IP Library › Granted Patent US 12,258,857
Granted Patent B2
US 12,258,857 · App. 17/647,887 · Granted Mar 25, 2025

Method to determine drilling-induced rock damage

Inventors: Xuekai Sun (Beijing, CN); Christopher Ayadiuno (Dhahran, SA)
Assignee: SAUDI ARABIAN OIL COMPANY
E21B49/00G01V1/50G01V2210/1299G01V2210/1429G01V2210/47G01V2210/6222
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,258,857
App. No.
17/647,887
Granted
Mar 25, 2025
Kind
B2
Abstract

Methods and systems for determining a drilling-induced rock damage map are disclosed. The method includes obtaining a sonic dataset, including sonic waveforms recorded at a plurality of source-receiver separations for a plurality of source positions along an axis of a wellbore. The method further includes determining a log of a first metric using the sonic dataset and determining a map of a second metric using the sonic dataset. The method still further includes determining the drilling-induced rock damage map based, at least in part, on the log of the first metric and the map of the second metric.

Claims (45)

1. A method of determining a drilling-induced rock damage map, comprising:

obtaining, using a sonic tool, a sonic dataset comprising a set of sonic waveforms recorded at each of a plurality of axial source positions along an axis of a wellbore,

wherein the sonic tool comprises at least one sonic source and a plurality of sonic receivers, and

wherein each of the set of sonic waveforms comprises a recording, by one of the plurality of sonic receivers, of sonic waves emitted by the sonic source;

determining, using a slowness time coherence method, a log of a P-wave slowness from the sonic dataset;

determining, using a tomographic method, a map of a P-wave velocity from the sonic dataset; and

determining the drilling-induced rock damage map by subtracting the log of the P-wave slowness from the map of the P-wave velocity at a plurality of depths along the axis of the wellbore.

2. The method of claim 1 , further comprising:

determining a wellbore completion plan based, at least in part, on the drilling-induced rock damage map; and

executing the wellbore completion plan,

wherein executing the wellbore completion plan comprises installing, in the wellbore, at least one downhole tool.

3. The method of claim 1 , wherein the log of the P-wave slowness comprises a single value for each of the plurality of axial source positions along the wellbore.

4. The method of claim 1 , wherein the tomographic method uses P-wave first break travel times.

5. The method of claim 1 , wherein the tomographic method comprises a radial tomography method.

6. The method of claim 1 , wherein the map of the P-wave velocity is a function of an axial position along the wellbore and a radial distance from a center of the wellbore.

7. The method of claim 2 , wherein the at least one downhole tool comprises an expandable screen.

8. A non-transitory computer readable medium storing instructions executable by a computer processor, the instructions comprising functionality for:

receiving, from a sonic tool, a sonic dataset, comprising a set of sonic waveforms recorded at each of a plurality of axial source positions along an axis of a wellbore, and

wherein the sonic tool comprises at least one sonic source and a plurality of sonic receivers, and

wherein each of the set of sonic waveforms comprises a recording, by one of the plurality of sonic receivers, of sonic waves emitted by the sonic source;

determining, using a slowness time coherence method, a log of a P-wave slowness from the sonic dataset;

determining, using a tomographic method, a map of a P-wave velocity from the sonic dataset;

determining a drilling-induced rock damage map based, by subtracting the log of the P-wave slowness from the map of the P-wave velocity at a plurality of depths along the axis of the wellbore;

determining a wellbore completion plan based, at least in part, on the drilling-induced rock damage map; and

wherein the wellbore completion plan comprises plans for installing, in the wellbore, at least one downhole tool.

9. The non-transitory computer readable medium of claim 8 , wherein the tomographic method uses P-wave first break travel times.

10. The non-transitory computer readable medium of claim 8 , wherein the log of the P-wave slowness comprises a single value for each of the plurality of axial source positions along the wellbore.

11. The non-transitory computer readable medium of claim 8 , wherein the tomographic method comprises a radial tomography method.

12. The non-transitory computer readable medium of claim 8 , wherein the map of the P-wave velocity is a function of an axial position along the wellbore and a radial distance from a center of the wellbore.

13. A system, comprising:

a sonic tool, configured to record a sonic dataset, comprising a set of sonic waveforms recorded at each of a plurality of axial source positions along an axis of a wellbore,

wherein the sonic tool comprises at least one sonic source and a plurality of sonic receivers, and

wherein each of the set of sonic waveforms comprises a recording, by one of the plurality of sonic receivers, of sonic waves emitted by the sonic; and

a computer system configured to:

receive the sonic dataset from the sonic tool;

determine, using a slowness time coherence method, a log of a P-wave slowness from the sonic dataset;

determine, using a tomographic method, a map of P-wave velocity from the sonic dataset;

determine a drilling-induced rock damage map by subtracting the log of the P-wave slowness from the map of the P-wave velocity at a plurality of depths along the axis of the wellbore; and

determine a wellbore completion plan based, at least in part, on the drilling-induced rock damage map.

