IP Library Granted Patent US 11,884,307
Granted Patent B2
US 11,884,307 · App. 17/588,233 · Granted Jan 30, 2024

Overhead transport and route management system

Inventor: J. Michael Meissner (Hinsdale, IL)
Assignee: EAGLERAIL CONTAINER LOGISTICS INC.
B61B3/00B60L13/006B61B3/02B65G63/004Y02T30/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,884,307
App. No.
17/588,233
Granted
Jan 30, 2024
Kind
B2
Abstract

An overhead transport system includes a suspended railway and a motorized carrier configured to travel along the suspended railway. The motorized carrier includes a motorized trolley configured to move the motorized carrier along the suspended railway, chassis/beam configured to carry an object below the motorized trolley, and a bumper and deflection system configured to prevent the object from contacting another object.

Claims (39)

1. An overhead transport and route management system comprising:

a suspended railway extending in the longitudinal direction;

a first motorized carrier configured to travel along said suspended railway carrying a first container wherein said first motorized carrier comprises a bumper and deflection system configured to prevent said first container from contacting a second container; and

a second motorized carrier configured to travel along said suspended railway carrying said second container.

2. The overhead transport and route management system of claim 1 , wherein said suspended railway comprises:

an at least one track switch configured to communicate directly with said first motorized carrier to selectively direct said first motorized carrier to different portions of said suspended railway.

3. The overhead transport and route management system of claim 1 , wherein said suspended railway is multi-tiered and multi-tracked.

4. The overhead transport and route management system of claim 1 wherein said suspended railway further comprises:

an at least one electric power pick-up point.

5. An overhead transport and route management system comprising:

a suspended railway extending in the longitudinal direction;

a first motorized carrier configured to travel along said suspended railway carrying a first container;

a second motorized carrier configured to travel along said suspended railway carrying a second container; and

a remote control system configured to synchronize operation of said first motorized carrier and said second motorized carrier.

6. The overhead transport and route management system of claim 5 , wherein an at least one track switch communicates wirelessly with said remote control system.

7. The overhead transport and route management system of claim 5 , wherein said remote control system is configured to adjust the maximum speed of said first motorized carrier.

8. The overhead transport and route management system of claim 5 , wherein said remote control system is configured to adjust the minimal allowable distance between said first motorized carrier and said second motorized carrier.

9. The overhead transport and route management system of claim 5 , wherein said remote control system is configured to monitor conditions of said first container.

10. The overhead transport and route management system of claim 9 , wherein said remote control system is configured to adjust the maximum speed of said first motorized carrier based on said conditions of said first container.

11. The overhead transport and route management system of claim 9 , wherein said remote control system is configured to adjust the minimum allowable distance between said first motorized carrier and said second motorized carrier based on said conditions of said first container.

12. The overhead transport and route management system of claim 9 , wherein said conditions of said first container are used to prioritize transport and delivery of said first container over said second container.

13. An overhead transport and route management system comprising:

a suspended railway extending in the longitudinal direction;

a first motorized carrier configured to travel along said suspended railway carrying a first container; and

a second motorized carrier configured to travel along said suspended railway carrying a second container,

wherein said first motorized carrier includes an electric motor with an internal braking mechanism capable of providing regenerative power.

14. The overhead transport and route management system of claim 13 wherein said suspended railway further comprises:

at least one electric power pick-up point.

15. The overhead transport and route management system of claim 13 wherein said first motorized carrier comprises:

a first motorized trolley configured to move said first motorized carrier along said suspended railway, wherein said electric motor is configured to receive power from and deliver power to an a least one electric power pick-up point.

16. The overhead transport and route management system of claim 13 , wherein said suspended railway is multi-tiered and multi-tracked.

17. An overhead transport and route management system comprising:

a suspended railway extending in the longitudinal direction;

a first motorized carrier configured to travel along said suspended railway carrying a first container; and

a second motorized carrier configured to travel along said suspended railway carrying a second container,

wherein said first motorized carrier comprises at least one spatial sensor for providing information regarding location and movement of said first motorized carrier to a remote control system.

18. The overhead transport and route management system of claim 17 wherein said first motorized carrier comprises an on-board control system configured to control acceleration and deceleration of said first motorized carrier and communicate spatial information detected by said at least one spatial sensor to said remote control system.

19. The overhead transport and route management system of claim 17 , wherein said suspended railway is multi-tiered and multi-tracked.

20. The overhead transport and route management system of claim 17 , wherein said suspended railway comprises an at least one track switch configured to communicate directly with said first motorized carrier to selectively direct said first motorized carrier to different portions of said suspended railway.

Assignments (3)
CORPORATE CONVERSION Recorded Oct 23, 2024
From: EAGLERAIL CONTAINER LOGISTICS INC.
To: EAGLERAIL CONTAINER LOGISTICS LLC
Reel/Frame 069230/0934 →
CORPORATE CONVERSION Recorded Jun 23, 2022
From: EAGLERAIL CONTAINER LOGISTICS, LLC
To: EAGLERAIL CONTAINER LOGISTICS INC.
Reel/Frame 060438/0387 →
NUNC PRO TUNC ASSIGNMENT Recorded May 19, 2022
From: MEISSNER, J. MICHAEL
To: EAGLERAIL CONTAINER LOGISTICS, LLC
Reel/Frame 060260/0451 →
Continuity (7)
Continuation 16502867 · Jul 3, 2019
Continuation 15335422 · Oct 26, 2016
Provisional Application 62337272 · May 16, 2016
Provisional Application 62337276 · May 16, 2016
Provisional Application 62249086 · Oct 30, 2015
Provisional Application 62246535 · Oct 26, 2015
Related Publication 20220219738A1 · Jul 14, 2022
Cited By (2)
US 12,428,040 US 12,459,787