IP Library › Granted Patent US 11,649,610
Granted Patent B2
US 11,649,610 · App. 17/637,378 · Granted May 16, 2023

Hydraulic system of construction machine

Inventors: Akihiro Kondo (Kobe, JP); Naoki Hata (Kobe, JP); Nobuyuki Kinoshita (Kobe, JP); Kazuya Iwabe (Kobe, JP)
Assignee: KAWASAKI JUKOGYO KABUSHIKI KAISHA
E02F9/2228E02F9/2267E02F9/2285E02F9/2292F15B13/044E02F9/2296F15B2211/63
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,649,610
App. No.
17/637,378
Granted
May 16, 2023
Kind
B2
Abstract

A hydraulic system of a construction machine includes: control valves interposed between a main pump and hydraulic actuators; and first solenoid proportional valves connected to pilot ports of the control valves. The hydraulic system further includes: an unloading valve including a pilot port; and a second solenoid proportional valve connected to the pilot port of the unloading valve by a secondary pressure line and connected to an auxiliary pump by a primary pressure line. A switching valve including a pilot port connected to the secondary pressure line by a pilot line is interposed between the auxiliary pump and the first solenoid proportional valves.

Claims (63)

1. A hydraulic system of a construction machine, comprising:

control valves interposed between a main pump and hydraulic actuators, each control valve including pilot ports;

first solenoid proportional valves connected to the pilot ports of the control valves;

operation devices to move the control valves, each operation device outputting an electrical signal corresponding to an operating amount of the operation device;

a controller that controls the first solenoid proportional valves based on the electrical signals outputted from the operation devices;

an unloading valve provided on a line extending to a tank, the line being branched off from a supply line that connects between the main pump and the control valves, the unloading valve including a pilot port and being a valve whose opening area is at a maximum when none of the operation devices are operated;

a second solenoid proportional valve connected to the pilot port of the unloading valve by a secondary pressure line and connected to an auxiliary pump by a primary pressure line; and

a switching valve interposed between the auxiliary pump and the first solenoid proportional valves, the switching valve including a pilot port connected to the secondary pressure line by a pilot line, the switching valve switching between a closed position and an open position in accordance with a pilot pressure led to the pilot port.

2. The hydraulic system of a construction machine according to claim 1 , wherein

the opening area of the unloading valve decreases in accordance with increase in a pilot pressure led to the pilot port of the unloading valve, and

the switching valve switches from the closed position to the open position when the pilot pressure led to the pilot port of the switching valve becomes higher than or equal to a setting value.

3. The hydraulic system of a construction machine according to claim 2 , further comprising:

a selector that receives a selection of operation lock, which is a selection to invalidate operations performed on the operation devices, or receives a selection of operation lock release, which is a selection to validate operations performed on the operation devices, wherein

while the selector is receiving the selection of operation lock, the controller controls the second solenoid proportional valve, such that a secondary pressure of the second solenoid proportional valve is lower than the setting value, and

while the selector is receiving the selection of operation lock release, the controller controls the second solenoid proportional valve, such that the secondary pressure of the second solenoid proportional valve is higher than the setting value.

4. The hydraulic system of a construction machine according to claim 3 , wherein

the setting value is a first setting value,

the opening area of the unloading valve is kept at the maximum until the pilot pressure led to the pilot port of the unloading valve becomes a second setting value, and

the first setting value is lower than or equal to the second setting value.

5. The hydraulic system of a construction machine according to claim 4 , wherein

the main pump includes a plurality of main pumps,

the unloading valve includes a plurality of unloading valves corresponding to the respective main pumps,

the second solenoid proportional valve includes a plurality of second solenoid proportional valves corresponding to the respective unloading valves, and

the pilot line includes:

a bridging line that connects secondary pressure lines to each other, the secondary pressure lines extending from the respective second solenoid proportional valves;

a high pressure selective valve provided on the bridging line; and

an output line that connects between an output port of the high pressure selective valve and the pilot port of the switching valve.

6. The hydraulic system of a construction machine according to claim 3 , wherein

the main pump includes a plurality of main pumps,

the unloading valve includes a plurality of unloading valves corresponding to the respective main pumps,

the second solenoid proportional valve includes a plurality of second solenoid proportional valves corresponding to the respective unloading valves, and

the pilot line includes:

a bridging line that connects secondary pressure lines to each other, the secondary pressure lines extending from the respective second solenoid proportional valves;

a high pressure selective valve provided on the bridging line; and

an output line that connects between an output port of the high pressure selective valve and the pilot port of the switching valve.

7. The hydraulic system of a construction machine according to claim 2 , wherein

the setting value is a first setting value,

the opening area of the unloading valve is kept at the maximum until the pilot pressure led to the pilot port of the unloading valve becomes a second setting value, and

the first setting value is lower than or equal to the second setting value.

8. The hydraulic system of a construction machine according to claim 7 , wherein

the main pump includes a plurality of main pumps,

the unloading valve includes a plurality of unloading valves corresponding to the respective main pumps,

the second solenoid proportional valve includes a plurality of second solenoid proportional valves corresponding to the respective unloading valves, and

the pilot line includes:

a bridging line that connects secondary pressure lines to each other, the secondary pressure lines extending from the respective second solenoid proportional valves;

a high pressure selective valve provided on the bridging line; and

an output line that connects between an output port of the high pressure selective valve and the pilot port of the switching valve.

9. The hydraulic system of a construction machine according to claim 2 , wherein

the main pump includes a plurality of main pumps,

the unloading valve includes a plurality of unloading valves corresponding to the respective main pumps,

the second solenoid proportional valve includes a plurality of second solenoid proportional valves corresponding to the respective unloading valves, and

the pilot line includes:

a bridging line that connects secondary pressure lines to each other, the secondary pressure lines extending from the respective second solenoid proportional valves;

a high pressure selective valve provided on the bridging line; and

an output line that connects between an output port of the high pressure selective valve and the pilot port of the switching valve.

10. The hydraulic system of a construction machine according to claim 1 , wherein

the main pump includes a plurality of main pumps,

the unloading valve includes a plurality of unloading valves corresponding to the respective main pumps,

the second solenoid proportional valve includes a plurality of second solenoid proportional valves corresponding to the respective unloading valves, and

the pilot line includes:

a bridging line that connects secondary pressure lines to each other, the secondary pressure lines extending from the respective second solenoid proportional valves;

a high pressure selective valve provided on the bridging line; and

an output line that connects between an output port of the high pressure selective valve and the pilot port of the switching valve.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 22, 2022
From: KONDO, AKIHIRO; HATA, NAOKI; KINOSHITA, NOBUYUKI; IWABE, KAZUYA
To: KAWASAKI JUKOGYO KABUSHIKI KAISHA
Reel/Frame 059068/0702 →
Priority Claims (1)
JP JP2019-152659 · Aug 23, 2019 · national
Continuity (1)
Related Publication 20220316186A1 · Oct 6, 2022
Cited By (1)
US 12,674,475