14. The system of claim 13 , wherein the tomographic method uses P-wave first break travel times.

15. The system of claim 13 , wherein the tomographic method comprises a radial tomography method.

16. The system of claim 13 , wherein the map of the P-wave velocity is a function of an axial position along the wellbore and a radial distance from a center of the wellbore.

17. The system of claim 13 , further comprising: a conveyance mechanism attached to a downhole tool configured to execute the wellbore completion plan,

wherein executing the wellbore completion plan comprises installing, in the wellbore, at least one downhole tool.

18. The system of claim 17 , wherein the at least one downhole tool comprises an expandable screen.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 27, 2022
From: ARAMCO FAR EAST (BEIJING) BUSINESS SERVICES CO., LTD.
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 060205/0594 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 14, 2022
From: AYADIUNO, CHRISTOPHER
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 059597/0117 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 14, 2022
From: SUN, XUEKAI
To: ARAMCO FAR EAST (BEIJING) BUSINESS SERVICES CO., LTD.
Reel/Frame 059597/0120 →
Priority Claims (1)
CN 202111603470.3 · Dec 24, 2021 · national
Continuity (1)
Related Publication 20230203943A1 · Jun 29, 2023
References Cited (21)
US 6614360B1 · Leggett, III et al. · 2003 [cited by applicant]
US 7334651B2 · Wu · 2008 [cited by applicant]
US 7660195B2 · Mandal · 2010 [cited by examiner]
US 8811114B2 · Geerits et al. · 2014 [cited by applicant]
US 10544668B2 · Hori et al. · 2020 [cited by applicant]
US 20020116128A1 · Sinha · 2002 [cited by examiner]
US 20060235617A1 · Sinha · 2006 [cited by examiner]
US 20130255943A1 · Yeh · 2013 [cited by examiner]
US 20200301036A1 · Ramfjord · 2020 [cited by examiner]
CN 107605470A · 2018 [cited by examiner]
WO 2017210231A1 · 2017 [cited by applicant]
CN-107605470-A (machine translation) (Year: 2018). [cited by examiner]
Hornby (“Tomographic reconstruction of near-borehole slowness using refracted borehole sonic arrivals”, 1993. Geophysics, vol. 58, pp. 1726-1738) (Year: 1993). [cited by examiner]
Close, D., et al., “The Sound of Sonic: A Historical Perspective and Introduction to Acoustic Logging”, CSEG Recorder, May 2009, pp. 34-43 (10 pages). [cited by applicant]
Hornby, Brian E., “Tomographic reconstruction of near-borehole slowness using refracted borehole sonic arrivals”, Geophysics, Society of Exploration Geophysicists, vol. 58, No. 12, Dec. 1993, pp. 1726-1738 (13 pages). [cited by applicant]
Kimball, Christopher V. and Thomas L. Marzetta, “Semblance processing of borehole acoustic array data”, Geophysics, Society of Exploration Geophysicists, vol. 49, No. 3, Mar. 1984, pp. 274-281 (8 pages). [cited by applicant]
Sun, Xuekai, et al., “Improving the Accuracy of Acoustic Velocity Estimation from Monopole Waveforms”, SEG 2020: 2nd Borehole Geophysics Workshop, Society of Exploration Geophysicists, Nov. 2020, pp. 37-39 (3 pages). [cited by applicant]
Tang, Xiao-Ming, et al., “A curve-fitting technique for determining dispersion characteristics of guided elastic waves”, Geophysics, Society of Exploration Geophysicists, vol. 75, No. 3, May-Jun. 2010, pp. E153-E160 (8 … [cited by applicant]
Wu, Peter, et al., “A Case of Near-Borehole Shear Velocity Alteration”, SPWLA 34th Annual Logging Symposium, Jun. 1993, pp. 1-12 (12 pages). [cited by applicant]
Zeroug, Smaine, et al., “Monopole radial profiling of compressional slowness”, SEG/New Orleans 2006 Annual Meeting, 2006, pp. 354-358 (5 pages). [cited by applicant]
International Search Report and Written Opinion of the International Searching Authority issued in corresponding International Application No. PCT/US2022/053656, mailed Apr. 24, 2023 (16 pages). [cited by applicant]