IP Library › Granted Patent US 12,219,652
Granted Patent B2
US 12,219,652 · App. 17/514,749 · Granted Feb 4, 2025

Method and apparatus for controlling secondary cell group in a multi-rat dual connectivity network

Inventors: Jajohn Mathew Mattam (Bangalore, IN); Vinay Kumar Shrivastava (Bangalore, IN); Anshuman Nigam (Bangalore, IN); Arijit Sen (Bangalore, IN); Fasil Abdul Latheef (Bangalore, IN); Neha Sharma (Bangalore, IN)
Assignee: Samsung Electronics Co., Ltd.
H04W76/38H04W76/19H04W76/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,219,652
App. No.
17/514,749
Granted
Feb 4, 2025
Kind
B2
Abstract

The present disclosure relates to a communication method and system for converging a 5th-Generation (5G) communication system for supporting higher data rates beyond a 4th-Generation (4G) system with a technology for Internet of Things (IoT). The present disclosure may be applied to intelligent services based on the 5G communication technology and the IoT-related technology, such as smart home, smart building, smart city, smart car, connected car, health care, digital education, smart retail, security and safety services. The disclosure relates to a method and an apparatus to trigger deactivation and re-activation of a secondary cell group (SCG) in a multi-radio access Technology (RAT) dual connectivity (MR-DC) network.

Claims (66)

1. A method performed by a user equipment (UE) for controlling a secondary cell group (SCG) in a multi-radio access technology (multi-RAT) dual connectivity (MR-DC) network, the method comprising:

detecting that a connected mode-discontinuous reception (C-DRX) counter is configured for an automatic deactivation of the SCG;

detecting an activation of the SCG;

monitoring C-DRX cycles for transmitting or receiving of data;

determining whether the data is transmitted or received for a configured number of DRX cycles in the C-DRX counter based on the monitoring; and

deactivating the SCG in case that the data is not transmitted or received for the configured number of DRX cycles in the C-DRX counter.

2. The method of claim 1 , further comprising:

detecting at least one of a data inactivity timer configured for a master cell group (MCG) or a UE specific timer;

starting at least one of the data inactivity timer configured for the MCG to use for the automatic deactivation of the SCG, or the UE specific timer to use for the automatic deactivation of the SCG;

detecting whether at least one of the data inactivity timer configured for the MCG, or the UE specific timer is expired; and

deactivating the SCG based on the expiry of at least one of the data inactivity timer configured for the MCG, or the UE specific timer.

3. The method of claim 2 , further comprising:

monitoring whether there is a data activity until the expiry of at least one of the data inactivity timer or the UE specific timer.

4. The method of claim 3 , further comprising:

restarting at least one of the data inactivity timer or the UE specific timer in response to determining that there is data activity at the UE before expiry of at least one of the data inactivity timer or the UE specific timer; and

monitoring whether there is a data activity at the UE until expiry of at least one of the restarted data inactivity timer or the restarted UE specific timer.

5. The method of claim 1 , wherein deactivating the SCG comprises:

delivering, by a medium access control (MAC) entity of the UE, an indication to a radio resource control (RRC) entity of the UE for automatic deactivation of the SCG by the UE; and

deactivating, by the RRC entity of the UE, the SCG without releasing an RRC connection between the UE and a network node.

6. The method of claim 1 , further comprising:

detecting at least one of data pending in packet data convergence protocol (PDCP) is greater than a threshold, data received in downlink (DL) from a master cell group (MCG) is greater than a threshold, any data pending to transfer on SCG bearer, or an MCG failure; and

reactivating the deactivated SCG.

7. The method of claim 1 , wherein deactivating the SCG comprises:

detecting whether downlink (DL) data is less than a DL data threshold;

detecting uplink (UL) data is less than a UL data threshold in response to determining that the DL data is less than the DL data threshold;

preparing early deactivation of the SCG by stop forwarding the DL data and the UL data to the SCG in response to detecting that the UL data is less than the UL data threshold; and

deactivating the SCG.

