IP Library › Granted Patent US 11,755,971
Granted Patent B2
US 11,755,971 · App. 17/224,308 · Granted Sep 12, 2023

Threshold based selective maintenance of series-parallel systems

Inventors: Krishna M. Kalyanam (Campbell, CA); Kai Goebel (Mountain View, CA); Ron Zvi Stern (Palo Alto, CA)
Assignee: Novity, Inc.
G06Q10/06312G06N7/01G06Q10/0633G06Q10/0639G06Q10/06313G06Q10/06315G06Q10/06316G06Q10/063114
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,755,971
App. No.
17/224,308
Granted
Sep 12, 2023
Kind
B2
Abstract

A condition of an asset including one or more subsystems connected in series is monitored. Each subsystem includes one or more components connected in parallel. The asset has one or more jobs. A probability of the asset surviving a predetermined amount of time is determined based on the monitoring and one or more shared resources. The one or more shared resources are configured to be shared between the subsystems. A model is established using a threshold based heuristic maintenance policy. The model is configured to maximize a number of successful jobs that the asset is able to complete based on the determined probability. The one or more shared resources are allocated to the one or more subsystems based on the model.

Claims (29)

1. A method comprising:

monitoring a condition of a physical asset comprising one or more subsystems connected in series, each subsystem comprising one or more components connected in parallel, the physical asset having one or more jobs and experiencing one or more shutdowns between consecutive operational periods, wherein monitoring the condition of the physical asset involves determining that the one or more subsystems are functioning properly;

determining a probability of the physical asset surviving a predetermined amount of time based on the monitoring and one or more shared resources, the one or more shared resources configured to be shared between the subsystems;

establishing a model using a threshold based heuristic maintenance policy and known failure rates of the one or more components, the model configured to maximize a number of successful jobs that the physical asset is able to complete based on the determined probability; and

mitigating downtime and a cost associated with shutdowns of the physical asset, including the one or more subsystems and the one or more components of each subsystem, by allocating the one or more shared resources to the one or more subsystems based on the model.

2. The method of claim 1 , wherein the one or more jobs comprise one or more substantially identical jobs.

3. The method of claim 1 , wherein the model comprises minimizing a shared resource cost.

4. The method of claim 3 , wherein the shared resource cost is calculated using a Maximal Marginal Reward (MMR) algorithm that is configured to maximize an expected payout.

5. The method of claim 1 , further comprising determining a maintenance schedule based on the model.

6. The method of claim 1 , wherein monitoring the condition of the physical asset comprises determining if all subsystems are functioning.

7. The method of claim 1 , wherein the one or more components are redundant within each subsystem.

8. The method of claim 1 , wherein the shared resources comprise one or more of man hours and parts used to perform maintenance.

9. The method of claim 1 , wherein the one or more shared resources comprise one or both of consumable resources and replenishable resources.

10. A system, comprising:

a processor; and

a memory storing computer program instructions which when executed by the processor cause the processor to perform operations comprising:

monitoring a condition of a physical asset comprising one or more subsystems connected in series, each subsystem comprising one or more components connected in parallel, the physical asset having one or more jobs and experiencing one or more shutdowns between consecutive operational periods, wherein monitoring the condition of the physical asset involves determining that the one or more subsystems are functioning properly;

establishing one or more consumable resources that are shared among the one or more subsystems;

determining a probability of the physical asset surviving a predetermined amount of time based on the monitoring and the one or more consumable resources;

establishing a model using a threshold based heuristic maintenance policy and known failure rates of the one or more components, the model configured to maximize a number of successful jobs that the physical asset is able to complete based on the determined probability; and

mitigating downtime and a cost associated with shutdowns of the physical asset, including the one or more subsystems and the one or more components of each subsystem, by allocating the one or more consumable resources to the one or more subsystems based on the model.

11. The system of claim 10 , wherein the one or more jobs comprise one or more substantially identical jobs.

12. The system of claim 10 , wherein the model comprises minimizing a shared resource cost.

13. The system of claim 12 , wherein the shared resource cost is calculated using a Maximal Marginal Reward (MMR) algorithm that is configured to maximize an expected payout.

14. The system of claim 10 , wherein the processor is configured to determine a maintenance schedule based on the model.

15. The system of claim 10 , wherein monitoring the condition of the physical asset comprises determining if all subsystems are functioning.

16. The system of claim 10 , wherein the one or more components are redundant within each subsystem.

17. The system of claim 10 , wherein the one or more consumable resources comprise one or more of man hours and parts used to perform maintenance.

18. The system of claim 10 , wherein the one or more consumable resources comprise replenishable resources.

Assignments (3)
CHANGE OF ADDRESS Recorded Apr 14, 2023
From: PALO ALTO RESEARCH CENTER INCORPORATED
To: NOVITY, INC.
Reel/Frame 063339/0116 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2023
From: PALO ALTO RESEARCH CENTER INCORPORATED
To: NOVITY, INC.
Reel/Frame 062981/0482 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2021
From: KALYANAM, KRISHNA M.; GOEBEL, KAI; STERN, RON ZVI
To: PALO ALTO RESEARCH CENTER INCORPORATED
Reel/Frame 055856/0776 →
Continuity (1)
Related Publication 20220351106A1 · Nov 3, 2022