vertical projection, has a U shape.

20. A hydrocarbon fluid producing well comprising borehole in an Earth formation, said borehole comprising:

a first section drilled from surface in a first drilling direction, at a first angle relative to a vertically downward direction towards a hydrocarbon fluid containing Earth stratum;

a second section drilled in a second drilling direction at a second angle relative to the vertically downward direction, which second angle is larger than the first angle;

a building section connecting the first section and the second section;

a third section drilled along a straight path in a third drilling direction, in a first plane defined parallel to said second drilling direction and parallel to an auxiliary direction that is both parallel to a stratal horizon associated with said hydrocarbon fluid containing Earth stratum in proximity to the borehole and perpendicular to said second drilling direction, wherein the third drilling direction differs by about 180° from the second drilling direction;

a horseshoe section within said first plane connecting the second section and the third section;

wherein the first, second, horseshoe, and third sections are formed in a continuous path drilled in sequence.

Assignments (2)
CHANGE OF NAME Recorded Oct 10, 2023
From: SHELL OIL COMPANY
To: SHELL USA, INC.
Reel/Frame 065210/0115 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 16, 2021
From: HAHN, ROBERT THEODORE; EL-SADI, KAREEM MOUHANNAD; FOOTE, BRANDON MCFARLANE; VOGELSBERG, PHILIP ADAM; SCHUMACKER, ERIC DAVID; ARCES, RENE HERNANDEZ
To: SHELL OIL COMPANY
Reel/Frame 055604/0805 →
Continuity (3)
Continuation 16588225 · Sep 30, 2019
Provisional Application 62880714 · Jul 31, 2019
Related Publication 20210198948A1 · Jul 1, 2021