System and method for providing grid-forming control of an inverter-based resource

Inventors: Dustin Howard (Brookhaven, GA); Einar Vaughn Larsen (Ballston Lake, NY)
Assignee: General Electric Company
H02P9/02H02M7/53875H02P2101/15
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,632,065
App. No.
17/400,800
Granted
Apr 18, 2023
Kind
B2
Abstract

A method for providing grid-forming control of an inverter-based resource includes monitoring the electrical grid for one or more grid events. The method also includes controlling, via a power regulator of a controller, an active power of the inverter-based resource based on whether the one or more grid events is indicative of a severe grid event. In particular, when the one or more grid events are below a severe grid event threshold, thereby indicating the one or more grid events is not a severe grid event, the method includes controlling, via the power regulator, the active power according to a normal operating mode. Further, when the one or more grid events exceed the severe grid event threshold, thereby indicating the one or more grid events is a severe grid event, the method includes controlling, via the power regulator, the active power according to a modified operating mode. Moreover, the modified operating mode includes temporarily re-configuring the power regulator to reduce or eliminate power overloads induced by the severe grid event for as long as the one or more grid events exceed the severe grid event threshold.

Claims (38)

1. A method for providing grid-forming control of an inverter-based resource connected to an electrical grid, the method comprising:

monitoring the electrical grid for one or more grid events;

controlling, via a power regulator of a controller, an active power of the inverter-based resource based on whether the one or more grid events is indicative of the severe grid event,

wherein, when the one or more grid events are below a severe grid event threshold, thereby indicating the one or more grid events is not a severe grid event, controlling, via the power regulator, the active power according to a normal operating mode, and

wherein, when the one or more grid events exceed the severe grid event threshold, thereby indicating the one or more grid events is a severe grid event, controlling, via the power regulator, the active power according to a modified operating mode,

wherein the modified operating mode comprises temporarily re-configuring the power regulator to reduce or eliminate power overloads induced by the severe grid event for as long as the one or more grid events exceed the severe grid event threshold, wherein temporarily re-configuring the power regulator to reduce or eliminate the power overloads induced by the severe grid event for as long as the one or more grid events exceed the severe grid event threshold further comprises providing a low to zero inertia control structure to allow for faster control of the active power.

2. The method of claim 1 , wherein monitoring the electrical grid for one or more grid events further comprises monitoring one or more voltage feedbacks of the electrical grid and comparing the one or more voltage feedbacks to a voltage threshold.

3. The method of claim 1 , further comprising determining whether the one or more grid events is indicative of the severe grid event using control signals for at least one of an power angle command, a maximum angle limit, and a minimum angle limit.

4. The method of claim 3 , wherein, during the normal operating mode, when the power angle command is within a desired angle limit, the method further comprises incrementally increasing a first power angle limit counter, and wherein, when the power angle command is outside of the desired angle limit, the method further comprises incrementally decreasing the first power angle limit counter.

5. The method of claim 1 , wherein, during the normal operating mode, when the first power angle limit counter is equal to or exceeds a first limit counter threshold for a certain duration of time, the method further comprises switching the power regulator to the modified operating mode.

6. The method of claim 1 , wherein providing a low to zero inertia control structure to allow for faster control of the active power further comprises:

setting an inertial power regulator frequency of the power regulator equal to a phase-locked loop frequency of the power regulator; and

setting the power angle command equal to a feed-forward power angle command of the power regulator.

7. The method of claim 6 , wherein, during the modified operating mode, the method further comprises:

incrementally increasing a second power angle limit counter when the power angle command is within the desired angle limit; and

incrementally decreasing the second power angle limit counter when the power angle command is outside of the desired angle limit.

8. The method of claim 7 , wherein, when the second power angle limit counter exceeds a second limit counter threshold for the certain duration of time, the method further comprises switching to the normal operating mode once the one or more voltage feedbacks from the electrical grid are in a normal range and a frequency of the electrical grid stabilizes.

9. The method of claim 8 , wherein the normal range comprises voltage values ranging from about 0.9 pu to about 1.1 pu.

10. The method of claim 8 , further comprising resetting second power angle limit counter along with switching to the normal operating mode.

11. A converter controller for providing grid-forming control of an inverter-based resource connected to an electrical grid, the converter controller comprising:

at least one controller comprising at least one processor, the at least one processor configured to perform a plurality of operations, the plurality of operations comprising:

monitoring the electrical grid for one or more grid events;

controlling, via a power regulator, an active power of the inverter-based resource based on whether the one or more grid events is indicative of the severe grid event,

wherein, when the one or more grid events are below a severe grid event threshold, thereby indicating the one or more grid events is not a severe grid event, controlling, via the power regulator, the active power according to a normal operating mode,

wherein, when the one or more grid events exceed the severe grid event threshold, thereby indicating the one or more grid events is a severe grid event, controlling, via the power regulator, the active power according to a modified operating mode,

wherein the modified operating mode comprises temporarily re-configuring the power regulator to reduce or eliminate power overloads induced by the severe grid event for as long as the one or more grid events exceed the severe grid event threshold, wherein temporarily re-configuring the power regulator to reduce or eliminate the power overloads induced by the severe grid event for as long as the one or more grid events exceed the severe grid event threshold further comprises providing a low to zero inertia control structure to allow for faster control of the active power.

12. The converter controller of claim 11 , wherein monitoring the electrical grid for one or more grid events further comprises monitoring one or more voltage feedbacks of the electrical grid and comparing the one or more voltage feedbacks to a voltage threshold.

13. The converter controller of claim 11 , wherein the plurality of operations further comprise determining whether the one or more grid events is indicative of the severe grid event using control signals for at least one of an power angle command, a maximum angle limit, and a minimum angle limit.

14. The converter controller of claim 13 , wherein, during the normal operating mode, when the power angle command is within a desired angle limit, the plurality of operations further comprising incrementally increasing a first power angle limit counter, and wherein, when the power angle command is outside of the desired angle limit, the plurality of operations further comprise incrementally decreasing the first power angle limit counter.

15. The converter controller of claim 11 , wherein, during the normal operating mode, when the first power angle limit counter is equal to or exceeds a first limit counter threshold for a certain duration of time, the plurality of operations further comprise switching the power regulator to the modified operating mode.

16. The converter controller of claim 11 , wherein providing a low to zero inertia control structure to allow for faster control of the active power further comprises:

setting an inertial power regulator frequency of the power regulator equal to a phase-locked loop frequency of the power regulator; and

setting the power angle command equal to a feed-forward power angle command of the power regulator.

17. The converter controller of claim 16 , wherein, during the modified operating mode, the plurality of operations further comprise:

incrementally increasing a second power angle limit counter when the power angle command is within the desired angle limit; and

incrementally decreasing the second power angle limit counter when the power angle command is outside of the desired angle limit.

18. The converter controller of claim 17 , wherein, when the second power angle limit counter exceeds a second limit counter threshold for the certain duration of time, the plurality of operations further comprise:

switching to the normal operating mode once the one or more voltage feedbacks from the electrical grid are in a normal range and a frequency of the electrical grid stabilizes; and resetting second power angle limit counter along with switching to the normal operating mode.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 12, 2021
From: HOWARD, DUSTIN; LARSEN, EINAR VAUGHN
To: GENERAL ELECTRIC COMPANY
Reel/Frame 057163/0939 →
Continuity (1)
Related Publication 20230052292A1 · Feb 16, 2023