IP Library › Granted Patent US 11,753,918
Granted Patent B2
US 11,753,918 · App. 17/299,917 · Granted Sep 12, 2023

Method for multilayer hydraulic fracturing treatment with real-time adjusting

Inventors: Denis Viktorovich Bannikov (Novosibirsk, RU); Ivan Anatolyevich Tsygulev (Moscow, RU); Ivan Vladimirovich Velikanov (Novosibirsk, RU)
Assignee: SCHLUMBERGER TECHNOLOGY CORPORATION
E21B43/267E21B47/06G01V99/005E21B2200/20G06F30/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,753,918
App. No.
17/299,917
Granted
Sep 12, 2023
Kind
B2
Abstract

Methods include designing and performing hydraulic fracturing treatments that utilize tube wave analysis by a combination of a flow rate splitting simulator and a multilayer fracturing (MLF) simulator to optimize treatment design parameters. Methods may also be directed to monitoring, controlling, evaluating and improving hydraulic fracturing treatments in real-time.

Claims (22)

1. A method for treating of subterranean formation, comprising:

(1) selecting a wellbore for a multilayer hydraulic fracturing treatment, creating an initial job design for the multilayer hydraulic fracturing treatment, setting one or more fracturing job criterion, and generating a model of tube wave propagation in the wellbore based on the initial job design;

(2) initiating a portion of the initial job design;

(3) generating one or more tube waves in the wellbore and monitoring one or more reflections of the one or more tube waves, and calculating a number of open fractures and fracture geometry parameters with the model of tube wave propagation;

(4) performing real-time evaluation of the fracture geometry parameters by:

estimating one or more pumping flow rates into the number of open fractures; and simulating a fracturing process for the number of open fractures using a multilayer fracturing simulator;

(5) adjusting of the parameters of the multilayer fracturing simulator until the number of open fractures, one or more pumping flow rates, and fracture geometry parameters from stage (3) coincide with the real-time evaluation of the fracture geometry parameters from stage (4) to generate an adjusted hydraulic fracturing simulator;

(6) calculating the fracture geometry parameters with the adjusted hydraulic fracturing simulator to generate a measured job design;

(7) calculating the difference between the fracturing criterion of the initial job design and the measured job design; and

(8) performing one of:

verifying that the difference from stage (7) is below an assigned variance for the one or more fracturing job criterion and continuing the initial job design; or

updating the initial job design and repeating stages (6) and (7) until the difference from stage (7) is below the assigned variance for the one or more fracturing job criterion and continuing with an update of the initial job design; and

(9) repeating stages (3) to (8) until the multilayer hydraulic fracturing treatment is completed.

2. The method of claim 1 , wherein the model for tube wave propagation comprises a parameter of wellbore reflectivity.

3. The method of claim 1 , wherein the fracturing job criterion is the total amount of proppant placed into all fractures.

4. The method of claim 1 , wherein a number of stimulated fractures in the multilayer hydraulic fracturing treatment differs from the initial job design.

5. The method of claim 1 , wherein the fracturing job criterion is a specific amount of proppant in each fracture.

6. The method of claim 1 , wherein the model of tube wave propagation determines a number of open fractures in the wellbore and one or more fracture geometry parameters selected from a group: fracture depth, fracture length, width, and height.

7. The method of claim 1 , wherein the monitoring of reflected tube waves is performed by a pressure sensor at the wellhead of the wellbore or by one or more distributed pressure sensors in the wellbore.

8. The method of claim 1 , wherein real-time evaluation is performed through modeling a slurry flow into the wellbore to calculate the flow rate distribution among multiple fractures.

9. The method of claim 1 , wherein simulating a fracturing process for the number of open fractures using a multilayer fracturing simulator comprises evaluating one or more fracture geometry parameters.

10. The method of claim 1 , wherein adjusting the multilayer fracturing simulator comprises adjusting one or more job parameters selected from a group consisting of: pumping flow rate, proppant concentration, proppant size, fiber additives, fluid type, and fluid additives amount.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2021
From: VELIKANOV, IVAN VLADIMIROVICH; BANNIKOV, DENIS VIKTOROVICH; TSYGULEV, IVAN ANATOLYEVICH
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 056449/0443 →
Continuity (1)
Related Publication 20220082004A1 · Mar 17, 2022
Cited By (1)
US 12,618,314