IP Library Granted Patent US 11,757,594
Granted Patent B2
US 11,757,594 · App. 17/405,263 · Granted Sep 12, 2023

Determining phase tracking reference signals in multiple transmission points

Inventors: Mattias Frenne (Uppsala, SE); Shiwei Gao (Nepean, CA); Siva Muruganathan (Stittsville, CA)
Assignee: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
H04L5/0053H04B7/08H04L5/0023H04L5/0048H04L5/0094H04W72/23
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,757,594
App. No.
17/405,263
Granted
Sep 12, 2023
Kind
B2
Abstract

A method for a UE in a multiple transmission points communication system, mTRP, scheme, is provided. The method includes receiving downlink control information, DCI, indicating a at least two transmission points scheme for a scheduled data transmission on physical resource blocks, PRBs. The PRBs includes at least a first subsets of PRBs, associated with a first transmission point, and a second subset of PRBs, associated with a second transmission point. The method further includes determining a first PT-RS frequency density for the first set of PRBs based on the number of PRBs in the first set of PRBs and a second PT-RS frequency density based on the number of PRBs in the second set of PRBs. A UE, methods for a base station and a base station are also provided.

Claims (40)

1. A method for a UE in a multiple transmission points communication system, mTRP, the method comprising:

receiving a higher layer configuration of a mTRP scheme;

receiving downlink control information, DCI, indicating a first Transmission Configuration Indicator, TCI, state and a second TCI state in one Code Division Multiplexing, CDM, group for a scheduled data transmission on physical resource blocks, PRBs, wherein the PRBs comprise at least a first subset of PRBs, associated with the first TCI state, and a second subset of PRBs, associated with the second TCI state; and

determining a first Phase Tracking Reference Signal, PT-RS, frequency density for a PT-RS port in the first subset of PRBs based on a number of PRBs in the first subset of PRBs and a second PT-RS frequency density for the same PT-RS port in the second subset of PRBs based on a number of PRBs in the second subset of PRBs.

2. The method according to claim 1 , wherein the first TCI state is associated with a first transmission point in the multiple transmission points communication system and wherein the second TCI state is associated with a second transmission point in the multiple transmission points communication system.

3. The method according to claim 1 , wherein the PT-RS to resource element mapping is associated to allocated PRBs for each TCI state.

4. The method according to claim 1 , wherein the scheduled data transmission comprises one or more physical downlink shared channel, PDSCH, transmissions scheduled by the DCI.

5. The method according to claim 1 , wherein the first PT-RS frequency density and the second PT-RS frequency density are determined for the same PT-RS port.

6. The method according to claim 5 , wherein the mTRP scheme is one of a frequency division multiplexing, FDM, Scheme 2a, wherein a single PDSCH transmission for a transport block, TB, is scheduled across the first subset of PRBs and the second subset of PRBs, or a FDM Scheme 2b, wherein a first PDSCH transmission for a TB is scheduled in the first subset of PRBs and a second PDSCH transmission for the same TB is scheduled in the second subset of PRBs.

7. The method according to claim 1 wherein the at least the first subset of PRBs and the second subset of PRBs are non-overlapping.

8. A user equipment, UE, operable in a multiple transmission points communication system, mTRP, the UE comprising a transceiver and processing circuitry configured to:

receive a higher layer configuration of a mTRP scheme;

receive downlink control information, DCI, indicating a first Transmission Configuration Indicator, TCI, state and a second TCI state in one Code Division Multiplexing, CDM, group for a scheduled data transmission on physical resource blocks, PRBs, wherein the PRBs comprise at least a first subset of PRBs, associated with the first TCI state, and a second subset of PRBs, associated with the second TCI state; and

determine a first Phase Tracking Reference Signal, PT-RS, frequency density for a PT-RS port in the first subset of PRBs based on a number of PRBs in the first subset of PRBs and a second PT-RS frequency density for the same PT-RS port in the second subset of PRBs based on a number of PRBs in the second subset of PRBs.

9. The UE according to claim 8 , wherein the first TCI state is associated with a first transmission point in the multiple transmission points communication system and wherein the second TCI state is associated with a second transmission point the multiple transmission points communication system.

10. The UE according to claim 8 , wherein the PT-RS to resource element mapping is associated to allocated PRBs for each TCI state.

11. The UE according to claim 8 , wherein the scheduled data transmission comprises one or more physical downlink shared channel, PDSCH, transmissions scheduled by the DCI.

12. The UE according to claim 8 , wherein the first PT-RS frequency density and the second PT-RS frequency density are determined for the same PT-RS port.