8. The method of claim 7 , further comprising:

detecting at least one of data pending in packet data convergence protocol (PDCP) is greater than a threshold, data received from a master cell group (MCG) is greater than a threshold, any data pending to transfer on SCG bearer, data, or an MCG failure; and

reactivating the deactivated SCG.

9. The method of claim 1 , further comprising reactivating the deactivated SCG in case that a battery level is above a threshold battery power.

10. The method of claim 1 , further comprising reactivating the deactivated SCG in case that a temperature level is below a threshold temperature.

11. A user equipment (UE) for controlling a secondary cell group (SCG) in a multi-radio access technology (multi-RAT) dual connectivity (MR-DC) network, the UE comprising:

a transceiver; and

at least one processor coupled with the transceiver and configured to:

detect that a connected mode-discontinuous reception (C-DRX) counter is configured for an automatic deactivation of the SCG,

detect an activation of the SCG,

monitor C-DRX cycles for transmitting or receiving of data,

determine whether the data is transmitted or received for a configured number of DRX cycles in the C-DRX counter based on the monitoring, and

deactivate the SCG in case that the data is not transmitted or received for the configured number of DRX cycles in the C-DRX counter.

12. The UE of claim 11 , wherein the at least one processor is further configured to:

detect at least one of a data inactivity timer configured for a master cell group (MCG) or a UE specific timer,

start at least one of the data inactivity timer configured for the MCG to use for the automatic deactivation of the SCG, or the UE specific timer to use for the automatic deactivation of the SCG,

detect whether at least one of the data inactivity timer configured for the MCG, or the UE specific timer is expired, and

deactivate the SCG based on the expiry of at least one of the data inactivity timer configured for the MCG, or the UE specific timer.

13. The UE of claim 12 , wherein the at least one processor is further configured to:

monitor whether there is a data activity until the expiry of at least one of the restarted data inactivity timer or the UE specific timer.

14. The UE of claim 13 , wherein the at least one processor is further configured to:

restart at least one of the data inactivity timer or the UE specific timer in response to determining that there is data activity at the UE before expiry of at least one of the data inactivity timer or the UE specific timer, and

monitor whether there is a data activity at the UE until expiry of at least one of the restarted data inactivity timer or the restarted UE specific timer.

15. The UE of claim 11 , wherein, to deactivate the SCG, the at least one processor is configured to:

deliver, by a medium access control (MAC) entity of the UE, an indication to a radio resource control (RRC) entity of the UE for automatic deactivation of the SCG by the UE, and

deactivate, by the RRC entity of the UE, the SCG without releasing an RRC connection between the UE and a network node.

16. The UE of claim 11 , the at least one processor is further configured to:

detect at least one of data pending in packet data convergence protocol (PDCP) is greater than a threshold, data received in downlink (DL) from a master cell group (MCG) is greater than a threshold, any data pending to transfer on SCG bearer, or an MCG failure, and

reactivate the deactivated SCG.

17. The UE of claim 11 , wherein, to deactivate the SCG, the at least one processor is further configured to:

detect whether downlink (DL) data is less than a DL data threshold,

detect uplink (UL) data is less than a UL data threshold in response to determining that the DL data is less than the DL data threshold,

prepare early deactivation of the SCG by stop forwarding the DL data and the UL data to the SCG in response to detecting that the UL data is less than the UL data threshold, and

deactivate the SCG.

18. The UE of claim 17 , wherein the at least one processor is further configured to:

detect at least one of data pending in packet data convergence protocol (PDCP) is greater than a threshold, data received from a master cell group (MCG) is greater than a threshold, any data pending to transfer on SCG bearer, data, or an MCG failure, and

reactivate the deactivated SCG.

19. The UE of claim 11 , wherein the at least one processor is further configured to reactivate the deactivated SCG in case that a battery level is above a threshold battery power.

