IP Library › Granted Patent US 11,841,389
Granted Patent B2
US 11,841,389 · App. 17/439,019 · Granted Dec 12, 2023

Apparatus for estimating insulation resistance and battery system using the same

Inventors: Jangsoo Ock (Daejeon, KR); Jae Wook Yu (Daejeon, KR)
G01R27/025G01R31/382H01M10/48
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,841,389
App. No.
17/439,019
Granted
Dec 12, 2023
Kind
B2
Abstract

An apparatus and battery system for estimating insulation resistance including an insulation resistance measurement circuit connected to a first electrode of a battery, a first switch connected to the first resistor, a second resistor connected to the first switch, a third resistor connected to the second resistor and a second electrode of the battery, and a second switch connected between a first contact point between the first switch and the second resistor and a chassis ground, a voltage measurement part measuring a voltage of a second contact point between the second resistor and the third resistor, and a controller controlling the first and second switches and calculating an insulation resistance value based on the voltage measured at the second contact point the first and second switches are ON, and the voltage measured at the second contact point while the first switch is OFF and the second switch is ON.

Claims (30)

1. An apparatus for estimating insulation resistance, comprising:

an insulation resistance measurement circuit that includes a first resistor, a first switch, a second resistor, a third resistor, and a second switch, wherein the first resistor is between a first electrode of a battery and the first switch, the first switch is between the first resistor and the second resistor, the second resistor is between the first switch and the third resistor, the third resistor is between the second resistor and the second electrode of the battery, and the second switch is between a first contact point and a chassis ground and is configured to direct electrical current from the battery towards the chassis ground and away from the second resistor when the second switch is in an ON state, wherein the first contact point is between the first switch and the second resistor;

a voltage sensor configured to measure a voltage of a second contact point between the second resistor and the third resistor; and

a controller configured to:

control respective states of the first switch and the second switch; and

calculate the insulation resistance value based on (i) the voltage measured at the second contact point while the first switch and the second switch are in the ON state and (ii) the voltage measured at the second contact point while the first switch is in an OFF state and the second switch is in the ON state.

2. The apparatus for estimating the insulation resistance of claim 1 , wherein

the controller is configured to diagnose whether the insulation resistance measurement circuit operates normally based on the voltage measured at the second contact point and a resistance ratio of the first, second and third resistors while the first switch is in the ON state and the second switch is in an OFF state.

3. The apparatus for estimating the insulation resistance of claim 1 , wherein

the controller is configured to electrically disconnect the insulation resistance measurement circuit by turning the first switch and the second switch to the OFF state.

4. The apparatus for estimating the insulation resistance of claim 1 , wherein

the insulation resistance measurement circuit further includes a diagnosis resistor connected between the first electrode of the battery and the second end of the second switch.

5. The apparatus for estimating the insulation resistance of claim 4 , wherein

the controller is configured to diagnose normal operation of the second switch based on (i) the voltage measured at the second contact point when the second switch is switched between the OFF state and the ON state while the first switch is in the ON state, (ii) resistance values of the first, second and third resistors, and (iii) a resistance value of the diagnosis resistor.

6. The apparatus for estimating the insulation resistance of claim 1 , wherein,

the controller is configured to calculate a first insulation resistance formed between the first electrode of the battery and the chassis ground and a second insulation resistance formed between the second electrode of the battery and the chassis ground, and calculates a parallel resistance value of the first insulation resistance and the second insulation resistance to obtain the insulation resistance value.

7. A battery system including an apparatus for estimating insulation resistance, comprising:

a battery including a plurality of battery cells that are connected in series; and

an insulation resistance measurement circuit that includes a first resistor, a first switch, a second resistor, a third resistor, and a second switch, wherein the first resistor is between a first electrode of a battery and the first switch, the first switch is between the first resistor and the second resistor, the second resistor is between the first switch and the third resistor, the third resistor is between the second resistor and the second electrode of the battery, and the second switch is between a first contact point and a chassis ground and is configured to direct electrical current from the battery towards the chassis ground and away from the second resistor when the second switch is in an ON state, wherein the first contact point is between the first switch and the second resistor, and wherein the insulation resistance measurement circuit is configured to measure a voltage of a second contact between the second resistor and the third resistor,

wherein the apparatus for estimating the insulation resistance is configured to calculate an insulation resistance value, based on (i) the voltage measured at the second contact point while the first switch and the second switch are in the ON state and (ii) the voltage measured at the second contact point while the first switch is in an OFF state and the second switch is in the ON state.

8. The battery system of claim 7 , wherein

the apparatus for estimating the insulation resistance is configured to diagnose whether the apparatus for estimating the insulation resistance operates normally based on the voltage measured at the second contact point and a resistance ratio of the first, second and third resistors while the first switch is in the ON state and the second switch is in an OFF state.

9. The battery system of claim 7 , wherein

the apparatus for estimating the insulation resistance is configured to electrically disconnect the apparatus for estimating the insulation resistance by turning the first switch and the second switch to the OFF state.

10. The battery system of claim 7 , wherein

the apparatus for estimating the insulation resistance further includes a diagnosis resistor connected between the first electrode of the battery and the second end of the second switch.

11. The battery system of claim 10 , wherein

the apparatus for estimating the insulation resistance is configured to diagnose normal operation of the second switch based on (i) the voltage measured at the second contact point when the second switch is switched between the OFF state and the ON state while the first switch is in the ON state, (ii) resistance values of the first, second and third resistors, and (iii) a resistance value of the diagnosis resistor.

12. The battery system of claim 7 , wherein,

the apparatus for estimating the insulation resistance is configured to calculate a first insulation resistance formed between the first electrode of the battery and the chassis ground and a second insulation resistance formed between the second electrode of the battery and the chassis ground, and calculates a parallel resistance value of the first insulation resistance and the second insulation resistance to obtain the insulation resistance value.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 15, 2021
From: OCK, JANGSOO; YU, JAE WOOK
To: LG ENERGY SOLUTION, LTD.
Reel/Frame 057484/0714 →
Priority Claims (1)
KR 10-2019-0147977 · Nov 18, 2019 · national
Continuity (1)
Related Publication 20220146561A1 · May 12, 2022
Cited By (1)
US 12,210,046