IP Library › Granted Patent US 12,289,606
Granted Patent B2
US 12,289,606 · App. 17/437,909 · Granted Apr 29, 2025

Wireless device initiated channel occupancy in unlicensed spectrum

Inventors: Sigen Ye (Whitehouse Station, NJ); Oghenekome Oteri (San Diego, CA); Weidong Yang (San Diego, CA); Wei Zeng (San Diego, CA); Hong He (Cupertino, CA); Yushu Zhang (Beijing, CN); Haitong Sun (Irvine, CA); Huaning Niu (San Jose, CA); Chunhai Yao (Beijing, CN); Dawei Zhang (Saratoga, CA)
Assignee: Apple Inc.
H04W16/14H04W74/0808H04W76/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,289,606
App. No.
17/437,909
Granted
Apr 29, 2025
Kind
B2
Abstract

This disclosure relates to techniques for a wireless device to initiate channel occupancy in unlicensed spectrum in a wireless communication system. The wireless device may establish a wireless link with a cellular base station. The wireless device may determine to perform an uplink transmission to the cellular base station on an unlicensed frequency channel. The wireless device may determine whether the cellular base station has channel occupancy of the unlicensed frequency channel. The wireless device may determine whether to initiate channel occupancy of the unlicensed frequency channel. The decision whether to initiate channel occupancy may be based at least in part on whether the cellular base station has channel occupancy of the unlicensed frequency channel.

Claims (40)

1. A baseband processor configured to perform operations comprising:

determining to perform an uplink transmission to a cellular base station on an unlicensed frequency channel;

determining that the cellular base station has initiated a first channel occupancy of the unlicensed frequency channel;

determining a length of the uplink transmission; and

determining whether to initiate channel occupancy of the unlicensed frequency channel or use the first channel occupancy, comprising:

determining to initiate a new channel occupancy of the unlicensed frequency channel if the length of the uplink transmission would overlap a first idle period at an end of a current first fixed frame period of the cellular base station;

determining to use the first channel occupancy of the unlicensed frequency channel if the length of the uplink transmission would not overlap the first idle period at the end of the current first fixed frame period of the cellular base station; and

performing the uplink transmission to the cellular base station on the unlicensed frequency channel,

wherein the uplink transmission extends at least into a clear channel assessment period for a next fixed frame period of the cellular base station based at least in part on the new channel occupancy being initiated while the cellular base station has already initiated channel occupancy of the unlicensed frequency channel.

2. The baseband processor of claim 1 , the operations further comprising

determining to share the first channel occupancy to perform the uplink transmission to the cellular base station based at least in part on determining that the uplink transmission to the cellular base station can be performed using the first channel occupancy without performing clear channel assessment.

3. The baseband processor of claim 1 , the operations further comprising determining a latency sensitivity of the uplink transmission,

wherein whether to initiate the new channel occupancy of the unlicensed frequency channel or to use the first channel occupancy initiated by the cellular base station is determined further based at least in part on the latency sensitivity of the uplink transmission.

4. The baseband processor of claim 1 , wherein the baseband processor is further configured to perform operations comprising:

determining an energy detection threshold to use to perform clear channel assessment of the unlicensed frequency channel.

5. The baseband processor of claim 1 , wherein a first fixed frame period duration is different from a second fixed frame period duration.

6. A method, comprising:

determining to perform an uplink transmission to a cellular base station on an unlicensed frequency channel;

determining that the cellular base station has initiated a first channel occupancy of the unlicensed frequency channel;

determining a length of the uplink transmission; and

determining whether to initiate channel occupancy of the unlicensed frequency channel or use the first channel occupancy, comprising:

determining to initiate a new channel occupancy of the unlicensed frequency channel if the length of the uplink transmission would overlap a first idle period at an end of a current first fixed frame period of the cellular base station;

determining to use the first channel occupancy of the unlicensed frequency channel if the length of the uplink transmission would not overlap the first idle period at the end of the current first fixed frame period of the cellular base station; and

performing the uplink transmission to the cellular base station on the unlicensed frequency channel,

wherein the uplink transmission extends at least into a clear channel assessment period for a next fixed frame period of the cellular base station based at least in part on the new channel occupancy being initiated while the cellular base station has already initiated channel occupancy of the unlicensed frequency channel.

7. The method of claim 6 , further comprising:

determining to share the first channel occupancy to perform the uplink transmission to the cellular base station based at least in part on determining that the uplink transmission to the cellular base station can be performed using the first channel occupancy without performing clear channel assessment.

8. The method of claim 6 , further comprising:

determining a latency sensitivity of the uplink transmission,

wherein whether to initiate the new channel occupancy of the unlicensed frequency channel or to use the first channel occupancy is determined further based at least in part on the latency sensitivity of the uplink transmission.

9. The method of claim 6 , further comprising:

determining an energy detection threshold to use to perform clear channel assessment of the unlicensed frequency channel.

10. The method of claim 6 , wherein a first fixed frame period duration is different from a second fixed frame period duration.

11. A method, comprising:

initiating, by a cellular base station, a first channel occupancy of an unlicensed frequency channel; and

receiving, from a user equipment (UE), an uplink transmission on the unlicensed frequency channel, wherein:

the uplink transmission is received during a new channel occupancy of the unlicensed frequency channel if a length of the uplink transmission overlaps a first idle period at an end of a current first fixed frame period of the cellular base station; or

the uplink transmission is received during the first channel occupancy of the unlicensed frequency channel if the length of the uplink transmission does not overlap the first idle period at the end of the current first fixed frame period of the cellular base station, wherein the uplink transmission extends at least into a clear channel assessment period for a next fixed frame period of the cellular base station based at least in part on the new channel occupancy being initiated while the cellular base station has already initiated channel occupancy of the unlicensed frequency channel.

12. The method of claim 11 , wherein uplink transmission is received during the first channel occupancy when the uplink transmission to the cellular base station can be performed using the first channel occupancy without performing clear channel assessment.

13. The method of claim 11 , wherein a first fixed frame period duration is different from a second fixed frame period duration.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 28, 2021
From: YE, SIGEN; OTERI, OGHENEKOME; YANG, WEIDONG; ZENG, WEI; HE, HONG; ZHANG, YUSHU; SUN, HAITONG; NIU, HUANING; YAO, CHUNHAI; ZHANG, DAWEI
To: APPLE INC.
Reel/Frame 057954/0842 →
Continuity (1)
Related Publication 20220303781A1 · Sep 22, 2022
References Cited (9)
US 20170231011A1 · Park · 2017 [cited by examiner]
US 20200053571A1 · Tsai · 2020 [cited by examiner]
US 20200245353A1 · Tsai · 2020 [cited by examiner]
CN 110720252A · 2020 [cited by applicant]
WO 2019240512A1 · 2019 [cited by applicant]
WO 2020162804A1 · 2020 [cited by applicant]
WO 2020194274 · 2020 [cited by applicant]
International Search Report for PCT Patent Application No. PCT/CN2020/121123; mailed Jul. 14, 2021. [cited by applicant]
Nokia et al. “On UL enhancements for IIoT/URLLC in unlicensed controlled environment” 3GPP TSG RAN WG1 Meeting #102-e R1-2006247; Aug. 7, 2020. [cited by applicant]