IP Library Granted Patent US 11,859,464
Granted Patent B2
US 11,859,464 · App. 17/601,703 · Granted Jan 2, 2024

System and method for offline cementing in batch drilling

Inventors: Ray Dicksang Pang (Missouri City, TX); Phu Duc Sy Dong (Houston, TX); Moises Nava (Houston, TX); Russell Hamilton (Houston, TX)
Assignee: SPM Oil & Gas PC LLC
E21B33/14E21B17/02E21B33/04E21B34/06E21B2200/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,859,464
App. No.
17/601,703
Granted
Jan 2, 2024
Kind
B2
Abstract

What is described is a system and method for offline cementing of a casing hanger and a casing placed in a wellbore of a well. The system includes an isolation sleeve/cementing spool that is configured for engaging the casing hanger, where the isolation sleeve has at least one access port in fluid communication with an annulus formed by the casing in the wellbore. A dummy hanger is housed within the isolation sleeve and is configured for coupling with the casing hanger and is further in fluid communication with the casing. A valve is configured for coupling to the isolation sleeve and is configured to be in fluid communication with the dummy hanger. A quick connector is coupled to the valve and enables quick coupling of a cementing head.

Claims (31)

1. A system for offline cementing of a casing hanger and a casing placed in a wellbore of a well comprising:

an isolation sleeve having at least one access port in fluid communication with an annulus formed by the casing in the wellbore;

a dummy hanger housed within the isolation sleeve and configured for coupling with the casing hanger and in fluid communication with the casing;

a valve coupled to the isolation sleeve and in fluid communication with the dummy hanger; and

a quick connector coupled to the valve and configured to enable quick coupling of a cementing head.

2. The system of claim 1 , wherein the valve comprises a ball valve.

3. The system of claim 1 , wherein the isolation sleeve comprises a cement inlet port and a cement outlet port.

4. The system of claim 1 , wherein the isolation sleeve comprises a cement inlet port with a shut-off valve and a cement outlet port with a shut-off valve.

5. The system of claim 1 , wherein the isolation sleeve comprises a cement inlet port with a wing valve and a cement outlet port with a wing valve.

6. The system of claim 1 , further comprising a well casing support shoulder disposed over the well and configured for supporting the casing hanger.

7. A system for offline cementing of a casing hanger and a casing placed in a wellbore of a well comprising:

an isolation sleeve having at least one access port in fluid communication with an annulus formed by the casing in the wellbore; and

a dummy hanger housed within the isolation sleeve and configured for coupling with the casing hanger and in fluid communication with the casing.

8. The system of claim 7 , further comprising:

a valve coupled to the isolation sleeve and in fluid communication with the dummy hanger; and

a quick connector coupled to the valve and configured to enable quick coupling of a cementing head.

9. The system of claim 7 , wherein the valve comprises a ball valve.

10. The system of claim 7 , wherein the isolation sleeve comprises a cement inlet port and a cement outlet port.

11. The system of claim 7 , wherein the isolation sleeve comprises a cement inlet port with a shut-off valve and a cement outlet port with a shut-off valve.

12. The system of claim 7 , wherein the isolation sleeve comprises a cement inlet port with a wing valve and a cement outlet port with a wing valve.

13. The system of claim 7 , further comprising a well casing support shoulder disposed over the well and configured for supporting the casing hanger.

14. A method for offline cementing of a casing placed in a well comprising:

securing an isolation sleeve to a casing support shoulder disposed over the well, the isolation sleeve configured for housing a dummy hanger which is configured for coupling with a casing hanger disposed over the well and in fluid communication with the casing, the isolation sleeve having at least one access port in fluid communication with an annulus formed by the casing in the well;

coupling a ball valve to the isolation sleeve;

proceeding with and completing the cementing process;

closing the ball valve; and

nippling down a blowout preventer disposed over the well.

15. The method of claim 14 , further comprising:

removing the isolation sleeve;

installing an annular primary seal about the casing hanger; and

engaging an annular lock ring about the primary seal.

Assignments (3)
CHANGE OF NAME Recorded Feb 27, 2023
From: SEABOARD INTERNATIONAL LLC
To: SPM OIL & GAS PC LLC
Reel/Frame 062877/0974 →
CHANGE OF NAME Recorded Feb 17, 2023
From: SEABOARD INTERNATIONAL INC.
To: SEABOARD INTERNATIONAL LLC
Reel/Frame 062797/0340 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 15, 2023
From: PANG, RAY DICKSANG; DONG, PHU DUC SY; NAVA, MOISES; HAMILTON, RUSSELL
To: SEABORD INTERNATIONAL, INC.
Reel/Frame 062709/0488 →
Continuity (2)
Provisional Application 62830163 · Apr 5, 2019
Related Publication 20220213759A1 · Jul 7, 2022