20. The UE of claim 11 , wherein the at least one processor is further configured to reactivate the deactivated SCG in case that a temperature level is below a threshold temperature.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 29, 2021
From: MATTAM, JAJOHN MATHEW; SHRIVASTAVA, VINAY KUMAR; NIGAM, ANSHUMAN; SEN, ARIJIT; LATHEEF, FASIL ABDUL; SHARMA, NEHA
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 057966/0177 →
Priority Claims (3)
IN 202041046102 · Oct 22, 2020 · national
IN 2020 41046102 · Sep 27, 2021 · national
IN 202142043978 · Sep 28, 2021 · national
Continuity (2)
Continuation PCTKR2021014933 · Oct 22, 2021
Related Publication 20220132625A1 · Apr 28, 2022
References Cited (27)
US 10511981B2 · Lee et al. · 2019 [cited by applicant]
US 11310852B2 · Hayashi · 2022 [cited by applicant]
US 11546968B2 · Zhang · 2023 [cited by examiner]
US 20150092707A1 · Kwon · 2015 [cited by applicant]
US 20170127473A1 · Virtej · 2017 [cited by examiner]
US 20190045564A1 · Hayashi · 2019 [cited by applicant]
US 20220159483A1 · Lee et al. · 2022 [cited by applicant]
US 20220312417A1 · Venkata et al. · 2022 [cited by applicant]
US 20230128847A1 · Purkayastha · 2023 [cited by examiner]
US 20230276353A1 · Cheng · 2023 [cited by examiner]
US 20230397297A1 · Zhang · 2023 [cited by examiner]
EP 3866557A1 · 2021 [cited by applicant]
KR 102101517B1 · 2020 [cited by applicant]
KR 1020200103234A · 2020 [cited by applicant]
WO 2020075721A1 · 2020 [cited by applicant]
WO 2020190188A1 · 2020 [cited by applicant]
LG Electronics Inc, DatalnactivityTimer in NR, R2-1815188, 3GPP TSG-RAN WG2 Meeting #103bis, Chengdu, China, Sep. 28, 2018. [cited by applicant]
Extended European Search Report dated Feb. 29, 2024, issued in European Patent Application No. 21883346.5. [cited by applicant]
Vivo, Activation of a deactivated SCG, 3GPP TSG-RAN WG2 Meeting #113bis electronic, R2-2102873, Apr. 12-Apr. 20, 2021. [cited by applicant]
Lenovo, Discussion on SCG activation, 3GPP TSG-RAN WG2 Meeting #113bis-e, R2-2103399, Apr. 12-Apr. 20, 2021. [cited by applicant]
LG Electronics Inc., Acrivation and Deactivation on SCG, 3GPP TSG-RAN WG2 Meeting #113Bis-e, R2-2103570, Apr. 12-Apr. 20, 2021. [cited by applicant]
Qualcomm Incorporated, Activation of deactivated SCG, 3GPP TSG-RAN WG2 Meeting #113-bis-e, R2-2103895, Apr. 12-Apr. 20, 2021. [cited by applicant]
Huawei, SCG activation, 3GPP TSG-RAN WG2 Meeting #113b-e, R2-2103979, Apr. 12-Apr. 20, 2021. [cited by applicant]
3GPP; TSG RAN; Evolved Universal Terrestrial Radio Access (E-UTRA) and NR; Multi-connectivity; Stage 2 (Release 16), 3GPP TS 37.340 V16.3.0, Oct. 2, 2020. [cited by applicant]
International Search Report dated Jan. 20, 2022, issued in International Patent Application No. PCT/KR2021/014933. [cited by applicant]
Indian Office Action dated Mar. 3, 2023, issued in Indian Patent Application No. 202142043978. [cited by applicant]
Indian Office Action dated Jan. 16, 2023, issued in Indian Patent Application No. 202041046102. [cited by applicant]