IP Library Granted Patent US 11,536,399
Granted Patent B2
US 11,536,399 · App. 17/427,993 · Granted Dec 27, 2022

Bundle of pipelines and spacer for use in such a bundle of pipelines

Inventor: Gijs Alewijn (Ijlst, NL)
Assignee: HEINEKEN SUPPLY CHAIN B.V.
F16L3/237F16L1/20F16L3/105F16L3/1058
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,536,399
App. No.
17/427,993
Granted
Dec 27, 2022
Kind
B2
Abstract

A spacer ( 3 ), for mutually spacing apart a first and a second pipeline in a mutually parallel manner, has a first and a second side ( 31, 32 ) for abutting against the two respective pipelines. At least two tensioning straps, which are extending in first and second longitudinal ranges ( 41, 42 ), are fixing the spacer relative to the first pipeline. The second side ( 32 ) has, in the first and second longitudinal ranges, a second abutment structure ( 52 ) for abutting against the second pipeline. Furthermore, the second side has, in a first intermediate longitudinal range ( 61 ), a first recessed intermediate surface portion ( 71 ). Thanks to the first recessed intermediate surface portion, the portions of the spacer which are extending in the first longitudinal range and the second longitudinal range are, under influence of tensioning forces of the tensioning straps, to a larger extent independently resiliently compressible relative to one another. This improves the effectivity of the tensioning straps.

Claims (19)

1. A bundle of pipelines comprising:

a first pipeline;

a second pipeline; and

a plurality of bundling assemblies, wherein:

the first pipeline and the second pipeline are extending alongside one another in a mutually parallel manner in a longitudinal direction of the bundle of pipelines, wherein the bundling assemblies in the longitudinal direction are positioned at a distance from one another;

each bundling assembly comprises a spacer and at least two tensioning straps, wherein the spacer is mutually spacing apart the first pipeline and the second pipeline in a direction perpendicular to the longitudinal direction, wherein the spacer comprises a first side and a second side, lying opposite to the first side, wherein the first side is facing the first pipeline and the second side is facing the second pipeline, wherein, as seen in a circumferential direction around the longitudinal direction, the first side partially envelopes the first pipeline and the second side partially envelopes the second pipeline, and wherein the at least two tensioning straps in the longitudinal direction are positioned at a distance from one another, wherein each tensioning strap as one closed loop is surrounding the first pipeline, the spacer and the second pipeline together in said circumferential direction, and wherein tensioning force of the at least two tensioning straps is fixing the spacer relative to the first pipeline;

the at least two tensioning straps comprise a first tensioning strap and a second tensioning strap, wherein the first tensioning strap is extending in a first longitudinal range in the longitudinal direction and the second tensioning strap is extending in a second longitudinal range in the longitudinal direction; and

the spacer comprises, at the first side, a first abutment structure for abutting against the first pipeline and comprises, at the second side, a second abutment structure for abutting against the second pipeline, wherein the second abutment structure is extending at least in the first longitudinal range and in the second longitudinal range; and

the second abutment structure of the spacer, as seen in the longitudinal direction, is at least partly interrupted in a first intermediate longitudinal range in-between the first longitudinal range and the second longitudinal range in that the second side of the spacer comprises, in the first intermediate longitudinal range, a first recessed intermediate surface portion, which, relative to the second abutment structure in the first longitudinal range and in the second longitudinal range, is recessed in the direction of the first abutment structure of the spacer.

2. The bundle of pipelines according to claim 1 , wherein:

the at least two tensioning straps further comprise a third tensioning strap, wherein the third tensioning strap is extending in a third longitudinal range in the longitudinal direction, wherein the second longitudinal range is extending in-between the first longitudinal range and the third longitudinal range; and

the second abutment structure is furthermore at least extending in the third longitudinal range, and the second abutment structure, as seen in the longitudinal direction, is at least partly interrupted in a second intermediate longitudinal range in-between the second longitudinal range and the third longitudinal range in that the second side in the second intermediate longitudinal range comprises a second recessed intermediate surface portion, which, relative to the second abutment structure in the first longitudinal range and in the second longitudinal range and in the third longitudinal range, is recessed in the direction of the first abutment structure.

3. The bundle of pipelines according to claim 2 , wherein:

the first abutment structure is extending at least in the first intermediate longitudinal range and in the second intermediate longitudinal range, and the first abutment structure, as seen in the longitudinal direction, is at least partly interrupted in the first longitudinal range and in the second longitudinal range and in the third longitudinal range in that the first side in the first longitudinal range and in the second longitudinal range and in the third longitudinal range comprises a first recessed flanking surface portion and a second recessed flanking surface portion and a third recessed flanking surface portion, respectively, which, relative to the first abutment structure in the first intermediate longitudinal range and in the second intermediate longitudinal range, are recessed in the direction of the second abutment structure.

4. The bundle of pipelines according to claim 1 , wherein:

the first abutment structure is extending at least in the first intermediate longitudinal range, and the first abutment structure, as seen in the longitudinal direction, is at least partly interrupted in the first longitudinal range and in the second longitudinal range in that the first side in the first longitudinal range and in the second longitudinal range comprises a first recessed flanking surface portion and a second recessed flanking surface portion, respectively, which, relative to the first abutment structure in the first intermediate longitudinal range, are recessed in the direction of the second abutment structure.

5. The bundle of pipelines according to claim 1 , wherein, as seen in transverse cross-section perpendicular to the longitudinal direction, the first abutment structure comprises a substantially V-shaped part, wherein the V-shaped part with a point of its V-shape faces away from a central axis of the first pipeline.

6. The bundle of pipelines according to claim 5 , wherein, as seen in transverse cross-section perpendicular to the longitudinal direction, the first abutment structure comprises a substantially plurally V-shaped part, wherein the plurally V-shaped part with respective points of its plural V-shape faces away from a central axis of the first pipeline.

7. The bundle of pipelines according to claim 1 , wherein each bundling assembly further comprises a covering element which comprises a third side and a fourth side lying opposite to the third side, wherein the third side is facing the second pipeline and the fourth side is facing away from the second pipeline, wherein the covering element at the third side comprises a third abutment structure for abutting against the second pipeline, wherein the covering element, by interlocking connection with the spacer, has been brought in a covering condition, wherein in said covering condition the spacer and the covering element are facing one another with the second side and the third side, respectively, wherein, as seen in said circumferential direction, the third side partially envelopes the second pipeline, and wherein each tensioning strap as one closed loop is surrounding the first pipeline, the spacer, the second pipeline and the covering element together in said circumferential direction.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE ORIGINAL UNDERLYING AGREEMENT PREVIOUSLY RECORDED AT REEL: 058232 FRAME: 0567. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY INTEREST. Recorded Jan 13, 2022
From: LANKHORST ENGINEERED PRODUCTS B.V.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 058727/0904 →
SECURITY INTEREST Recorded Nov 29, 2021
From: LANKHORST ENGINEERED PRODUCTS B.V.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 058232/0567 →
SECURITY INTEREST Recorded Nov 21, 2021
From: LANKHORST ENGINEERED PRODUCTS B.V.
To: WILMINGTON TRUST, NATIONAL ASSOCIATION, AS ADDITIONAL COLLATERAL AGENT
Reel/Frame 058173/0656 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 22, 2021
From: ALEWIJN, GIJS
To: LANKHORST ENGINEERED PRODUCTS B.V.
Reel/Frame 057563/0171 →
Priority Claims (1)
NL 2022577 · Feb 14, 2019 · national
Continuity (1)
Related Publication 20220120360A1 · Apr 21, 2022