IP Library › Granted Patent US 11,779,952
Granted Patent B2
US 11,779,952 · App. 17/601,974 · Granted Oct 10, 2023

Application device and corresponding application method

Inventors: Bernd Locher (Knittlingen, DE); Sebastian Gries (Heilbronn, DE)
Assignee: Dürr Systems AG
B05C5/0212B05C11/1013B05C11/1036H01M10/653H01M50/202H01M50/293
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,779,952
App. No.
17/601,974
Granted
Oct 10, 2023
Kind
B2
Abstract

The disclosure relates to an application device for applying an application agent (e.g. heat-conducting paste) into a cavity, in particular in a battery module of an electric battery. The application device according to the disclosure comprises a nozzle for dispensing the application agent through the nozzle and a first pressure sensor for measuring a first pressure reading (p A , p B ) of the application agent upstream of the nozzle. The disclosure additionally provides a second pressure sensor for measuring a second pressure reading (p D ) of the coating agent downstream of the first pressure sensor, in particular in the nozzle. Furthermore, the disclosure comprises a corresponding application method.

Claims (40)

1. An application device for application of an application agent, said application device comprising:

a) a nozzle for dispensing the application agent through the nozzle and

b) a first pressure sensor for measuring a first pressure reading of the application agent upstream of the nozzle,

c) further comprising a second pressure sensor for measuring a second pressure reading of the application agent downstream of the first pressure sensor,

d) at least one first metering device for conveying the application agent with an adjustable first delivery flow rate to the nozzle, and

e) a control unit, wherein the control unit is connected on an input side to the two pressure sensors and receives the first pressure reading and the second pressure reading, while the control unit is connected on an output side to the at least one first metering device and wherein the control unit is adapted to set the delivery flow rate of the at least one first metering device as a function of the first pressure reading and the second pressure reading.

2. The application device according to claim 1 , wherein the application device is adapted for the application of a heat-conducting paste.

3. The application device according to claim 1 , wherein the application agent is in a battery module of an electric battery.

4. The application device according to claim 1 , further comprising a first pump for conveying the application agent to the at least one first metering device.

5. The application device according to claim 1 , wherein

a) the application agent comprises a first component and a second component,

b) the at least one first metering device meters the first component of the application agent with the adjustable first delivery flow rate,

c) a second metering device meters the second component of the application agent with a specific adjustable second delivery flow rate,

d) a mixer mixes the two components to form the application agent, the mixer being connected on an inlet side to the at least one first metering device and the second metering device and on an outlet side to the nozzle.

6. The application device according to claim 5 , wherein a second pump is provided for conveying the application agent to the second metering device.

7. The application device according to claim 5 , wherein the second pressure sensor measures the second pressure reading at the mixer.

8. The application device according to claim 7 , wherein the second pressure sensor measures the second pressure reading in the mixer.

9. The application device according to claim 7 , wherein the second pressure sensor measures the second pressure reading in a first inlet of the mixer.

10. The application device according to claim 7 , wherein the second pressure sensor measures the second pressure reading in a second inlet of the mixer.

11. The application device according to claim 7 , wherein the second pressure sensor measures the second pressure reading immediately downstream of the mixer.

12. The application device according to claim 5 , wherein

a) the first pressure sensor measures the first pressure reading at the at least one first metering device,

b) a third pressure sensor measures a third pressure reading at the second metering device, and

c) the control unit is adapted to adjust the delivery flow rates of the at least one first metering device and the second metering device as a function of the three pressure readings.

13. The application device according to claim 1 , wherein

a) the control unit is adapted to determine a pressure difference between the following pressure readings:

a1) the second pressure reading and

a2) the first pressure reading, and

b) the control unit is adapted to adjust the delivery flow rate of the at least one first metering device as a function of the pressure difference between the second pressure reading and the first pressure reading.

14. The application device according to claim 13 , wherein the control unit is adapted to reduce the delivery flow rate of the at least one first metering device as the pressure difference increases.

15. The application device according to claim 14 , wherein the control unit is adapted to reduce the delivery flow rate of the at least one first metering device in a plurality of steps as the pressure difference increases.

16. The application device according to claim 13 , wherein the control unit is adapted to compare the pressure difference with a predetermined maximum value and stops the application agent if the pressure difference exceeds the predetermined maximum value.

17. The application device according to claim 1 , wherein

a) the first pressure sensor measures the first pressure reading in the at least one first metering device,

b) the second pressure sensor measures the second pressure reading in the nozzle,

c) a third pressure sensor measures a third pressure reading in a second metering device,

d) a fourth pressure sensor measures a fourth pressure reading in a first inlet of the mixer,

e) a fifth pressure sensor measures a fifth pressure reading in a second inlet of the mixer, and

f) the control unit is adapted to adjust the delivery flow rates of the at least one first metering device and the second metering device as a function of the first pressure reading, the second pressure reading, the third pressure reading, the fourth pressure reading, and the fifth pressure reading.

18. The application device according to claim 17 , wherein the control unit is adapted to adjust the delivery flow rates of the at least one first metering device and the second metering device as a function of a pressure difference between a pressure reading measured upstream and a pressure reading measured downstream.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 2, 2021
From: LOCHER, BERND; GRIES, SEBASTIAN
To: DÜRR SYSTEMS AG
Reel/Frame 057989/0182 →
Priority Claims (1)
DE 10 2019 109 208.6 · Apr 8, 2019 · national
Continuity (1)
Related Publication 20220203397A1 · Jun 30, 2022