13. The UE according to claim 12 , wherein the mTRP scheme is one of a frequency division multiplexing, FDM, Scheme 2a, wherein a single PDSCH transmission for a transport block, TB, is scheduled across the first subset of PRBs and the second subset of PRBs, or a FDM Scheme 2b, wherein a first PDSCH transmission for a TB is scheduled in the first subset of PRBs and a second PDSCH transmission for the same TB is scheduled in the second subset of PRBs.

14. The UE according to claim 8 , wherein the at least the first subset of PRBs and the second subset of PRBs are non-overlapping.

15. A method for a base station in a multiple transmission points communication system, mTRP, scheme, the method comprising:

transmitting a higher layer configuration of a mTRP scheme;

transmitting downlink control information, DCI, indicating a first Transmission Configuration Indicator, TCI, state and a second TCI state in one Code Division Multiplexing, CDM, group for a scheduled data transmission on physical resource blocks, PRBs, wherein the PRBs comprise at least a first subset of PRBs, associated with the first TCI state, and a second subset of PRBs, associated with the second TCI state; and

wherein a first Phase Tracking Reference Signal, PT-RS, frequency density for a PT-RS port for the first subset of PRBs is obtainable based on a number of PRBs in the first subset of PRBs and a second PT-RS frequency density for the same PT-RS port in the second subset of PRBs is obtainable based on a number of PRBs in the second subset of PRBs.

16. The method according to claim 15 , wherein the first TCI state is associated with a first transmission point in the multiple transmission points communication system and wherein the second TCI state is associated with a second transmission point in the multiple transmission points communication system.

17. The method according to claim 15 , wherein the PT-RS to resource element mapping is associated to allocated PRBs for each TCI state.

18. The method according to claim 15 , wherein the scheduled data transmission comprises one or more physical downlink shared channel, PDSCH, transmissions scheduled by the DCI.

19. The method according to claim 15 , wherein the first PT-RS frequency density and the second PT-RS frequency density are determined for the same PT-RS port.

20. The method according to claim 19 , wherein the mTRP scheme is one of a frequency division multiplexing, FDM, Scheme 2a, wherein a single PDSCH transmission for a transport block, TB, is scheduled across the first subset of PRBS and the second subset of PRBs, or a FDM Scheme 2b, wherein a first PDSCH transmission for a TB is scheduled in the first subset of PRBs and a second PDSCH transmission for the same TB is scheduled in the second subset of PRBs.

21. The method according to claim 15 wherein the at least the first subset of PRBs and the second subset of PRBs are non-overlapping.

22. A base station operable in a multiple transmission points communication system, mTRP, scheme, the base station comprising a transceiver and processing circuitry and configured to:

transmit a higher layer configuration of a mTRP scheme;

transmit downlink control information, DCI, indicating a first Transmission Configuration Indicator, TCI, state and a second TCI state in one Code Division Multiplexing, CDM, group for a scheduled data transmission on physical resource blocks, PRBs, wherein the PRBs comprise at least a first subset of PRBs, associated with the first TCI state, and a second subset of PRBs, associated with the second TCI state; and

wherein a first Phase Tracking Reference Signal, PT-RS, frequency density for a PT-RS port in the first subset of PRBs is obtainable based on a number of PRBs in the first subset of PRBs and a second PT-RS frequency density for the same PT-RS port in the second subset of PRBs is obtainable based on a number of PRBs in the second subset of PRBs.

23. The base station according to claim 22 , wherein the first TCI state is associated with a first transmission point in the multiple transmission points communication system and wherein the second TCI state is associated with a second transmission point in the multiple transmission points communication system.

24. The base station according to claim 22 , wherein the PT-RS to resource element mapping is associated to allocated PRBs for each TCI state.

25. The base station according to claim 22 , wherein the scheduled data transmission comprises one or more physical downlink shared channel, PDSCH, transmissions scheduled by the DCI.

26. The base station according to claim 22 , wherein the first PT-RS frequency density and the second PT-RS frequency density are determined for the same PT-RS port.

27. The base station according to claim 26 , wherein the mTRP scheme is one of a FDM Scheme 2a, wherein a single PDSCH transmission for a transport block, TB, is scheduled across the first subset of PRBS and the second subset of PRBs, or a FDM Scheme 2b, wherein a first PDSCH transmission for a TB is scheduled in the first subset of PRBs and a second PDSCH transmission for the same TB is scheduled in the second subset of PRBs.

28. The base station according to claim 22 wherein the at least the first subset of PRBs and the second subset of PRBs are non-overlapping.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 18, 2021
From: FRENNE, MATTIAS; GAO, SHIWEI; MURUGANATHAN, SIVA
To: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
Reel/Frame 057212/0943 →
Continuity (4)
Continuation 17106684 · Nov 30, 2020
Continuation PCTSE2020050988 · Oct 16, 2020
Provisional Application 62932779 · Nov 8, 2019
Related Publication 20210385045A1 · Dec 9, 2021
Cited By (1)
US 12,627,434