IP Library Granted Patent US 11,421,914
Granted Patent B2
US 11,421,914 · App. 17/434,264 · Granted Aug 23, 2022

Thermal storage system with coupled tanks

Inventors: Xiaobing Liu (Oak Ridge, TN); Ming Qu (West Lafayette, IN); Joseph K. Warner (San Jose, CA); Liang Shi (West Lafayette, IN)
F24H4/04F25B30/02F28D20/0034F28D20/021F28D2020/0082
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,421,914
App. No.
17/434,264
Filed
Aug 26, 2021
Granted
Aug 23, 2022
Kind
B2
Art Unit
3763
USPC
62/79
Abstract

Methods and apparatus are disclosed for high-efficiency thermal storage with a fluid-filled “battery” tank positioned within a fluid-filled “reservoir” tank. Fluid loops couple the tanks to a heat pump and a building. The heat pump can charge the battery tank or deliver thermal energy (cold or heat) to a building, using the reservoir tank or ambient air as a thermal energy source. The battery tank can discharge energy to the building jointly with the heat pump or, at periods of peak electricity usage, with the heat pump switched off. Operating modes allow significant savings in electricity usage and mitigate the “duck curve.” Low duty cycle usage of the reservoir enables efficient underground thermal storage with less digging than conventional geothermal technologies. Additional efficiency is achieved with phase change materials installed inside a tank or in a tank wall, providing temperature regulation. Control methods are disclosed.

Claims (23)

1. A method of operating an apparatus comprising a thermal reservoir, a heat pump, and a thermal battery, the heat pump coupled to receive energy from the thermal reservoir and to provide energy to a building, the thermal battery coupled to receive energy from the heat pump and to provide energy to the building, the thermal battery being further coupled to transfer energy to or from the thermal reservoir, and the method comprising:

(a) determining, for a first time period, that an energy load of the building is less than a capacity of the heat pump;

(b) responsive to operation (a), configuring one or more fluid loops to provide energy from the heat pump to the energy load and to the thermal battery during the first time period;

(c) determining that a second time period is a period of peak electricity usage;

(d) responsive to operation (c), configuring the one or more fluid loops to provide energy from the thermal battery to the energy load during the second time period;

(e) determining, for a third time period, that available energy in the thermal battery is below a threshold; and

(f) responsive to operation (e), configuring the one or more fluid loops to provide energy from the heat pump to the energy load during the third time period.

2. The method of claim 1 , wherein the first, second, and third time periods are distinct time periods during one 24-hour day.

3. The method of claim 2 , wherein the one 24-hour day is a first day, the energy load is a cooling load, and further comprising:

repeating operations (a)-(f) on a second day distinct from the first day, when the energy load is a heating load.

4. The method of claim 1 , wherein operations (a) and (e) are performed during the first and third time periods respectively.

5. The method of claim 1 , wherein operation (d) further comprises configuring the heat pump to be off.

6. The method of claim 1 , wherein operation (f) further comprises configuring the one or more fluid loops to disable energy transfer to or from the thermal battery during the third time period.

7. The method of claim 1 , wherein the energy load is a cooling load or a heating load, the threshold is a first threshold, and the method further comprises:

(g) determining, for a case that the energy load is a cooling load, that an ambient air temperature is above a second threshold, or, for a case that the energy load is a heating load, that an ambient air temperature is below a third threshold; and

(h) responsive to operation (g), configuring the one or more fluid loops to provide energy from the thermal reservoir to the heat pump during the first time period or the third time period.

8. The method of claim 1 , wherein the threshold is a first threshold, and further comprising:

(i) determining, during the first time period, that a charge state of the thermal battery is above a second threshold; and

(j) responsive to operation (i), reconfiguring the one or more fluid loops to disable energy transfer to the thermal battery for a subsequent portion of the first time period.

9. The method of claim 1 , wherein the threshold is a first threshold, and further comprising:

(k) determining, during the second time period, that a charge state of the thermal battery is below a second threshold; and

(l) responsive to operation (k), reconfiguring the one or more fluid loops, for a subsequent portion of the second time period, to disable energy transfer from the thermal battery to the energy load and to enable energy transfer from the heat pump to the energy load.

10. One or more computer-readable media storing instructions which, when executed by one or more hardware processors, cause a system comprising the one or more hardware processors, the heat pump, the thermal battery, and the one or more fluid loops to perform the method of claim 1 .

Assignments (1)
CONFIRMATORY LICENSE Recorded Feb 17, 2022
From: UT-BATTELLE, LLC
To: U. S. DEPARTMENT OF ENERGY
Reel/Frame 059032/0061 →
Continuity (2)
Provisional Application 62819755 · Mar 18, 2019
Related Publication 20220042718A1 · Feb 10, 2022
Cited By (1)
US 12,214,644